← Back to Patent Explorer
US5166873A Expired / Lapsed US ⏱️ 0.0 years remaining

Process control device

Assignee: Yokogawa Electric Corp
•
Filing: 1990-08-30
•
Granted: 1992-11-24
•
Expires: 2010-08-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A manipulated variable to be applied to a process and a process variable, are gathered by data gathering apparatus. In a modeling apparatus, which includes a process model, internal parameters thereof are adjusted so that an output of the process model may match the process variable. Accuracy of the process model is calculated by an estimation accuracy operating apparatus. The modeling apparatus is started when the manipulated variable or process variable changes to become larger than a fixed value, and control constants are derived from the outputs of the modeling apparatus and the estimation accuracy operating apparatus. The gain constant of the process model is determined by the output of the process model and the process variable. The internal parameters are searched by a simplex method wherein the length of the component side which comprises an initial polygon is made longer than the sampling period of the data gathering apparatus and a simplex is remade at least once at the original coordinates when the parameters are settled by a one time simplex method. At the beginning of control a step like manipulated variable is applied to the process, and based on the response to the process variable at this time, initial values of a sampling period and control constants are obtained.

Inventors

  • 👤 Haruo Takatsu
  • 👤 Kinichi Kitano

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 14:21
CPC Classifications
G; G05; G05B; G05B1/00; G05B1/01; G05B13/00; G05B13/02; G05B13/04; G05B13/042

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 195 words
A self-adaptive controller using an internal process model, comprising means for generating process variable and set value; control operation means of calculating a manipulated variable which is to be applied to a process based on said process variable and set value; data gathering means for gathering a set of time series data from said manipulated variable and a set of time series data from said process variable for a predetermined period; modeling means, including a process model, for correcting the internal parameters of said set of time series data of said manipulated variable so that an output of said process model matches said set of times series data of said process variable; estimation accuracy operating means for calculating the accuracy of said process model; calculation instruction means for generating calculation instructions when changes of said process variable from a process and said manipulated variable from said control operation means exceed predetermined values; means for starting said modeling means in accordance with the calculation instructions from said calculation instruction means; and means for obtaining control operation parameters of said control operation means based on the outputs of said modeling means and said estimation accuracy operating means.
Claim 2
Dependent Claim 195 words
A self-adaptive controller using an internal process model, comprising means for generating process variable and set value; control operation means of calculating a manipulated variable which is to be applied to a process based on said process variable and set value; data gathering means for gathering a set of time series data from said manipulated variable and a set of time series data from said process variable for a predetermined period; modeling means, including a process model, for correcting the internal parameters of said set of time series data of said manipulated variable so that an output of said process model matches said set of times series data of said process variable; estimation accuracy operating means for calculating the accuracy of said process model; calculation instruction means for generating calculation instructions when changes of said process variable from a process and said manipulated variable from said control operation means exceed predetermined values; means for starting said modeling means in accordance with the calculation instructions from said calculation instruction means; and means for obtaining control operation parameters of said control operation means based on the outputs of said modeling means and said estimation accuracy operating means.
Claim 3
Dependent Claim 50 words
The device of claim 1, wherein said internal parameters comprise gain constant; and comprises means for calculating dead time and first order lag coefficient of said process model are based on the output of said process model and said process variable when said gain constant is made to be 1.
Claim 4
Dependent Claim 44 words
The device of claim 1, wherein said modeling means uses a simplex method to adjust each internal parameter of said process model, in which length of component side which comprises an initial polygon is made longer than sampling period in said data gathering means.
Claim 5
Dependent Claim 46 words
The device of claim 1, wherein said modeling means uses a simplex method to adjust each internal parameter of said process model, in which an initial polygon is remade at least once at the original coordinate when said internal parameters are settled by said simplex method.
Claim 6
Dependent Claim 219 words
A process control device, comprising control operation means wherein process variable and set value are inputted and based thereon, manipulated variable to be applied to a process is calculated; data gathering means which gathers said manipulated variable and said process variable for a predetermined period; step input generating means which applies a step input to said process; first monitoring means which monitors a first time width until said process variable changes to a first fixed level; sampling period calculating means, wherein sampling period is made a value of said first time width and said process variable is sampled by said data gathering means at said sampling period; second monitoring means which monitors a second time width until said process variable changes to a second fixed level higher than said first fixed level; sampling period correcting means which corrects, based on said first time width and said second time width, a sampling period calculated by said sampling period calculating means; modeling means which calculates, based on process data gathered by said data gathering means, control parameters by use of said process model; and wherein at the beginning of control, a step like manipulated variable is applied to the process by said step input generating means and control operation parameters are calculated by said model means based on time series data.
Claim 7
Dependent Claim 219 words
A process control device, comprising control operation means wherein process variable and set value are inputted and based thereon, manipulated variable to be applied to a process is calculated; data gathering means which gathers said manipulated variable and said process variable for a predetermined period; step input generating means which applies a step input to said process; first monitoring means which monitors a first time width until said process variable changes to a first fixed level; sampling period calculating means, wherein sampling period is made a value of said first time width and said process variable is sampled by said data gathering means at said sampling period; second monitoring means which monitors a second time width until said process variable changes to a second fixed level higher than said first fixed level; sampling period correcting means which corrects, based on said first time width and said second time width, a sampling period calculated by said sampling period calculating means; modeling means which calculates, based on process data gathered by said data gathering means, control parameters by use of said process model; and wherein at the beginning of control, a step like manipulated variable is applied to the process by said step input generating means and control operation parameters are calculated by said model means based on time series data.
Claim 8
Dependent Claim 234 words
A process control device, comprising control operation means wherein, at least, proportional operation and integral operation are applied to a deviation signal between process variable from a process and target control value and an obtained manipulated variable is outputted to said process; data gathering means which gathers said, manipulated variable and said process variable for a predetermined period; modeling means including a process model , wherein said process variable and said manipulated variable gathered by said data gathering means are inputted and process dynamic characteristic is estimated based on response waveform thereof; control operation parameter operating means wherein control operation parameters are calculated based on estimated result of said process dynamic characteristic obtained by said modeling means and set in said control operation means; step input generating means wherein, at an automatic control state, a step signal having a fixed time width is applied to the output of said control operation means; calculation instruction means wherein said process variable from a process and said manipulated variable from said control operation means are inputted and calculation instruction is generated when change of each signal exceeds a predetermined value; and wherein said data gathering means applies gathered data to modeling means in accordance with the calculation instruction from said calculation instruction means and said modeling means and said control operation parameter operating means are started in accordance with the calculation instruction from said calculation instruction means.
Claim 9
Dependent Claim 234 words
A process control device, comprising control operation means wherein, at least, proportional operation and integral operation are applied to a deviation signal between process variable from a process and target control value and an obtained manipulated variable is outputted to said process; data gathering means which gathers said, manipulated variable and said process variable for a predetermined period; modeling means including a process model , wherein said process variable and said manipulated variable gathered by said data gathering means are inputted and process dynamic characteristic is estimated based on response waveform thereof; control operation parameter operating means wherein control operation parameters are calculated based on estimated result of said process dynamic characteristic obtained by said modeling means and set in said control operation means; step input generating means wherein, at an automatic control state, a step signal having a fixed time width is applied to the output of said control operation means; calculation instruction means wherein said process variable from a process and said manipulated variable from said control operation means are inputted and calculation instruction is generated when change of each signal exceeds a predetermined value; and wherein said data gathering means applies gathered data to modeling means in accordance with the calculation instruction from said calculation instruction means and said modeling means and said control operation parameter operating means are started in accordance with the calculation instruction from said calculation instruction means.
Claim 10
Dependent Claim 244 words
A control device, comprising control operation means wherein, at least, proportional operation and integral operation are applied to a deviation signal between a process variable from a process and a target control value and an obtained manipulated variable is outputted to said process; process model simulating said process to which the manipulated variable output signal from said control operation means is applied, wherein internal parameters are made changeable; first band pass filter to which a signal from said process model is applied; second band pass filter having the same characteristic as that of said first band pass filter, to which a signal from said process is applied; calculation instruction means to which a signal from said process and a signal from said second band pass filter are applied, wherein search for parameters by which the difference between signals from said first and second band pass filters are made to be minimum, is conducted in response to the calculation instruction from said calculation instruction means and the parameters of said process model are made changeable based on the search result; control operation parameter operating means which calculates control operation parameters based on the search result by said process model parameter search means and sets these parameters in said control operation means; and wherein said process model, said first band pass filter, said model parameter search means and control operation parameter operating means are started in accordance with calculation instruction applied from said calculation instruction means.
Claim 11
Dependent Claim 244 words
A control device, comprising control operation means wherein, at least, proportional operation and integral operation are applied to a deviation signal between a process variable from a process and a target control value and an obtained manipulated variable is outputted to said process; process model simulating said process to which the manipulated variable output signal from said control operation means is applied, wherein internal parameters are made changeable; first band pass filter to which a signal from said process model is applied; second band pass filter having the same characteristic as that of said first band pass filter, to which a signal from said process is applied; calculation instruction means to which a signal from said process and a signal from said second band pass filter are applied, wherein search for parameters by which the difference between signals from said first and second band pass filters are made to be minimum, is conducted in response to the calculation instruction from said calculation instruction means and the parameters of said process model are made changeable based on the search result; control operation parameter operating means which calculates control operation parameters based on the search result by said process model parameter search means and sets these parameters in said control operation means; and wherein said process model, said first band pass filter, said model parameter search means and control operation parameter operating means are started in accordance with calculation instruction applied from said calculation instruction means.

References Cited (Backward Citations)

US3601588A Cited
US3767900A Cited
US3828171A Cited
US4195337A Cited
US4213175A Cited
US4607325A Cited
US4791548A Cited
US4975827A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1995-11-24 1996-05-25 1996-11-24 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1999-11-24 2000-05-25 2000-11-24 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2003-11-24 2004-05-25 2004-11-24 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag