← Back to Patent Explorer
US5214384A Expired / Lapsed US ⏱️ 0.0 years remaining

Method including electrical self potential measurements for detecting multiphase flow in a cased hole

Assignee: Mobil Oil AS
•
Filing: 1991-07-24
•
Granted: 1993-05-25
•
Expires: 2011-07-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for time lapse electric logging in a cased hole in which electrodes are implanted in the casing or the hole is completed with a gravel packed non conductive, perforated liner that allows an open hole logging tool to be used for time-lapse logging. Thereafter, the implemented electrodes or a self-potential (SP) logging tool are used to monitor a steam-flooding EOR method by detecting two-phase flow with time lapse logging. A potential drop between the surface and zones of interest is measured with electrodes installed in a non-conductive casing or the SP logging tool.

Inventors

  • 👤 Eve S. Sprunt
  • 👤 Nizar F. Djabbarah

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 22:21
CPC Classifications
G; G01; G01V; G01V3/00; G01V3/18; G01V3/26; G01V3/265; E; E21; E21B; E21B43/00; E21B43/16; E21B43/164; E21B43/24; E21B47/00; E21B47/10; E21B47/113; E21B49/00

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 125 words
A time lapse electric logging method where self potential measurements are utilized to determine steam quality comprising: a) measuring electric self potential via a wellbore at various levels in a formation where it is desired to inject steam; b) thereafter injecting steam into said levels via the wellbore while measuring electric self potential at said levels; c) using any measurements of increased electric self potential at each level to detect continuously two-phase steam flow; and d) thereafter using measurements of a decrease in electric self potential at a level to detect one-phase steam flow thus indicating where steam breakthrough has occurred at a level and that steam quality at a level has increased because of a change from two-phase steam flow to one-phase steam flow.
Claim 2
Dependent Claim 125 words
A time lapse electric logging method where self potential measurements are utilized to determine steam quality comprising: a) measuring electric self potential via a wellbore at various levels in a formation where it is desired to inject steam; b) thereafter injecting steam into said levels via the wellbore while measuring electric self potential at said levels; c) using any measurements of increased electric self potential at each level to detect continuously two-phase steam flow; and d) thereafter using measurements of a decrease in electric self potential at a level to detect one-phase steam flow thus indicating where steam breakthrough has occurred at a level and that steam quality at a level has increased because of a change from two-phase steam flow to one-phase steam flow.
Claim 3
Dependent Claim 19 words
The method as recited in claim 1 where an increase in electric self potential reflects electrokinetic or streaming potential.
Claim 4
Dependent Claim 30 words
The method as recited in claim 1 where about a two to three fold increase in electric self potential indicates two phase steam flow instead of single phase steam flow.
Claim 5
Dependent Claim 33 words
The method as recited in claim 1 where steam entry into each level is used to evaluate vertical sweep efficiency and to mitigate steam breakthrough when steam enhanced oil recovery methods are utilized.
Claim 6
Dependent Claim 23 words
The method as recited in claim 1 where steam entry into each level is used to to accurately ascertain a steam injection profile.
Claim 7
Dependent Claim 28 words
The method as recited in claim 1 where the wellbore comprises a perforated nonconductive gravel packed liner which provides for maximum fluid communication between said wellbore and formation.
Claim 8
Dependent Claim 17 words
The method as recited in claim 1 where the wellbore comprises a perforated conductive or nonconductive liner.
Claim 9
Dependent Claim 15 words
The method as recited in claim 1 where the wellbore comprises a perforated fiberglass liner.
Claim 10
Dependent Claim 19 words
The method as recited in claim 1 where self potential measurements are obtained by time lapse self potential logging.
Claim 11
Dependent Claim 19 words
The method as recited in claim 1 where the wellbore comprises a conductive or nonconductive casing with implanted electrodes.
Claim 12
Dependent Claim 23 words
The method as recited in claim 1 where self potential measurements are used to detect steam and steam-foam fronts in a steam-foam process.
Claim 13
Dependent Claim 39 words
The method as recited in claim 1 where the borehole comprises a conductive or nonconductive casing with implanted electrodes where a potential drop is taken as a measure of the electrical self potential and is indicative of steam quality.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1996-05-24 1996-11-23 1997-05-25 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2000-05-24 2000-11-23 2001-05-25 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2004-05-24 2004-11-23 2005-05-25 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag