Patent US5023557A successfully refreshed from Google Patents.
US5023557A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Testing process for electronic devices
Assignee: Nokia Bell Labs
•
Filing: 1990-09-05
•
Granted: 1991-06-11
•
Expires: 2010-09-05
Abstract
Abstract Electronic devices such as hybrid integrated circuits such as those having test points spaced less than 1250 μm are advantageously evaluated utilizing a two-probe process. In this process the probes are moved between test points in a pattern that reduces movement distance without concern for any ordering imposed by the nets themselves or the test to be made. Additionally, the test is made so that the movement time is the limiting factor.
Inventors
- 👤 Joseph M. Moran
- 👤 Thomas C. Russell
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 05:17
CPC Classifications
G; G01; G01R; G01R1/00; G01R1/02; G01R1/06; G01R1/067; G01R1/06705
Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
167 words
A process for fabricating a body having electrically conductive nets that electrically interconnect in a desired pattern a plurality of nodes, said process comprising the steps of examining a plurality of said nets by a series of net tests, said net tests including at least two measurements made on said net to ensure the presence of said desired interconnection pattern and employing said body based on said measurements wherein said measurements are made using a first and second probe to contact said nodes for said measurements characterized in that said measurements are made such that for at least one net all said measurements to be made on said net are not performed before making at least one of said measurements on a second of said nets such that the total movement distance of the said probes for all said measurements is less than the total movement distance for said probes in a sequence wherein each of said net tests is completed before another net test is performed.
Claim 2
Dependent Claim
167 words
A process for fabricating a body having electrically conductive nets that electrically interconnect in a desired pattern a plurality of nodes, said process comprising the steps of examining a plurality of said nets by a series of net tests, said net tests including at least two measurements made on said net to ensure the presence of said desired interconnection pattern and employing said body based on said measurements wherein said measurements are made using a first and second probe to contact said nodes for said measurements characterized in that said measurements are made such that for at least one net all said measurements to be made on said net are not performed before making at least one of said measurements on a second of said nets such that the total movement distance of the said probes for all said measurements is less than the total movement distance for said probes in a sequence wherein each of said net tests is completed before another net test is performed.
Claim 3
Dependent Claim
13 words
The process of claim 1 wherein said body comprises a printed circuit board.
Claim 4
Dependent Claim
13 words
The process of claim 1 wherein said body comprises a hybrid integrated circuit.
Claim 5
Dependent Claim
12 words
The process of claim 1 wherein said body comprises advanced VLSI packaging.
Claim 6
Dependent Claim
12 words
The process of claim 1 wherein more than two probes are employed.
Claim 7
Dependent Claim
11 words
The process of claim 1 wherein said test includes capacitance measurement.
Claim 8
Dependent Claim
11 words
The process of claim 1 wherein said capacitance measurements are scaled.
Claim 9
Dependent Claim
19 words
The process of claim 1 wherein the time for testing is dominated by the time taken for said movements.
Claim 10
Dependent Claim
32 words
The process of claim 8 wherein said domination is ensured by maintaining a short time for making said measurement, and conveying electrical signals and preparing electrical signals relative to said movement time.
Claim 11
Dependent Claim
28 words
The process of claim 1 wherein said probes during said movement accelerate sufficiently fast so that said probes fail to reach maximum velocity before said movement is completed.
Claim 12
Dependent Claim
35 words
The process of claim 1 wherein contact between said probes and said body for said test is accomplished by movement including movement of said body in a direction perpendicular to the plane of said body.
Claim 13
Dependent Claim
35 words
The process of claim 1 wherein contact between said probes and said body for said test is accomplished by movement including movement of said probes in a direction perpendicular to the plane of said body.
Claim 14
Dependent Claim
40 words
The process of claim 1 wherein said constraint is avoided by making said movements between said measurements substantially by moving to the said pair of nodes to be tested closest to the previous pair of nodes in said measurement series.
Claim 15
Dependent Claim
19 words
The process of claim 1 wherein each of said nodes is identified as belonging to one of said nets.
References Cited (Backward Citations)
US3695680A
Cited
US4565966A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1994-06-10 | 1994-12-10 | 1995-06-11 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1998-06-10 | 1998-12-10 | 1999-06-11 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2002-06-10 | 2002-12-10 | 2003-06-11 | $7700.00 | Window Closed / Lapsed |