Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
118 words
A device for reducing the power consumption of cyclically operating equipment controlled by a time base and having periods of load interruption, said device comprising means connected to said equipment for detecting the beginning and end of load interruption periods of said equipment, means connected to said detecting means for inhibiting said time base by suppression of a clock signal supplied to said time base at the end of a period of predetermined duration following the beginning of a detected period of load interruption, and means connected to said detecting means for freeing said time base by restitution of said clock signal to said time base in response to the end of a detected period of load interruption.
Claim 2
Independent Claim
118 words
A device for reducing the power consumption of cyclically operating equipment controlled by a time base and having periods of load interruption, said device comprising means connected to said equipment for detecting the beginning and end of load interruption periods of said equipment, means connected to said detecting means for inhibiting said time base by suppression of a clock signal supplied to said time base at the end of a period of predetermined duration following the beginning of a detected period of load interruption, and means connected to said detecting means for freeing said time base by restitution of said clock signal to said time base in response to the end of a detected period of load interruption.
Claim 3
Dependent Claim
154 words
The device as claimed in claim 1, wherein said equipment is a packet time-division switcher in which I incoming time-division multiplex ways, where I is an integer equal to at least 1, are respectively connected to I input buffer queues and carry packets to be temporarily stored in said queues while waiting to be switched by said switcher, in which the duration of said predetermined duration period, at the end of which said time base is inhibited, is at least equal to a maximum period of time required by said switcher to switch a packet, and in which said detecting means are connected to each of said I queues and detect said beginning and end of a load interruption period as a function of I queue filling signalization signals which are respectively provided by said I queues and which each indicate empty and full filling states of the respective one of said I queues.
Claim 4
Dependent Claim
56 words
The device as claimed in claim 2, wherein said inhibiting means comprise a counter to determine said end of said predetermined duration period by counting of a set number of impulses of said clock signal, said counting being activated by said detecting means as soon as all said signalization signals are in said empty filling state.
Claim 5
Dependent Claim
31 words
The device as claimed in claim 2, wherein said detecting means comprises latch means for synchronizing and filtering said I signalization signals by sampling at the frequency of said clock signal.
Claim 6
Dependent Claim
72 words
The device as claimed in claim 2, wherein said freeing means comprise means for initializing said time base at a set state that is defined as a function of states of said signalization signals detected by said detecting means and of priorities assigned to said queues so that said switcher starts when said time base is freed by switching a first packet stored in the not-empty queue with the highest ranking priority.