← Back to Patent Explorer
US5237830A Expired / Lapsed US ⏱️ 0.0 years remaining

Defrost control method and apparatus

Assignee: Ranco Inc of Delaware
•
Filing: 1992-01-24
•
Granted: 1993-08-24
•
Expires: 2012-01-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A defrost controller for a refrigeration system. The system includes a circuit having a programmable controller which monitors compressor demand from a thermostat and uses alternating current cycles of a line voltage to control on and off cycles for a defrost mode of the refrigeration system. An anti-short cycle feature is optionally included to inhibit compressor operation for a predetermined interval each time the compressor is disabled.

Inventors

  • 👤 Charles D. Grant

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 13:07
CPC Classifications
F; F25; F25D; F25D21/00; F25D21/002; F25D21/006; G; G05; G05B; G05B19/00; G05B19/02; G05B19/04; G05B19/042; G05B19/0428

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 118 words
Apparatus for use with a refrigeration system wherein refrigerant circulates through a heat exchanger comprising: a. control means for monitoring compressor run time by counting cycles of an AC line voltage when the compressor is running including a programmable controller having an input that can be coupled to a thermostat for monitoring a heating or cooling demand signal and having a defrost output for outputting a defrost signal after a programmable period of compressor run time as indicated by the number of AC line cycles counted during the presence of the demand signal at said input; and b. defrost means coupled to the programmable controller for defrosting the heat exchanger in response to receipt of a defrost signal.
Claim 2
Dependent Claim 118 words
Apparatus for use with a refrigeration system wherein refrigerant circulates through a heat exchanger comprising: a. control means for monitoring compressor run time by counting cycles of an AC line voltage when the compressor is running including a programmable controller having an input that can be coupled to a thermostat for monitoring a heating or cooling demand signal and having a defrost output for outputting a defrost signal after a programmable period of compressor run time as indicated by the number of AC line cycles counted during the presence of the demand signal at said input; and b. defrost means coupled to the programmable controller for defrosting the heat exchanger in response to receipt of a defrost signal.
Claim 3
Dependent Claim 43 words
The apparatus of claim 1 wherein the programmable controller includes a compressor output for controlling compressor operation and timer means for inhibiting compressor operation for a predetermined time interval after each period of compressor run time to prevent short cycling of the compressor.
Claim 4
Dependent Claim 42 words
The control apparatus of claim 1 wherein the programmable controller comprises a counter for counting AC cycles of the line voltage and means for resetting the counter each time a defrost cycle is started and each time a defrost cycle is completed.
Claim 5
Dependent Claim 91 words
The apparatus of claim 3 wherein the programmable controller includes input means for setting a defrost time interval and for setting a second non-defrosting time interval and wherein the controller compares an accumulated number of AC line cycles with a first value corresponding to the defrost time interval, resets the accumulated number and removes the defrost signal from the defrost output when the accumulated number reaches the first value, and then begins comparing an accumulated number of AC line cycles with a second value corresponding to the second non-defrosting time interval.
Claim 6
Dependent Claim 121 words
A refrigeration system control unit for governing defrosting of a system heat exchanger in response to sensed conditions; said control unit comprising a programmable controller having a first input for monitoring heating or cooling demands of a region, a second input for monitoring cycles of an alternating current power source and an output for initiating defrost of the heat exchanger, said programmable controller programmed to periodically check a status of the first and second inputs, update a count at the cycle rate of the second input during heating or cooling demand periods as indicated by the first input; and initiate a defrost of the heat exchanger after a predetermined heating or cooling demand period based upon the value of said count.
Claim 7
Dependent Claim 121 words
A refrigeration system control unit for governing defrosting of a system heat exchanger in response to sensed conditions; said control unit comprising a programmable controller having a first input for monitoring heating or cooling demands of a region, a second input for monitoring cycles of an alternating current power source and an output for initiating defrost of the heat exchanger, said programmable controller programmed to periodically check a status of the first and second inputs, update a count at the cycle rate of the second input during heating or cooling demand periods as indicated by the first input; and initiate a defrost of the heat exchanger after a predetermined heating or cooling demand period based upon the value of said count.
Claim 8
Dependent Claim 107 words
In a refrigeration system, a method for governing defrosting of a system heat exchanger; said method comprising the steps of sensing an alternating current signal that passes through a thermostat switch to activate a compressor motor during heating or cooling demand periods, subsequent to sensing a presence of the alternating current signal, counting cycles of an alternating current power source during the heating or cooling demand periods; and initiating a defrost of the heat exchanger after a predetermined cumulative heating or cooling demand period based upon a comparison between a count of said cycles and a defrost count corresponding to the cumulative heating or cooling demand period.
Claim 9
Dependent Claim 107 words
In a refrigeration system, a method for governing defrosting of a system heat exchanger; said method comprising the steps of sensing an alternating current signal that passes through a thermostat switch to activate a compressor motor during heating or cooling demand periods, subsequent to sensing a presence of the alternating current signal, counting cycles of an alternating current power source during the heating or cooling demand periods; and initiating a defrost of the heat exchanger after a predetermined cumulative heating or cooling demand period based upon a comparison between a count of said cycles and a defrost count corresponding to the cumulative heating or cooling demand period.
Claim 10
Dependent Claim 45 words
The method of claim 6 comprising the additional step of enabling the routing of refrigerant through the refrigeration system during the heating or cooling demands and additionally comprising the step of disabling said routing for a predetermined interval subsequent to a removal of the demand.
Claim 11
Dependent Claim 31 words
The method of claim 7 where the refrigeration system includes a compressor motor and wherein the disabling step prevents starting of the compressor motor for a time interval after it stops.
Claim 12
Dependent Claim 46 words
The method of claim 6 comprising the additional step of enabling the routing of refrigerant through the refrigeration system during the heating or cooling demands and additionally comprising the step of disabling said routing for a predetermined interval if the alternating current power source is disrupted.
Claim 13
Dependent Claim 49 words
The method of claim 6 wherein the step of counting alternating current power source cycles is performed by repeatedly sampling an alternating current signal for a number of times to assure the status of the alternating current signal is stable for at least the time interval of said sampling.
Claim 14
Dependent Claim 45 words
The method of claim 6 wherein the monitoring and counting steps are performed by a programmable controller and wherein a count stored by the controller is re-initialized if the defrost cycle is terminated in response to a sensed temperature above a predetermined set point temperature.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1996-08-23 1997-02-22 1997-08-24 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2000-08-23 2001-02-22 2001-08-24 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2004-08-23 2005-02-22 2005-08-24 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag