Abstract

Abstract The present invention is directed to a weldless pavement module and a method for making a weldless pavement module. Each of the primary load bearing bars is formed with openings for receiving slotted secondary load bearing bars which are passed through the primary load bearing bars in a substantially horizontal position and which are rotated into a vertical position. The size and shape of the openings and the slots permit the combination of primary load bearing bars and secondary load bearing bars to be skewed to form a nonrectangular parallelogram configuration. Simple tack welds are used to temporarily hold the grating in its desired configuration. A concrete component encases at least the top surface of the grating base member and permanently secures the elements of the grating base member together. The use of tack welds eliminates the requirement that the grating base member be bent into a convex shape prior to welding. A simple flat jig is used.

Inventors

  • 👤 Neal H. Bettigole

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 10:58
CPC Classifications
E; E04; E04B; E04B5/00; E04B5/16; E04B5/17; E04B5/23; E04B5/29; E01; E01D; E01D19/00; E01D19/12; E01D19/125; E01D2101/00; E01D2101/20; E01D2101/24; E01D2101/26; E01D2101/268

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 168 words
A method of making a pavement module having an open lattice grating base member, said grating base member comprising a plurality of parallel primary load bearing bars intersecting and interlocking with a plurality of parallel secondary load bearing bars, each said primary load bearing bar having a plurality of assembly apertures corresponding in number to said secondary load bearing bars and each said secondary load bearing bar having a plurality of assembly slots corresponding in number to said primary load bearing bars, the method comprising the steps of: (a) placing said plurality of parallel primary load bearing bars at spaced intervals; (b) inserting said secondary load bearing bars in a substantially horizontal position through said assembly apertures until each said assembly slot lines up with a corresponding said assembly apertures; (c) rotating said secondary load bearing bars 90° to a vertical position; (d) tack welding said secondary load bearing bars to said primary load bearing bars; and (e) fixing a reinforced concrete component to said grating base member.
Claim 2
Independent Claim 168 words
A method of making a pavement module having an open lattice grating base member, said grating base member comprising a plurality of parallel primary load bearing bars intersecting and interlocking with a plurality of parallel secondary load bearing bars, each said primary load bearing bar having a plurality of assembly apertures corresponding in number to said secondary load bearing bars and each said secondary load bearing bar having a plurality of assembly slots corresponding in number to said primary load bearing bars, the method comprising the steps of: (a) placing said plurality of parallel primary load bearing bars at spaced intervals; (b) inserting said secondary load bearing bars in a substantially horizontal position through said assembly apertures until each said assembly slot lines up with a corresponding said assembly apertures; (c) rotating said secondary load bearing bars 90° to a vertical position; (d) tack welding said secondary load bearing bars to said primary load bearing bars; and (e) fixing a reinforced concrete component to said grating base member.
Claim 3
Dependent Claim 69 words
A method as set forth in claim 1 wherein each said assembly aperture has a cutout portion for receiving one end of said secondary load bearing bar and for facilitating rotation of said secondary load bearing bar into the vertical position, and wherein said assembly aperture has a horizontal wall surface opposite said cutout portion for facilitating the fit of said secondary load bearing bar within said assembly aperture.
Claim 4
Dependent Claim 37 words
A method as set forth in claim 2 further comprising the step of installing a plurality of tertiary load bearing bars between and parallel to said primary load bearing bars on the top surface of said grating.
Claim 5
Dependent Claim 39 words
A method as set forth in claim 3 further comprising the step of installing a plurality of shear connectors on said top surface of said grating base member so that said shear connectors are encased in said concrete component.
Claim 6
Dependent Claim 58 words
A method as set forth in claim 4 further comprising the step of curing said concrete component to thereby provide a composite interaction between said concrete component and said grating base member so that said shear connectors within said concrete component effect horizontal shear transfer and prevent vertical separation between said concrete component and said grating base member.
Claim 7
Dependent Claim 34 words
A method as set forth in claim 1 further comprising the step of placing reinforcing material on said top surface of said grating base member and encasing said reinforcing material in said concrete component.
Claim 8
Dependent Claim 30 words
A method as set forth in claim 1 further comprising the step of skewing said primary load bearing bars and said secondary load bearing bars to form a nonrectangular parallelogram.
Claim 9
Dependent Claim 18 words
A method as set forth in claim 1 wherein said skewing step is performed before said rotating step.
Claim 10
Dependent Claim 42 words
A method as set forth in claim 1 further comprising the step of disposing said primary and secondary load bearing bars in a jig which aligns said primary and secondary load bearing bars in a flat configuration before said tack welding step.
Claim 11
Independent Claim 45 words
A method as set forth in claims 3, 4, or 5 further comprising the step of disposing said primary and secondary load bearing bars in a jig which aligns said primary and secondary load bearing bars in a flat configuration before said tack welding step.
Claim 12
Independent Claim 387 words
A method of making a pavement module having an open lattice grating base member, said grating base member comprising a plurality of parallel primary load bearing bars intersecting and interlocking with a plurality of parallel secondary load bearing bars, each said primary load bearing bar having a plurality of assembly apertures corresponding in number to said secondary load bearing bars and each said secondary load bearing bar having a plurality of assembly slots corresponding in number to said primary load bearing bars, wherein each said assembly aperture has a cutout portion for receiving one end of said secondary load bearing bar and for facilitating rotation of said secondary load bearing bar into the vertical position, and wherein said assembly aperture has a horizontal wall surface opposite said cutout portion for facilitating the fit of said secondary load bearing bar within said assembly aperture, the method comprising the steps of: (a) placing said plurality of parallel primary load bearing bars at spaced intervals; (b) inserting said secondary load bearing bars in a substantially horizontal position through said assembly apertures until each said assembly slot lines up with a corresponding assembly aperture, said primary and secondary load bearing bars being aligned in a flat configuration; (c) rotating said secondary load bearing bars 90° to a vertical position; (d) installing a plurality of tertiary load bearing bars between and parallel to said primary load bearing bars on said top surface of said grating; (e) tack welding said secondary load bearing bars to said primary load bearing bars and tack welding said tertiary load bearing bars to said secondary load bearing bars; (f) installing a plurality of shear connectors on said top surface of said grating base member; (g) placing reinforcing material on said top surface of said grating base member; (h) providing a concrete component fixed to the top surface of said grating base member encasing said shear connectors and said reinforcing material, wherein the bottom surface of said concrete component is substantially coplanar with the top surface of said grating base member; and (i) curing said concrete component to thereby provide a composite interaction between said concrete component and said grating base member so that said shear connectors within said concrete component effect horizontal shear transfer and prevent vertical separation between said concrete component and said grating base member.
Claim 13
Independent Claim 387 words
A method of making a pavement module having an open lattice grating base member, said grating base member comprising a plurality of parallel primary load bearing bars intersecting and interlocking with a plurality of parallel secondary load bearing bars, each said primary load bearing bar having a plurality of assembly apertures corresponding in number to said secondary load bearing bars and each said secondary load bearing bar having a plurality of assembly slots corresponding in number to said primary load bearing bars, wherein each said assembly aperture has a cutout portion for receiving one end of said secondary load bearing bar and for facilitating rotation of said secondary load bearing bar into the vertical position, and wherein said assembly aperture has a horizontal wall surface opposite said cutout portion for facilitating the fit of said secondary load bearing bar within said assembly aperture, the method comprising the steps of: (a) placing said plurality of parallel primary load bearing bars at spaced intervals; (b) inserting said secondary load bearing bars in a substantially horizontal position through said assembly apertures until each said assembly slot lines up with a corresponding assembly aperture, said primary and secondary load bearing bars being aligned in a flat configuration; (c) rotating said secondary load bearing bars 90° to a vertical position; (d) installing a plurality of tertiary load bearing bars between and parallel to said primary load bearing bars on said top surface of said grating; (e) tack welding said secondary load bearing bars to said primary load bearing bars and tack welding said tertiary load bearing bars to said secondary load bearing bars; (f) installing a plurality of shear connectors on said top surface of said grating base member; (g) placing reinforcing material on said top surface of said grating base member; (h) providing a concrete component fixed to the top surface of said grating base member encasing said shear connectors and said reinforcing material, wherein the bottom surface of said concrete component is substantially coplanar with the top surface of said grating base member; and (i) curing said concrete component to thereby provide a composite interaction between said concrete component and said grating base member so that said shear connectors within said concrete component effect horizontal shear transfer and prevent vertical separation between said concrete component and said grating base member.
Claim 14
Dependent Claim 30 words
A method as set forth in claim 11 further comprising the step of skewing said primary load bearing bars and said secondary load bearing bars to form a nonrectangular parallelogram.
Claim 15
Dependent Claim 57 words
A method as set forth in claim 1 wherein said step of fixing said concrete component to said grating base member further comprises fixing said concrete component to said top surface of said grating base member so that the bottom surface of said concrete component is substantially coplanar with the top surface of said grating base member.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1992-09-11 1993-03-13 1993-09-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1996-09-11 1997-03-13 1997-09-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2000-09-11 2001-03-13 2001-09-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag