Patent US5063506A successfully refreshed from Google Patents.
← Back to Patent Explorer
US5063506A Expired / Lapsed US ⏱️ 0.0 years remaining

Cost optimization system for supplying parts

Assignee: International Business Machines Corp
•
Filing: 1989-10-23
•
Granted: 1991-11-05
•
Expires: 2009-10-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A cost estimation system estimates the cost of supplying parts to a manufacturing facility. The system comprises a first database for storing cost information for various supply methods including air freight, ocean freight, land freight, warehouse storage, plant storage and material handling costs. A user selects a supply method for the parts, and has the option to select a percentage of one type of transportation and a percentage of an alternate type of transportation to serve as a back-up. A user also enters delivery frequency data indicating one or more frequencies of delivery to base a cost estimation. A computer processor then estimates the cost of supplying the parts at the one or more frequencies of delivery and the selected supply method. Finally, the cost estimates are presented to a user.

Inventors

  • 👤 John C. Brockwell
  • 👤 Edward J. Collins

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 15:43
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/06; G06Q10/063; G06Q10/0631; G06Q10/06315; G06Q10/06316; G06Q10/0637; G06Q10/06375; G06Q10/08; G06Q10/087; G06Q10/0872; G06Q30/00; G06Q30/02; G06Q30/0283; G06Q30/04

Claims Analysis

Total Claims: 20
Claim 1
Independent Claim 188 words
A computer system for estimating the cost of supplying parts to a manufacturing facility at one or more delivery frequencies and a selected supply method, said system comprising: first database definition means for defining a first database to simultaneously store cost information for a plurality of alternate supply methods; option entry means for user selection of at least one of said supply methods for said parts, said supply method impacting the cost of supplying said parts to said manufacturing facility, said option entry means permitting a user to select a nonzero percentage of air transportation and a nonzero percentage of land transportation for said parts over the same leg of a supply route; data entry means for user entry of delivery frequency data indicating one or more preferred frequencies of delivery to base a cost estimation; storage means, coupled to said option entry means and said data entry means, for storing said selections and data; and processing means, coupled to said first database and said storage means, for estimating the cost of supplying said parts at said one or more frequencies of delivery and the selected supply method.
Claim 2
Dependent Claim 188 words
A computer system for estimating the cost of supplying parts to a manufacturing facility at one or more delivery frequencies and a selected supply method, said system comprising: first database definition means for defining a first database to simultaneously store cost information for a plurality of alternate supply methods; option entry means for user selection of at least one of said supply methods for said parts, said supply method impacting the cost of supplying said parts to said manufacturing facility, said option entry means permitting a user to select a nonzero percentage of air transportation and a nonzero percentage of land transportation for said parts over the same leg of a supply route; data entry means for user entry of delivery frequency data indicating one or more preferred frequencies of delivery to base a cost estimation; storage means, coupled to said option entry means and said data entry means, for storing said selections and data; and processing means, coupled to said first database and said storage means, for estimating the cost of supplying said parts at said one or more frequencies of delivery and the selected supply method.
Claim 3
Dependent Claim 18 words
A computer system as set forth in claim 1 wherein said supply methods comprise space and handling methods.
Claim 4
Dependent Claim 21 words
A computer system as set forth in claim 1 wherein said supply methods comprise just-in-time and warehouse store and deliver methods.
Claim 5
Dependent Claim 39 words
A computer system as set forth in claim 1 wherein said alternate supply methods comprise plant floor storage vs. warehouse storage methods, and the user can use said option entry means to select either one of said storage methods.
Claim 6
Dependent Claim 20 words
A computer system as set forth in claim 1 wherein said data entry means permits user entry of duty rates.
Claim 7
Dependent Claim 43 words
A computer system as set forth in claim 1 wherein said data entry means permits the entry of minimum and maximum delivery frequencies; and said processing means estimates costs based on a plurality of delivery frequencies between said minimum and maximum delivery frequencies.
Claim 8
Dependent Claim 24 words
A computer system as set forth in claim 6 wherein said processing means identifies an optimum one of said delivery frequencies for minimizing costs.
Claim 9
Dependent Claim 36 words
A computer system as set forth in claim 1 wherein said data entry means receives data entries defining a level of protective stock, and said processing means bases in part a cost estimation on said level.
Claim 10
Dependent Claim 19 words
A computer system as set forth in claim 1 wherein said supply method comprise air, ocean and land freight.
Claim 11
Dependent Claim 67 words
A computer system as set forth in claim 1 further comprising display means, coupled to said processing means, for displaying said cost estimate and an itemization of costs for separate elements of said cost estimate, said elements corresponding to said selected supply method; and means, coupled to said display means, for changing said selected supply method and directing said processor means to determine a new cost estimate.
Claim 12
Dependent Claim 22 words
A computer system as set forth in claim 1 wherein said percentages of air transportation and land transportation total one hundred percent.
Claim 13
Dependent Claim 164 words
A computer system for estimating the cost of supplying parts to a manufacturing facility, said system comprising: first database definition means for defining a first database to store cost information for a plurality of alternate transportation methods for the same leg of a supply route, and cost information for other components of a logistics plan; option entry means for user selection of a nonzero amount of use of one of said transportation methods and a nonzero amount of alternate use of another one of said transportation methods for the same leg of said supply route, and selection from said other components of said logistics plan; storage means, coupled to said option entry means, for storing said selections; and processing means, coupled to said first database and said storage means, for estimating the cost of supplying said parts at the selected amounts of use of said transportation methods for the same leg of said supply route and the other selected components of said logistics plan.
Claim 14
Dependent Claim 164 words
A computer system for estimating the cost of supplying parts to a manufacturing facility, said system comprising: first database definition means for defining a first database to store cost information for a plurality of alternate transportation methods for the same leg of a supply route, and cost information for other components of a logistics plan; option entry means for user selection of a nonzero amount of use of one of said transportation methods and a nonzero amount of alternate use of another one of said transportation methods for the same leg of said supply route, and selection from said other components of said logistics plan; storage means, coupled to said option entry means, for storing said selections; and processing means, coupled to said first database and said storage means, for estimating the cost of supplying said parts at the selected amounts of use of said transportation methods for the same leg of said supply route and the other selected components of said logistics plan.
Claim 15
Dependent Claim 29 words
A computer system as set forth in claim 12 wherein said amounts of use of said transportation methods for said leg of said supply route total one hundred percent.
Claim 16
Dependent Claim 43 words
A computer system as set forth in claim 12 wherein said option entry means permits said user to select a nonzero percentage of air transportation and a nonzero percentage of land transportation for said parts over the same leg of said supply route.
Claim 17
Dependent Claim 44 words
A computer system as set forth in claim 12 wherein said option entry means permits said user to select a nonzero percentage of international air transportation and a nonzero percentage of ocean transportation for said parts over the same leg of said supply route.
Claim 18
Dependent Claim 168 words
A computer system for estimating the cost of supplying parts to a manufacturing facility at a selected supply method, said system comprising: first database definition means for defining a first database to simultaneously store cost information for a plurality of alternate supply methods; option entry means for user selection of at least one of said supply methods for said parts, the selected supply method or methods impacting the cost of supplying said parts to said manufacturing facility, said option entry means permitting said user to select a nonzero percentage of one type of transportation and a nonzero percentage of another type of transportation for said parts over a same leg of a supply route; storage means, coupled to said option entry means, for storing said selection; and processing means, coupled to said first database and said storage means, for estimating the cost of supplying said parts based on a combination of the selected percentages of use of said transportation methods for the same leg of said supply route.
Claim 19
Dependent Claim 168 words
A computer system for estimating the cost of supplying parts to a manufacturing facility at a selected supply method, said system comprising: first database definition means for defining a first database to simultaneously store cost information for a plurality of alternate supply methods; option entry means for user selection of at least one of said supply methods for said parts, the selected supply method or methods impacting the cost of supplying said parts to said manufacturing facility, said option entry means permitting said user to select a nonzero percentage of one type of transportation and a nonzero percentage of another type of transportation for said parts over a same leg of a supply route; storage means, coupled to said option entry means, for storing said selection; and processing means, coupled to said first database and said storage means, for estimating the cost of supplying said parts based on a combination of the selected percentages of use of said transportation methods for the same leg of said supply route.
Claim 20
Dependent Claim 26 words
A computer system as set forth in claim 16 wherein said percentages of transportation for said same leg of said supply route total one hundred percent.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1994-11-04 1995-05-06 1995-11-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1998-11-04 1999-05-06 1999-11-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2002-11-04 2003-05-06 2003-11-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag