Patent US5289368A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5289368A Expired / Lapsed US ⏱️ 0.0 years remaining

Force management system user interface

Assignee: IEX Corp
•
Filing: 1990-10-12
•
Granted: 1994-02-22
•
Expires: 2010-10-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A force management system includes a unique management display system for managing server schedules during a forecast time period. The system generates a schedule management screen which includes a timescale and a set of schedule activity codes for each server juxtaposed with the timescale to indicate the server's availability to respond to an event during the server's schedule. The system also generates a companion performance analysis screen. The performance analysis screen includes a timescale representation of forecast time period intervals, and displays call handling performance data for each interval comparing actual event load during the forecast time period with the event load expected to occur during the forecast time period.

Inventors

  • 👤 Beauford B. Jordan
  • 👤 Ronald M. Castonguay

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 03:31
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/06; G06Q10/063; G06Q10/0631; G06Q10/06311; G06Q10/06314; G06Q10/06315; G06Q10/0639; H; H04; H04M; H04M3/00; H04M3/22; H04M3/36; H04M3/42; H04M3/50; H04M3/51; H04M3/523; H04M2203/00; H04M2203/40; H04M2203/402

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 281 words
A force management system for planning, scheduling and managing personnel in an environment in which there is a constantly varying event load by time of day and by day of week, comprising: means for generating a forecast of an event load expected to occur during intervals of a forecast time period and a number of servers required to service the expected event load during each interval of the forecast time period; means responsive to the forecast for generating candidate tours for the servers, each candidate tour defining a work schedule for the forecast time period for one of the servers; means for assigning the servers to the candidate tours; means for generating a schedule for each server; and means for managing the server schedules during the forecast time period, the managing means including: a display; means for generating a schedule management screen on the display, the schedule management screen including a timescale and a set of schedule activity codes for each server juxtaposed with the timescale to indicate the server's availability to respond to an event during the server's schedule; means for generating a performance analysis screen on the display, the performance analysis screen including a timescale representation of the intervals and event handling performance data for each interval comparing actual event load during the forecast time period with the event load expected to occur during the forecast time period; means for editing the schedule activity codes in the schedule management screen to modify one or more server schedules; means for refreshing the performance analysis screen to reflect how the modified server schedules affect the event handling performance data; and means for switching between the schedule management and performance analysis screens.
Claim 2
Dependent Claim 281 words
A force management system for planning, scheduling and managing personnel in an environment in which there is a constantly varying event load by time of day and by day of week, comprising: means for generating a forecast of an event load expected to occur during intervals of a forecast time period and a number of servers required to service the expected event load during each interval of the forecast time period; means responsive to the forecast for generating candidate tours for the servers, each candidate tour defining a work schedule for the forecast time period for one of the servers; means for assigning the servers to the candidate tours; means for generating a schedule for each server; and means for managing the server schedules during the forecast time period, the managing means including: a display; means for generating a schedule management screen on the display, the schedule management screen including a timescale and a set of schedule activity codes for each server juxtaposed with the timescale to indicate the server's availability to respond to an event during the server's schedule; means for generating a performance analysis screen on the display, the performance analysis screen including a timescale representation of the intervals and event handling performance data for each interval comparing actual event load during the forecast time period with the event load expected to occur during the forecast time period; means for editing the schedule activity codes in the schedule management screen to modify one or more server schedules; means for refreshing the performance analysis screen to reflect how the modified server schedules affect the event handling performance data; and means for switching between the schedule management and performance analysis screens.
Claim 3
Dependent Claim 66 words
The force management system as described in claim 1 wherein the managing means further includes: means for processing actual event load data during the forecast time period and generating a reforecast of event loads expected to occur during remaining intervals of the forecast time period and a number of servers required to service the expected event load during each remaining interval of the forecast time period.
Claim 4
Dependent Claim 39 words
The force management system as described in claim 2 wherein the managing means further includes: means for receiving the reforecast and refreshing the performance analysis screen to reflect the reforecast for the remaining intervals of the forecast time period.
Claim 5
Dependent Claim 169 words
A force management system for managing personnel in an environment in which there is a constantly varying event load by time of day and by day of week using a forecast of one or more event variables expected to occur during intervals of a forecast time period, comprising: a display; means for generating a performance analysis screen on the display, the performance analysis screen including a timescale representation of the intervals and event handling performance data for each interval comparing actual event data for an event variable during the forecast time period with event data expected to occur for the event variable during the forecast time period; means for processing actual event data for the event variable during the forecast time period and generating a reforecast of event data expected to occur for the variable during remaining intervals of the forecast time period; and means, responsive to the processing means, for refreshing the performance analysis screen to reflect the reforecast for the remaining intervals of the forecast time period.
Claim 6
Dependent Claim 169 words
A force management system for managing personnel in an environment in which there is a constantly varying event load by time of day and by day of week using a forecast of one or more event variables expected to occur during intervals of a forecast time period, comprising: a display; means for generating a performance analysis screen on the display, the performance analysis screen including a timescale representation of the intervals and event handling performance data for each interval comparing actual event data for an event variable during the forecast time period with event data expected to occur for the event variable during the forecast time period; means for processing actual event data for the event variable during the forecast time period and generating a reforecast of event data expected to occur for the variable during remaining intervals of the forecast time period; and means, responsive to the processing means, for refreshing the performance analysis screen to reflect the reforecast for the remaining intervals of the forecast time period.
Claim 7
Dependent Claim 16 words
The force management system as described in claim 4 wherein the event variable is event load.
Claim 8
Dependent Claim 56 words
The force management system as described in claim 5 wherein the forecast includes a number of servers required to service the expected event load during each interval of the forecast time period and the reforecast includes a number of servers required to service the expected event load during each remaining interval of the forecast time period.
Claim 9
Dependent Claim 18 words
The force management system as described in claim 4 wherein the event variable is average event handling time.
Claim 10
Dependent Claim 17 words
The force management system as described in claim 4 wherein the event variable is a service level.
Claim 11
Dependent Claim 96 words
The force management system as described in claim 4, further including: means for generating a schedule management screen on the display, the schedule management screen including a timescale and a set of schedule activity codes for each server juxtaposed with the timescale to indicate the server's availability to respond to an event during the server's schedule; means for editing the schedule activity codes in the schedule management screen to modify one or more server schedules; and means for refreshing the performance analysis screen to reflect how the modified server schedules affect the event handling performance data.
Claim 12
Dependent Claim 32 words
The force management system as described in claim 9 wherein the timescale of the schedule management screen identifies each hour of a daily shift and includes a representation for each quarter hour.
Claim 13
Dependent Claim 35 words
The force management system as described in claim 10 wherein the schedule activity codes for each quarter hour of the daily shift are located under the timescale to enable an operator to compare server schedules.
Claim 14
Dependent Claim 16 words
The force management system as described in claim 10 wherein the schedule activity codes are color-coded.

References Cited (Backward Citations)

US3593008A Cited
US4510351A Cited
US5040123A Cited
US5111391A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1997-02-21 1997-08-23 1998-02-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2001-02-21 2001-08-23 2002-02-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2005-02-21 2005-08-23 2006-02-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag