Patent US4973386A successfully refreshed from Google Patents.
US4973386A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Passive acoustic power spectra to monitor and control processing
Assignee: ExxonMobil Technology and Engineering Co
•
Filing: 1988-06-29
•
Granted: 1990-11-27
•
Expires: 2008-06-29
Abstract
Abstract A process for the detection and measurement of wall coke at a specific location in a fluid bed coker through the measurement of the vibrations of the external shell of the coker at the location.
Inventors
- 👤 Andrew J. Callegari
- 👤 Eugene R. Elzinga, Jr.
- 👤 George D. Cody
- 👤 Roger W. Cohen
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-30 23:18
CPC Classifications
C; C10; C10B; C10B55/00; C10B55/02; C10B55/04; C10B55/08; C10B55/10; G; G01; G01B; G01B17/00; G01B17/02; G01N; G01N29/00; G01N29/04; G01N29/045; G01N29/046; G01N2291/00; G01N2291/02; G01N2291/028; G01N2291/02827; G01N2291/02854; Y; Y10; Y10S; Y10S208/00; Y10S208/01
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
158 words
A process for the non-intrusive passive acoustic detection and measurement of a change in thickness of a wall defining a reactor for processing material, wherein said change in thickness is due to erosion of said wall or material buildup on said wall using wall vibrations produced by a source within said reactor comprising: (a) measuring the wall vibration of said reactor wall and then determining a first power spectrum indicative of the measured wall vibrations as a function of frequency at a time t=0; (b) operating said reactor for a time, t; (c) measuring the wall vibrations of said reactor wall and then determining a second power spectrum indicative of the measured wall vibrations as a function of frequency at said time, t; (d) determining a frequency shift of a resonance on said first spectrum from the corresponding resonance on said second spectrum, and; (e) correlating said frequency shift with the change in thickness of the reactor wall.
Claim 2
Dependent Claim
158 words
A process for the non-intrusive passive acoustic detection and measurement of a change in thickness of a wall defining a reactor for processing material, wherein said change in thickness is due to erosion of said wall or material buildup on said wall using wall vibrations produced by a source within said reactor comprising: (a) measuring the wall vibration of said reactor wall and then determining a first power spectrum indicative of the measured wall vibrations as a function of frequency at a time t=0; (b) operating said reactor for a time, t; (c) measuring the wall vibrations of said reactor wall and then determining a second power spectrum indicative of the measured wall vibrations as a function of frequency at said time, t; (d) determining a frequency shift of a resonance on said first spectrum from the corresponding resonance on said second spectrum, and; (e) correlating said frequency shift with the change in thickness of the reactor wall.
Claim 3
Dependent Claim
34 words
The process of claim 1 wherein said reactor is a fluid bed coker reactor and said change in thickness of said wall is due to coke buildup on the interior surface of said wall.
Claim 4
Dependent Claim
28 words
The process of claim 1 wherein said steps of measuring said wall vibrations are performed by using an accelerometer attached to the exterior surface of said reactor wall.
Claim 5
Dependent Claim
67 words
The process of claim 1 wherein said step of correlating said frequency shift with the change in thickness of said wall, D i (t), is performed using ##EQU2## where f i (t) is the frequency of said resonance at said time, t, f i (o) is the frequency of said resonance at said time, t=0, and C is the effective compressional sound velocity of said reactor wall.
Claim 6
Dependent Claim
18 words
The process of claim 1 further comprising the step of displaying said change in thickness of said wall.
Claim 7
Dependent Claim
20 words
The process of claim 1 wherein said source for producing said wall vibrations is an open flame within said reactor.
References Cited (Backward Citations)
US2882223A
Cited
US2788312A
Cited
US2888398A
Cited
US2808368A
Cited
US4095474A
Cited
US4285241A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1993-11-26 | 1994-05-28 | 1994-11-27 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1997-11-26 | 1998-05-28 | 1998-11-27 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2001-11-26 | 2002-05-28 | 2002-11-27 | $7700.00 | Window Closed / Lapsed |