Patent US5173648A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5173648A Expired / Lapsed US ⏱️ 0.0 years remaining

Numerical control method

Assignee: BAMBOZZI S/A
•
Filing: 1989-05-22
•
Granted: 1992-12-22
•
Expires: 2009-05-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract NC programs (11a-11d) are provided for corresponding ones of movable elements for prescribed axes, and the movable elements are moved by performing numerical control processing in numerical controllers (12a-12d) based on the NC programs. A plurality of axes to be synchronously controlled are designated by a synchronous axis command (SANC) inserted in the main NC program (11a), queuing commands (WNC) are inserted in the NC programs conforming to the movable elements which include the designated axes, and the corresponding movable elements are moved and controlled by performing numerical control processing while synchronization is achieved by the queuing commands.

Inventors

  • 👤 Hideaki Kawamura
  • 👤 Kentaro Fujibayashi
  • 👤 Takashi Endo

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 18:55
CPC Classifications
G; G05; G05B; G05B19/00; G05B19/02; G05B19/18; G05B19/408; G05B19/182; G05B2219/00; G05B2219/30; G05B2219/34; G05B2219/34344; G05B2219/50; G05B2219/50235; Y; Y02; Y02P; Y02P90/00; Y02P90/02

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 190 words
A numerical control method in which NC (numerical control) programs are provided for controlling corresponding movable elements performing machining by controlling prescribed axes, each movable element being moved by performing numerical control processing based on said NC programs, said method comprising the steps of: a) designating a plurality of synchronous control axes in one of the NC programs; b) inserting a queuing command in each of the NC programs corresponding to the movable elements performing machining which include said synchronous control axes; and c) controlling movement of the corresponding movable elements while synchronization is achieved by said queuing commands; wherein step (c) further comprises the steps of: c1) inserting said queuing command of each of said NC programs in front of a command for a machining operation to be synchronously controlled; c2) determining whether queuing has been commanded by any of the NC programs; c3) determining, if queuing has been commanded from one of the NC programs, whether queuing has been commanded from all of the other NC programs; and c4) executing, when queuing has been commanded from all of the NC programs, the command for the next machining operation.
Claim 2
Dependent Claim 190 words
A numerical control method in which NC (numerical control) programs are provided for controlling corresponding movable elements performing machining by controlling prescribed axes, each movable element being moved by performing numerical control processing based on said NC programs, said method comprising the steps of: a) designating a plurality of synchronous control axes in one of the NC programs; b) inserting a queuing command in each of the NC programs corresponding to the movable elements performing machining which include said synchronous control axes; and c) controlling movement of the corresponding movable elements while synchronization is achieved by said queuing commands; wherein step (c) further comprises the steps of: c1) inserting said queuing command of each of said NC programs in front of a command for a machining operation to be synchronously controlled; c2) determining whether queuing has been commanded by any of the NC programs; c3) determining, if queuing has been commanded from one of the NC programs, whether queuing has been commanded from all of the other NC programs; and c4) executing, when queuing has been commanded from all of the NC programs, the command for the next machining operation.
Claim 3
Dependent Claim 85 words
A numerical control method according to claim 1, wherein when there are two movable elements to be synchronously controlled and movement of one movable element influences movement of another movable element, a main-subordinate relationship is specified in advance in which one element is adopted as a main movable element and the other element as a subordinate movable element, and step c) includes revising, by numerical information from the main movable element, numerical information in said command for the machining operation in the subordinate movable element.

References Cited (Backward Citations)

US4513379A Cited
US4606001A Cited
US4860191A Cited
US4953082A Cited
US4931709A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1995-12-22 1996-06-22 1996-12-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1999-12-22 2000-06-22 2000-12-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2003-12-22 2004-06-22 2004-12-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag