Patent US4878782A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4878782A Expired / Lapsed US ⏱️ 0.0 years remaining

Drain channel alignment and installation apparatus

Assignee: MMFG ACQUISITION CORP
•
Filing: 1987-12-11
•
Granted: 1989-11-07
•
Expires: 2007-12-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An alignment and installation strap for a presloped drainage channel run is disclosed wherein the strap includes a body and two arms perpendicular to said body, a spike attachment means on each arm and at least two thread holes with bolts on each arm, the holes being placed so that when the strap is placed over or under two adjacent drainage channel sections one of the bolts on each arm will screw into an indentation on each outside wall of one channel section and the other bolt on each arm will screw into an indentation on each outside wall of the second channel section when the two sections are correctly aligned and the two spike attachment means will accept, slide over and attach to two spikes which may be driven into the ground.

Inventors

  • 👤 Thomas B. Beattie
  • 👤 Fred M. Schweinberg
  • 👤 Ronald L. Rutzen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 14:36
CPC Classifications
E; E02; E02B; E02B5/00; E02B13/00; E03; E03F; E03F3/00; E03F3/04; E03F3/046

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 273 words
A strap for installing and aligning a drainage channel comprised of two or more drainage channel sections locatable in a trench, each drainage channel section having spaced-apart walls with inner and outer wall surfaces, a bottom with inner and outer wall surfaces, the inner wall and bottom surfaces forming a U-shaped channel with a top opening and at least one end opening, the end opening of a first section made so as to operatively engage with the end opening of a second section and each channel section having at least one alignment anchor indentation on the outside surface of each wall near the end opening, wherein said strap comprises a body with two arms attached to the body, the combination of the body and the arms essentially forming a U, the distance between the arms being slightly larger than the distance between the outside surface of the drainage channel walls, each arm having a spike attachment means for accepting, sliding over and attaching to a spike and at least two threaded channel holes with channel indentation bolts therein, the threaded channel holes being positioned on the arm so that when the strap is placed over the channel top opening or under the channel bottom at the joint between two drainage channel sections, with the arms extending over the outer surface of the channel walls, at least one threaded channel hole is positioned over the alignment anchor indentation of the first channel section and at least a second threaded channel hole is positioned over the alignment anchor indentation of the second channel section when the two channel section end openings are joined and aligned.
Claim 2
Dependent Claim 273 words
A strap for installing and aligning a drainage channel comprised of two or more drainage channel sections locatable in a trench, each drainage channel section having spaced-apart walls with inner and outer wall surfaces, a bottom with inner and outer wall surfaces, the inner wall and bottom surfaces forming a U-shaped channel with a top opening and at least one end opening, the end opening of a first section made so as to operatively engage with the end opening of a second section and each channel section having at least one alignment anchor indentation on the outside surface of each wall near the end opening, wherein said strap comprises a body with two arms attached to the body, the combination of the body and the arms essentially forming a U, the distance between the arms being slightly larger than the distance between the outside surface of the drainage channel walls, each arm having a spike attachment means for accepting, sliding over and attaching to a spike and at least two threaded channel holes with channel indentation bolts therein, the threaded channel holes being positioned on the arm so that when the strap is placed over the channel top opening or under the channel bottom at the joint between two drainage channel sections, with the arms extending over the outer surface of the channel walls, at least one threaded channel hole is positioned over the alignment anchor indentation of the first channel section and at least a second threaded channel hole is positioned over the alignment anchor indentation of the second channel section when the two channel section end openings are joined and aligned.
Claim 3
Dependent Claim 24 words
The strap of claim 1 wherein the body has concrete access hole to allow concrete to flow between the strap and the channel sections.
Claim 4
Dependent Claim 121 words
The strap of claim 1 wherein the spike attachment means comprises an open-ended spike cylinder formed from the combination of the arm and a spike clip, the combination having at least one indentation parallel to the arm and perpendicular to the body, the spike clip having at least two clip holes, one on either side of the spike clip indentation and the arm having at least two threaded spike arm holes, one on either side of the indentation placed so as to cooperate with the spike clip holes and at least two threaded clip bolts which pass through said clip holes and screw into said threaded spike arm holes to allow adjustment of the diameter of the open ended spike cylinder.
Claim 5
Dependent Claim 95 words
The strap of claim 1 wherein the spike attachment means comprises a spike cylinder formed by at least one cut in the arm and at least one spike arm concave indentation relative to the U-shape of the strap and at least one spike arm counter-indentation relative to the U-shape of the strap, the combination of the indentations running the length of the arm, perpendicular to the body and at least one threaded hole in at least one counter-indentation with a threaded spike lock bolt in the threaded hole to secure the strap to the spike.
Claim 6
Dependent Claim 123 words
The strap of claim 1 wherein the body includes first tab adjacent one arm of the strap and a second tab adjacent the second arm of the strap, both tabs projecting perpendicular to the body in the same direction as the arms, the placement of the tabs and the length of the tabs being such that when the strap is placed over the top opening and the channel indentation bolts screwed into the alignment anchor indentations, the edge of one tab nearest its respective arm is essentially touching the inner surface of first wall of the channel section and the edge of the second tab nearest its respective arm i essentially touching the inner surface of the second wall of the channel section.
Claim 7
Dependent Claim 303 words
In drainage channel section used to form a drainage channel run having a predetermined slope where the run is comprised of two or more drainage channel sections in a trench and the drainage channel section is comprised of two spaced-apart walls with inner and outer wall surfaces, a bottom with inner and outer wall surfaces, the inner wall and bottom surfaces forming a U-shaped channel with a top opening and at least one end opening, the end opening of a first section made so as to operatively engage with the end opening of a second section the improvement which comprises drainage channel sections having at least one alignment anchor indentation on the outside surface of each wall near the end opening, placed so as to cooperate with an alignment anchor strap which comprises a body with two arms attached to the body the combination of the body and the arms essentially forming a U, the distance between the arms being slightly larger than the distance between the outside surface of the drainage channel walls, each arm having a spike attachment means for accepting, sliding over and attaching to a spike and at least two threaded channel holes with at least two channel indentation bolts therein, the threaded channel holes being positioned on the ar so that when the strap is placed over the channel top opening or under the channel bottom at the joint between two drainage channel sections with the arms extending over the outer surface of the channel walls, at least one threaded channel hole is positioned over at least one of the alignment anchor indentations of the first channel section and at least a second threaded channel hole is positioned over the alignment anchor indentation of the second channel section when two channel sections end openings are joined and aligned.
Claim 8
Dependent Claim 303 words
In drainage channel section used to form a drainage channel run having a predetermined slope where the run is comprised of two or more drainage channel sections in a trench and the drainage channel section is comprised of two spaced-apart walls with inner and outer wall surfaces, a bottom with inner and outer wall surfaces, the inner wall and bottom surfaces forming a U-shaped channel with a top opening and at least one end opening, the end opening of a first section made so as to operatively engage with the end opening of a second section the improvement which comprises drainage channel sections having at least one alignment anchor indentation on the outside surface of each wall near the end opening, placed so as to cooperate with an alignment anchor strap which comprises a body with two arms attached to the body the combination of the body and the arms essentially forming a U, the distance between the arms being slightly larger than the distance between the outside surface of the drainage channel walls, each arm having a spike attachment means for accepting, sliding over and attaching to a spike and at least two threaded channel holes with at least two channel indentation bolts therein, the threaded channel holes being positioned on the ar so that when the strap is placed over the channel top opening or under the channel bottom at the joint between two drainage channel sections with the arms extending over the outer surface of the channel walls, at least one threaded channel hole is positioned over at least one of the alignment anchor indentations of the first channel section and at least a second threaded channel hole is positioned over the alignment anchor indentation of the second channel section when two channel sections end openings are joined and aligned.
Claim 9
Dependent Claim 16 words
The drainage channel sections of claim 6 wherein the alignment anchor indentations have inwardly sloping walls.
Claim 10
Dependent Claim 19 words
The drainage channel sections of claims 6 and further including a plastic insert carried by the alignment anchor indentations.
Claim 11
Dependent Claim 69 words
A combination of the strap of claim 1, the drainage channel section of claim 6 and two spikes for cooperating with the spike attachment means of the strap, wherein the strap is connected to the drainage channel sections by screwing the channel indentation bolts into the alignment anchor indentations on each channel wall and the spikes are inserted into the spike attachment means of each arm of the straps.
Claim 12
Dependent Claim 12 words
The combination of claim 9 where the spike further comprises a rebar.

References Cited (Backward Citations)

US1183906A Cited
US3299641A Cited
US4090686A Cited
US4149710A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1992-11-06 1993-05-08 1993-11-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1996-11-06 1997-05-08 1997-11-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2000-11-06 2001-05-08 2001-11-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag