Patent US5095272A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5095272A Expired / Lapsed US ⏱️ 0.0 years remaining

Methods for determining formation dip and strike using high frequency phase shift

Assignee: Halliburton Logging Services Inc
•
Filing: 1990-03-23
•
Granted: 1992-03-10
•
Expires: 2010-03-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A dipmeter has a coil forming a medium frequency field (e.g., five megahertz); the field interacts with the formation to form induced currents in the formations dependent on resistivity. The formation boundaries create a phase shift contrasting with the shift occurring in the formation so that a pair of closely spaced coils on a shoe locates relative transition of a formation boundary. The boundary is located by the several dipmeter arms.

Inventors

  • 👤 Paul Sinclair

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 16:01
CPC Classifications
G; G01; G01V; G01V3/00; G01V3/18; G01V3/26; G01V3/28; E; E21; E21B; E21B47/00; E21B47/02; E21B47/026

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 217 words
A method of determining bed boundary dip in a well borehole, comprising the steps of: (a) forming a moving AC field in the earth formations adjacent to a well borehole by causing an AC current flow in the megahertz frequency range through a transmitter coil wherein the field induces currents to flow in the formations adjacent to the well borehole wherein the phase shift of the induced currents are dependent on formation resistivity; (b) measuring phase shift at multiple azimuthal locations along the sidewall of the well borehole by moving along the sidewall of the well borehole at least three pair of longitudinally separated offset coil means each of which have field induced signals formed therein wherein the induced signals are compared to form at least three azimuthally separated phase shift signals; (c) signal processing said at least three phase shift signals by applying a normalized differential phase shift algorithm wherein a dimensionless quantity is computed for successive depth samples of phase shift at each of said at least three offset coil pairs for comparison and accurate correlation to determine dip and strike angles of bed boundaries versus depth; and (d) as a function of differential phase shift, determining movement of a bed boundary relative to each of said at least three pairs of said coil means.
Claim 2
Independent Claim 217 words
A method of determining bed boundary dip in a well borehole, comprising the steps of: (a) forming a moving AC field in the earth formations adjacent to a well borehole by causing an AC current flow in the megahertz frequency range through a transmitter coil wherein the field induces currents to flow in the formations adjacent to the well borehole wherein the phase shift of the induced currents are dependent on formation resistivity; (b) measuring phase shift at multiple azimuthal locations along the sidewall of the well borehole by moving along the sidewall of the well borehole at least three pair of longitudinally separated offset coil means each of which have field induced signals formed therein wherein the induced signals are compared to form at least three azimuthally separated phase shift signals; (c) signal processing said at least three phase shift signals by applying a normalized differential phase shift algorithm wherein a dimensionless quantity is computed for successive depth samples of phase shift at each of said at least three offset coil pairs for comparison and accurate correlation to determine dip and strike angles of bed boundaries versus depth; and (d) as a function of differential phase shift, determining movement of a bed boundary relative to each of said at least three pairs of said coil means.
Claim 3
Dependent Claim 18 words
The method of claim 1 including the step of observing differential phase shift increase to identify a boundary.
Claim 4
Dependent Claim 80 words
The method of claim 1 wherein the coil is centered in the well borehole on the axis thereof to form a field around the well borehole wherein the field is continuously formed along a portion of the well borehole, and positioning said offset coil means parallel to the well borehole axis to detect phase shift along the length of the well borehole so that relative movement of a formation boundary through the field forms a change in the phase shift.
Claim 5
Dependent Claim 23 words
The method of claim 3 including the step of offsetting said coil means by a distance along the axis of the well borehole.
Claim 6
Dependent Claim 14 words
The method of claim 4 wherein the offset distance is less than 0.5 inches.
Claim 7
Dependent Claim 15 words
The method of claim 1 wherein the phase shift is independent of the signal amplitude.
Claim 8
Dependent Claim 18 words
The method of claim 1 wherein the phase shift is measured at the frequency of the AC field.
Claim 9
Dependent Claim 39 words
The method of claim 1 wherein the offset coil means forms two separate signals, and including the steps of amplifying the two signals, and thereafter comparing the phase of the two signals to obtain a phase shift output signal.
Claim 10
Dependent Claim 40 words
The method of claim 8 including the step of mounting said offset coil means on an arm extending toward the sidewall of the well borehole, and further measuring additional differential phase shift signal at multiple locations around the well borehole.
Claim 11
Dependent Claim 30 words
The method of claim 1 wherein the offset coil means forms two separate signals and thereafter demodulating the phase of the two signals to obtain a phase shift output signal.
Claim 12
Dependent Claim 28 words
The method of claim 9 including the step of positioning said offset coil means in a sacrificial wear member for contact with the sidewall of the well borehole.
Claim 13
Dependent Claim 51 words
The method of claim 1 in which the algorithm includes taking the modulus of the difference between phase shift measured at two successive depths and dividing the result by the geometric mean of the two phase shifts, producing a dimensionless quantity indicative only of the spatial discontinuity of a bed boundary.

References Cited (Backward Citations)

US3551797A Cited
US4401947A Cited
US4422043A Cited
US4600887A Cited
EP0163574A2 Cited
US4739272A Cited
US4780678A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1995-03-10 1995-09-09 1996-03-10 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1999-03-10 1999-09-09 2000-03-10 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2003-03-10 2003-09-09 2004-03-10 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag