Claims Analysis
Total Claims: 22
Claim 1
Independent Claim
310 words
An integrated hardware multiprocess graphics scheduler for controlling a plurality of graphics generating subsystems which are used in a graphics rendering processor, said graphics rendering processor interfacing to a host processor that generates command and control signals for said graphics rendering processor, said graphics processor comprising a display memory for storing data and instructions for said plurality of graphics generating subsystems and a bit mapped memory for storing the signals representing said generated graphics for ultimate display on a display system, wherein said graphics scheduler is characterized by: instruction decoding means for receiving and decoding instructions transferred to said scheduler from said display memory by said graphics rendering processor and said host processor; bus means coupled to the instruction decoding means for transferring said decoded instructions to one or more of the controlled plurality of graphics generating subsystems; and task control means coupled to the bus means and each of the controlled plurality of graphics generating subsystems for monitoring an operative status of each of the controlled plurality of graphics generating subsystems and enabling respective ones thereof to perform their particular tasks; said task control means including status monitoring means for monitoring the operative status of each of the controlled plurality of graphics generating subsystems so that a controlled subsystem is enabled to receive and process data and instructions only when it is ready to receive and process them, and the controlled subsystem is enabled to output the processed data only when an element selected to receive the processed data has generated a status signal indicating that it is ready to receive the output data, and enabling means for individually enabling each of the controlled subsystems to accept and process the instructions and data sent thereto and for selectively transmitting the processed data to a second controlled subsystem for further processing or to the display memory for storage or display.
Claim 2
Dependent Claim
310 words
An integrated hardware multiprocess graphics scheduler for controlling a plurality of graphics generating subsystems which are used in a graphics rendering processor, said graphics rendering processor interfacing to a host processor that generates command and control signals for said graphics rendering processor, said graphics processor comprising a display memory for storing data and instructions for said plurality of graphics generating subsystems and a bit mapped memory for storing the signals representing said generated graphics for ultimate display on a display system, wherein said graphics scheduler is characterized by: instruction decoding means for receiving and decoding instructions transferred to said scheduler from said display memory by said graphics rendering processor and said host processor; bus means coupled to the instruction decoding means for transferring said decoded instructions to one or more of the controlled plurality of graphics generating subsystems; and task control means coupled to the bus means and each of the controlled plurality of graphics generating subsystems for monitoring an operative status of each of the controlled plurality of graphics generating subsystems and enabling respective ones thereof to perform their particular tasks; said task control means including status monitoring means for monitoring the operative status of each of the controlled plurality of graphics generating subsystems so that a controlled subsystem is enabled to receive and process data and instructions only when it is ready to receive and process them, and the controlled subsystem is enabled to output the processed data only when an element selected to receive the processed data has generated a status signal indicating that it is ready to receive the output data, and enabling means for individually enabling each of the controlled subsystems to accept and process the instructions and data sent thereto and for selectively transmitting the processed data to a second controlled subsystem for further processing or to the display memory for storage or display.
Claim 3
Dependent Claim
34 words
The scheduler of claim 1 wherein the task control means is characterized by: means for controlling multiple interdependent ones of the plurality of graphics generating subsystems in response to data flow between the subsystems.
Claim 4
Dependent Claim
45 words
The scheduler of claim 1 wherein said status monitoring means is characterized by: source status monitoring means; destination status monitoring means; operation complete status monitoring means; a state register; and a status/enable bus coupled between each of the status monitoring means and the state register.
Claim 5
Dependent Claim
37 words
The scheduler of claim 1 wherein the enabling means is characterized by: enabling logic coupled to each of the status monitoring means for enabling respective ones of the controlled subsystems to process data and instructions sent thereto.
Claim 6
Dependent Claim
22 words
The scheduler of claim 1 wherein the subsystems are characterized by: graphics generators for generating graphics primitives and alphanumeric and symbolic characters.
Claim 7
Dependent Claim
38 words
The scheduler of claim 5 wherein the graphics processor is further characterized by: a block texturing and clip mask generator for combining the signals from said primitive and character generators and to produce a final graphics display signal.
Claim 8
Dependent Claim
393 words
An integrated hardware multiprocess graphics scheduler for controlling a plurality of graphics generating subsystems which are used in a graphics rendering processor, said graphics rendering processor interfacing to a host processor that generates command and control signals for said graphics rendering processor, said graphics processor comprising a display memory for storing data and instructions for said plurality of graphics generating subsystems and a bit mapped memory for storing the signals representing said generated graphics for ultimate display on a display system, and wherein said plurality of graphics generating subsystems comprise graphics generators for generating graphics primitives and alphanumeric and symbolic characters, said graphics rendering processor comprising a block texturing and clip mask generator adapted to combine the signals from said primitive and character generators and to produce a final graphics display signal, said graphics rendering processor comprising means for transferring blocks of data from said plurality of graphics generating subsystems to said display memory at a predetermined address therein and for writing said combined signals into the bit mapped memory of the graphic display system, said graphics scheduler comprising: instruction decoding measn for receiving and decoding instructions transferred to said scheduler from said display memory by said graphics rendering processor and said host processor; bus means coupled to the instruction decoding means for transferring said decoded instructions to one or more of the controlled plurality of graphics generating subsystems; and task control means coupled to the bus means and each of the controlled plurality of graphics generating subsystems for monitoring an operative status of each of the controlled plurality of graphics generating subsystems and enabling respective ones thereof to perform their particular tasks; said task control means including status monitoring means for monitoring the operative status of each of the controlled plurality of graphics generating subsystems so that a controlled subsystem is enabled to receive and process data and instructions only when it is ready to receive and process them, and the controlled subsystem is enabled to output the processed data only when an element selected to receive the processed data has generated a status signal indicating that it is ready to receive the output data, and enabling means for individually enabling each of the controlled plurality of graphics generating subsystems to accept and process data to a second controlled subsystem for further processing or to the display memory for storage or display.
Claim 9
Dependent Claim
393 words
An integrated hardware multiprocess graphics scheduler for controlling a plurality of graphics generating subsystems which are used in a graphics rendering processor, said graphics rendering processor interfacing to a host processor that generates command and control signals for said graphics rendering processor, said graphics processor comprising a display memory for storing data and instructions for said plurality of graphics generating subsystems and a bit mapped memory for storing the signals representing said generated graphics for ultimate display on a display system, and wherein said plurality of graphics generating subsystems comprise graphics generators for generating graphics primitives and alphanumeric and symbolic characters, said graphics rendering processor comprising a block texturing and clip mask generator adapted to combine the signals from said primitive and character generators and to produce a final graphics display signal, said graphics rendering processor comprising means for transferring blocks of data from said plurality of graphics generating subsystems to said display memory at a predetermined address therein and for writing said combined signals into the bit mapped memory of the graphic display system, said graphics scheduler comprising: instruction decoding measn for receiving and decoding instructions transferred to said scheduler from said display memory by said graphics rendering processor and said host processor; bus means coupled to the instruction decoding means for transferring said decoded instructions to one or more of the controlled plurality of graphics generating subsystems; and task control means coupled to the bus means and each of the controlled plurality of graphics generating subsystems for monitoring an operative status of each of the controlled plurality of graphics generating subsystems and enabling respective ones thereof to perform their particular tasks; said task control means including status monitoring means for monitoring the operative status of each of the controlled plurality of graphics generating subsystems so that a controlled subsystem is enabled to receive and process data and instructions only when it is ready to receive and process them, and the controlled subsystem is enabled to output the processed data only when an element selected to receive the processed data has generated a status signal indicating that it is ready to receive the output data, and enabling means for individually enabling each of the controlled plurality of graphics generating subsystems to accept and process data to a second controlled subsystem for further processing or to the display memory for storage or display.
Claim 10
Dependent Claim
32 words
The scheduler of claim 7 wherein the task control means comprises: means for controlling multiple interdependent ones of the plurality of graphics generating subsystems in response to data flow between the subsystems.
Claim 11
Dependent Claim
45 words
The scheduler of claim 7 wherein said status monitoring means is characterized by: source status monitoring means; destination status monitoring means; operation complete status monitoring means; a state register; and a status/enable bus coupled between each of the status monitoring means and the state register.
Claim 12
Dependent Claim
35 words
The scheduler of claim 7 wherein the enabling means comprises: enabling logic coupled to each of the status monitoring means for enabling respective ones of the controlled subsystems to process data and instructions sent thereto.
Claim 13
Dependent Claim
35 words
The scheduler of claim 7 wherein said task control means comprises means for generating a signal indicating that a controlled subsystem has finished its current processing operation and is ready to perform a further operation.
Claim 14
Dependent Claim
35 words
The scheduler of claim 7 wherein said task control means comprises means for generating a signal indicating that a controlled subsystem has finished its current processing operation and is ready to perform a further operation.
Claim 15
Dependent Claim
292 words
An integrated hardware multiprocess graphics scheduler for controlling a plurality of graphics generating subsystems which are used in a graphics rendering processor, said graphics rendering processor interfacing to a host processor that generates command and control signals for said graphics rendering processor, said graphics rendering processor comprising a display memory for storing data and instructions for said subsystems and a bit mapped memory for storing the signals representing said generated graphics for ultimate display on a display system, wherein said graphics scheduler characterized by: instruction decoding means for receiving and decoding instructions transferred to said scheduler from said display memory by said graphics rendering processor and said host processor; bus means coupled to the instruction decoding means for transferring said decoded instructions to one or more of the controlled subsystems; and task control means coupled to the bus means and each of the controlled subsystems for monitoring an operative status of each of the controlled subsystems and enabling respective ones thereof to perform their particular tasks, and wherein the control means comprises: status monitoring means for monitoring the operative status of each of the controlled subsystems so that a controlled subsystem is enabled to receive and process data and instructions only when it is ready to receive and process them, and the controlled subsystem is enabled to output the processed data only when an element selected to receive the processed data has generated a status signal indicating that it is ready to receive the output data; and enabling means for individually enabling each of the controlled subsystems to accept and process the instructions and data sent thereto and for transmitting the processed data to a second controlled subsystem as input for further processing or to the display memory for storage or display.
Claim 16
Dependent Claim
292 words
An integrated hardware multiprocess graphics scheduler for controlling a plurality of graphics generating subsystems which are used in a graphics rendering processor, said graphics rendering processor interfacing to a host processor that generates command and control signals for said graphics rendering processor, said graphics rendering processor comprising a display memory for storing data and instructions for said subsystems and a bit mapped memory for storing the signals representing said generated graphics for ultimate display on a display system, wherein said graphics scheduler characterized by: instruction decoding means for receiving and decoding instructions transferred to said scheduler from said display memory by said graphics rendering processor and said host processor; bus means coupled to the instruction decoding means for transferring said decoded instructions to one or more of the controlled subsystems; and task control means coupled to the bus means and each of the controlled subsystems for monitoring an operative status of each of the controlled subsystems and enabling respective ones thereof to perform their particular tasks, and wherein the control means comprises: status monitoring means for monitoring the operative status of each of the controlled subsystems so that a controlled subsystem is enabled to receive and process data and instructions only when it is ready to receive and process them, and the controlled subsystem is enabled to output the processed data only when an element selected to receive the processed data has generated a status signal indicating that it is ready to receive the output data; and enabling means for individually enabling each of the controlled subsystems to accept and process the instructions and data sent thereto and for transmitting the processed data to a second controlled subsystem as input for further processing or to the display memory for storage or display.
Claim 17
Dependent Claim
45 words
The scheduler of claim 13 wherein said status monitoring means is characterized by: source status monitoring means; destination status monitoring means; operation complete status monitoring means; a state register; and a status/enable bus coupled between each of the status monitoring means and the state register.
Claim 18
Dependent Claim
37 words
The scheduler of claim 13 wherein the enabling means is characterized by: enabling logic coupled to each of the status monitoring means for enabling respective ones of the controlled subsystems to process data and instructions sent thereto.
Claim 19
Dependent Claim
388 words
An integrated hardware multiprocess graphics scheduler for controlling a plurality of graphics generating subsystems which are used in a graphics rendering processor, said graphics rendering processor interfacing to a host processor that generates command and control signals for said graphics rendering processor, said graphics rendering processor comprising a display memory for storing data and instructions for said subsystems and a bit mapped memory for storing the signals representing said generated graphics for ultimate display on a display system, and wherein said subsystems comprise graphics generators for generating graphics primitives and alphanumeric and symbolic characters, said graphics rendering processor comprising a block texturing and clip mask generator adapted to combine the signals from said primitive and character generators and to produce a final graphics display signal, said graphics processor comprising means for transferring blocks of data from said subsystems to said display memory at a predetermined address therein and for writing said combined signals into the bit mapped memory of the graphic display system, said graphics scheduler comprising: instruction decoding means for receiving and decoding instructions transferred to said scheduler from said display memory by said graphics rendering processor and said host processor; bus means coupled to the instruction decoding means for transferring said decoded instructions a selected number of the controlled plurality of graphics generating subsystems; and task control means coupled to the bus means and each of the controlled plurality of graphics generating subsystems for monitoring an operative status of each of the controlled subsystems and enabling respective ones thereof to perform their particular tasks, and wherein the control means comprises: status monitoring means for monitoring the operative status of each of the controlled plurality of graphics generating subsystems so that a controlled subsystem is enabled to receive and process data and instructions only when it is ready to receive and process them, and the controlled subsystem is enabled to output the processed data only when an element selected to receive the processed data has generated a status signal indicating that it is ready to receive the output data; and enabling means for individually enabling each of the controlled plurality of graphics generating subsystems to accept and process the instructions and data sent thereto and for transmitting the processed data to a second controlled subsystem for further processing or to the display memory for storage or display.
Claim 20
Dependent Claim
388 words
An integrated hardware multiprocess graphics scheduler for controlling a plurality of graphics generating subsystems which are used in a graphics rendering processor, said graphics rendering processor interfacing to a host processor that generates command and control signals for said graphics rendering processor, said graphics rendering processor comprising a display memory for storing data and instructions for said subsystems and a bit mapped memory for storing the signals representing said generated graphics for ultimate display on a display system, and wherein said subsystems comprise graphics generators for generating graphics primitives and alphanumeric and symbolic characters, said graphics rendering processor comprising a block texturing and clip mask generator adapted to combine the signals from said primitive and character generators and to produce a final graphics display signal, said graphics processor comprising means for transferring blocks of data from said subsystems to said display memory at a predetermined address therein and for writing said combined signals into the bit mapped memory of the graphic display system, said graphics scheduler comprising: instruction decoding means for receiving and decoding instructions transferred to said scheduler from said display memory by said graphics rendering processor and said host processor; bus means coupled to the instruction decoding means for transferring said decoded instructions a selected number of the controlled plurality of graphics generating subsystems; and task control means coupled to the bus means and each of the controlled plurality of graphics generating subsystems for monitoring an operative status of each of the controlled subsystems and enabling respective ones thereof to perform their particular tasks, and wherein the control means comprises: status monitoring means for monitoring the operative status of each of the controlled plurality of graphics generating subsystems so that a controlled subsystem is enabled to receive and process data and instructions only when it is ready to receive and process them, and the controlled subsystem is enabled to output the processed data only when an element selected to receive the processed data has generated a status signal indicating that it is ready to receive the output data; and enabling means for individually enabling each of the controlled plurality of graphics generating subsystems to accept and process the instructions and data sent thereto and for transmitting the processed data to a second controlled subsystem for further processing or to the display memory for storage or display.
Claim 21
Dependent Claim
45 words
The scheduler of claim 16 wherein said status monitoring means is characterized by: source status monitoring means; destination status monitoring means; operation complete status monitoring means; a state register; and a status/enable bus coupled between each of the status monitoring means and the state register.
Claim 22
Dependent Claim
35 words
The scheduler of claim 16 wherein the enabling means comprises: enabling logic coupled to each of the status monitoring means for enabling respective ones of the controlled subsystems to process data and instructions sent thereto.