Abstract
Abstract A method for time lapse electric logging in a cased hole in which electrodes are implanted in the casing or the hole is completed with a gravel packed non conductive, perforated liner that allows an open hole logging tool to be used for time-lapse logging. Thereafter, the implemented electrodes or a self-potential (SP) logging tool are used to monitor a steam-flooding EOR method by detecting two-phase flow with time lapse logging. A potential drop between the surface and zones of interest is measured with electrodes installed in a non-conductive casing or the SP logging tool.
Inventors
- 👤 Eve S. Sprunt
- 👤 Nizar F. Djabbarah
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-27 22:21
CPC Classifications
G; G01; G01V; G01V3/00; G01V3/18; G01V3/26; G01V3/265; E; E21; E21B; E21B43/00; E21B43/16; E21B43/164; E21B43/24; E21B47/00; E21B47/10; E21B47/113; E21B49/00
Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
125 words
A time lapse electric logging method where self potential measurements are utilized to determine steam quality comprising: a) measuring electric self potential via a wellbore at various levels in a formation where it is desired to inject steam; b) thereafter injecting steam into said levels via the wellbore while measuring electric self potential at said levels; c) using any measurements of increased electric self potential at each level to detect continuously two-phase steam flow; and d) thereafter using measurements of a decrease in electric self potential at a level to detect one-phase steam flow thus indicating where steam breakthrough has occurred at a level and that steam quality at a level has increased because of a change from two-phase steam flow to one-phase steam flow.
Claim 2
Dependent Claim
125 words
A time lapse electric logging method where self potential measurements are utilized to determine steam quality comprising: a) measuring electric self potential via a wellbore at various levels in a formation where it is desired to inject steam; b) thereafter injecting steam into said levels via the wellbore while measuring electric self potential at said levels; c) using any measurements of increased electric self potential at each level to detect continuously two-phase steam flow; and d) thereafter using measurements of a decrease in electric self potential at a level to detect one-phase steam flow thus indicating where steam breakthrough has occurred at a level and that steam quality at a level has increased because of a change from two-phase steam flow to one-phase steam flow.
Claim 3
Dependent Claim
19 words
The method as recited in claim 1 where an increase in electric self potential reflects electrokinetic or streaming potential.
Claim 4
Dependent Claim
30 words
The method as recited in claim 1 where about a two to three fold increase in electric self potential indicates two phase steam flow instead of single phase steam flow.
Claim 5
Dependent Claim
33 words
The method as recited in claim 1 where steam entry into each level is used to evaluate vertical sweep efficiency and to mitigate steam breakthrough when steam enhanced oil recovery methods are utilized.
Claim 6
Dependent Claim
23 words
The method as recited in claim 1 where steam entry into each level is used to to accurately ascertain a steam injection profile.
Claim 7
Dependent Claim
28 words
The method as recited in claim 1 where the wellbore comprises a perforated nonconductive gravel packed liner which provides for maximum fluid communication between said wellbore and formation.
Claim 8
Dependent Claim
17 words
The method as recited in claim 1 where the wellbore comprises a perforated conductive or nonconductive liner.
Claim 9
Dependent Claim
15 words
The method as recited in claim 1 where the wellbore comprises a perforated fiberglass liner.
Claim 10
Dependent Claim
19 words
The method as recited in claim 1 where self potential measurements are obtained by time lapse self potential logging.
Claim 11
Dependent Claim
19 words
The method as recited in claim 1 where the wellbore comprises a conductive or nonconductive casing with implanted electrodes.
Claim 12
Dependent Claim
23 words
The method as recited in claim 1 where self potential measurements are used to detect steam and steam-foam fronts in a steam-foam process.
Claim 13
Dependent Claim
39 words
The method as recited in claim 1 where the borehole comprises a conductive or nonconductive casing with implanted electrodes where a potential drop is taken as a measure of the electrical self potential and is indicative of steam quality.
References Cited (Backward Citations)
US3496768A
Cited
US4253063A
Cited
US4523148A
Cited
US4629000A
Cited
US4470462A
Cited
US4501329A
Cited
SU1140079A2
Cited
US4523642A
Cited
US4633948A
Cited
US4756369A
Cited
US4916616A
Cited
US4804043A
Cited
US4817713A
Cited
US4903767A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1996-05-24 | 1996-11-23 | 1997-05-25 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2000-05-24 | 2000-11-23 | 2001-05-25 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2004-05-24 | 2004-11-23 | 2005-05-25 | $7700.00 | Window Closed / Lapsed |