Abstract A method for reducing the amount of immunogenic and/or toxic substances in a building's indoor air. The method is particularly directed at reducing the level of gases generated by certain wood and/or petrochemical based building materials. The method also serves to reduce levels of electromagnetic radiation within the building.
Inventors
- 👤 Alex V. Delgado
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 18:53
CPC Classifications
E; E02; E02D; E02D31/00; E02D31/008; Y; Y10; Y10S; Y10S454/00; Y10S454/909
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
263 words
A method of constructing a building in order to minimize levels of immunogenic substances in the atmosphere contained in the building, wherein a portion of an overall construction process for the building employs a subprocess of construction comprising: excavating an area of the earth upon which the building will be placed; laying a gravel bed in the excavated area of the earth and thereby defining a gas permeable path over which gases emanating from underlying areas of the earth can be directed; surrounding the gravel bed with a pipe having perforations in fluid connection with the gas permeable path defined by the gravel bed; venting the pipe to the atmosphere; covering the gravel bed with a gas impermeable material in such a manner that said material establishes a substantially monolithic, gas impermeable barrier to any gases emanating from underlying areas of the earth; pouring a substantially monolithic layer of concrete over the gas impermeable barrier in order to establish a ground floor of the building; erecting an array of vertical joist elements, (wherein a major fraction of the individual joist elements comprising the array are made of a metallic material) in order to provide vertical support for an outside wall of said building; placing a wall forming material on the inside of the vertical joists, and placing a layer of a metallic, gas impermeable material on the inside of the exterior wall; electrically grounding the metal studs and metallic, gas impermeable material; and covering the layer of gas impermeable material with sheets of dry wall in order to form an inside wall surface.
Claim 2
Independent Claim
263 words
A method of constructing a building in order to minimize levels of immunogenic substances in the atmosphere contained in the building, wherein a portion of an overall construction process for the building employs a subprocess of construction comprising: excavating an area of the earth upon which the building will be placed; laying a gravel bed in the excavated area of the earth and thereby defining a gas permeable path over which gases emanating from underlying areas of the earth can be directed; surrounding the gravel bed with a pipe having perforations in fluid connection with the gas permeable path defined by the gravel bed; venting the pipe to the atmosphere; covering the gravel bed with a gas impermeable material in such a manner that said material establishes a substantially monolithic, gas impermeable barrier to any gases emanating from underlying areas of the earth; pouring a substantially monolithic layer of concrete over the gas impermeable barrier in order to establish a ground floor of the building; erecting an array of vertical joist elements, (wherein a major fraction of the individual joist elements comprising the array are made of a metallic material) in order to provide vertical support for an outside wall of said building; placing a wall forming material on the inside of the vertical joists, and placing a layer of a metallic, gas impermeable material on the inside of the exterior wall; electrically grounding the metal studs and metallic, gas impermeable material; and covering the layer of gas impermeable material with sheets of dry wall in order to form an inside wall surface.
Claim 3
Dependent Claim
29 words
The subprocess of construction of claim 1 wherein the gravel bed defining the gas permeable path is laid to a depth of from about three to about twelve inches.
Claim 4
Dependent Claim
52 words
The subprocess of construction of claim 1 wherein the pipe surrounding the gravel bed is (1) provided with permeations which are positioned to face the gravel bed, (2) laid in a continuous loop configuration around the gravel bed and (3) is vented to the atmosphere by means of a mechanical fan system.
Claim 5
Dependent Claim
30 words
The subprocess of construction of claim 1 wherein the gas impermeable material used for covering the gravel bed is constructed by laying overlapping strips of polyethelene over said gravel bed.
Claim 6
Dependent Claim
30 words
The subprocess of construction of claim 1 wherein the ground floor is provided with steel reinforcement bars and poured to a depth of from about three to about twelve inches.
Claim 7
Dependent Claim
39 words
The subprocess of claim 1 wherein the metallic, gas impermeable material placed on the inside of the exterior wall is an array of 1/8" foil-faced sheathing boards whose abuting edges are taped over to provide a gas impermeable barrier.
References Cited (Backward Citations)
US530646A
Cited
US3020618A
Cited
US3287866A
Cited
US4075810A
Cited
US4078347A
Cited
US4523875A
Cited
US4486986A
Cited
US4578912A
Cited
US4620398A
Cited
US4621476A
Cited
US4580487A
Cited
US4760674A
Cited
US4798034A
Cited
US4843786A
Cited
US4858521A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1994-04-01 | 1994-10-01 | 1995-04-02 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1998-04-01 | 1998-10-01 | 1999-04-02 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2002-04-01 | 2002-10-01 | 2003-04-02 | $7700.00 | Window Closed / Lapsed |