Patent US4893494A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4893494A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and system for testing safety relief valves

Assignee: Management Services International Inc
•
Filing: 1988-03-31
•
Granted: 1990-01-16
•
Expires: 2008-03-31
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method and system for testing safety relief valves utilizes a reservoir of high pressure fluid which is metered into a smaller pressure vessel in communication with the safety relief valve to be tested. The method and system permits a safety relief valve to be tested with air as well as water.

Inventors

  • 👤 Waring F. Hart

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 16:54
CPC Classifications
F; F16; F16K; F16K37/00; F16K37/0075; F16K37/0083; F16K37/0091

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 221 words
A method for testing a safety relief valve comprising the steps of: (a) disposing a first pressure vessel in fluid communication with a reservoir of high pressure fluid; (b) disposing between the first pressure vessel and the reservoir, a first means for controlling the fluid flow between the first pressure vessel and the reservoir; (c) maintaining the pressure of the high pressure fluid in the reservoir at a substantially greater pressure than the pressure in the first pressure vessel; (d) disposing the safety relief valve in unrestricted fluid communication with a second pressure vessel; the second pressure vessel being disposed between the first pressure vessel and the safety relief valve, the first pressure vessel having a larger volume than the second pressure vessel; (e) disposing between the first and second pressure vessels, a second means for controlling fluid flow between the first and second pressure vessels; (f) metering high pressure fluid from the reservoir through the first and second pressure vessels and into the safety relief valve, by utilizing the fluid flow control means, to provide the necessary fluid pressure in the second pressure vessel to open the safety relief valve, and to provide a sufficient, variable volume of fluid through the safety relief valve to prevent the safety relief valve from simmering and damaging the safety relief valve upon closing.
Claim 2
Independent Claim 221 words
A method for testing a safety relief valve comprising the steps of: (a) disposing a first pressure vessel in fluid communication with a reservoir of high pressure fluid; (b) disposing between the first pressure vessel and the reservoir, a first means for controlling the fluid flow between the first pressure vessel and the reservoir; (c) maintaining the pressure of the high pressure fluid in the reservoir at a substantially greater pressure than the pressure in the first pressure vessel; (d) disposing the safety relief valve in unrestricted fluid communication with a second pressure vessel; the second pressure vessel being disposed between the first pressure vessel and the safety relief valve, the first pressure vessel having a larger volume than the second pressure vessel; (e) disposing between the first and second pressure vessels, a second means for controlling fluid flow between the first and second pressure vessels; (f) metering high pressure fluid from the reservoir through the first and second pressure vessels and into the safety relief valve, by utilizing the fluid flow control means, to provide the necessary fluid pressure in the second pressure vessel to open the safety relief valve, and to provide a sufficient, variable volume of fluid through the safety relief valve to prevent the safety relief valve from simmering and damaging the safety relief valve upon closing.
Claim 3
Dependent Claim 60 words
The method of claim 1, including the steps of disposing a fluid supply tank in fluid communication with the second pressure vessel; restricting the fluid communication between the first and second pressure vessels; and providing high pressure fluid to the fluid supply tank to force the fluid in the fluid supply tank to enter and open the safety relief valve.
Claim 4
Dependent Claim 25 words
The method of claim 2, wherein the fluid in the first pressure vessel is air, and the fluid in the fluid supply tank is water.
Claim 5
Dependent Claim 27 words
The method of claim 1, including the step of measuring and recording the fluid pressure required to open the safety relief valve as a function of time.
Claim 6
Dependent Claim 32 words
The method of claim 1, including the step of measuring the linear movement of a stem associated with the safety relief valve, recording the movement as a function of time and pressure.
Claim 7
Independent Claim 185 words
A system for testing a safety relief valve comprising: (a) a first pressure vessel; (b) a second pressure vessel, the first pressure vessel having a larger volume than the second pressure vessel; (c) means for releasably securing the safety relief valve in fluid communication with the second pressure vessel; (d) first means for controlling high pressure fluid flow into the first pressure vessel; (e) a first fluid passageway connecting, and disposed between, the first and second pressure vessels; (f) a second fluid passageway connecting, and disposed between the releasable securing means and second pressure vessel; and (g) second means for controlling fluid flow between the first and second pressure vessels and into the safety relief valve, the second fluid flow control means being associated with the first fluid passageway, whereby upon operation and opening of the first and second fluid control means, high pressure fluid from the first and second pressure vessels enters and opens the safety relief valve. and to provide a sufficient variable volume of fluid through the safety relief valve to prevent said safety relief valve from simmering and damages upon closing.
Claim 8
Independent Claim 185 words
A system for testing a safety relief valve comprising: (a) a first pressure vessel; (b) a second pressure vessel, the first pressure vessel having a larger volume than the second pressure vessel; (c) means for releasably securing the safety relief valve in fluid communication with the second pressure vessel; (d) first means for controlling high pressure fluid flow into the first pressure vessel; (e) a first fluid passageway connecting, and disposed between, the first and second pressure vessels; (f) a second fluid passageway connecting, and disposed between the releasable securing means and second pressure vessel; and (g) second means for controlling fluid flow between the first and second pressure vessels and into the safety relief valve, the second fluid flow control means being associated with the first fluid passageway, whereby upon operation and opening of the first and second fluid control means, high pressure fluid from the first and second pressure vessels enters and opens the safety relief valve. and to provide a sufficient variable volume of fluid through the safety relief valve to prevent said safety relief valve from simmering and damages upon closing.
Claim 9
Dependent Claim 62 words
The system of claim 6, further including a water supply tank in fluid communication with the second pressure vessel and a source of high pressure fluid, whereby upon operation and closing of the second fluid control means and passage of high pressure fluid into the water supply tank, the water from the water supply tank enters and opens the safety relief valve.
Claim 10
Dependent Claim 24 words
The system of claim 6, including means for measuring the pressure in the safety relief valve at a location proximate the second fluid passageway.
Claim 11
Dependent Claim 17 words
The system of claim 8, including means for recording the measured pressure as a function of time.
Claim 12
Dependent Claim 34 words
The system of claim 6, wherein the safety relief valve has a movable stem associated therewith; and including means for measuring the linear movement of the stem upon opening of the safety relief valve.
Claim 13
Dependent Claim 25 words
The system of claim 10, including means for recording the measured linear movement as a function of time and pressure in the safety relief valve.
Claim 14
Dependent Claim 60 words
The system of claim 7, including a third fluid passageway connecting and disposed between the water supply tank and the second pressure vessel, and a check valve disposed in the third fluid passageway to prevent high pressure fluid from the second pressure vessel from entering the water supply tank when the first and second fluid control means have been opened.

References Cited (Backward Citations)

US2353275A Cited
US4349885A Cited
US4527415A Cited
GB2139737A Cited
US4598579A Cited
US4694693A Cited
US4766765A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1993-01-15 1993-07-17 1994-01-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1997-01-15 1997-07-17 1998-01-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2001-01-15 2001-07-17 2002-01-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag