Underground leachate and pollutant drainage barrier system
Abstract
Abstract A leachate and pollutant drainage barrier system is formed by excavating a narrow slit or slot in the earth in the presence of a reversable slurry mud which changes from a highly viscous character after a predetermined period of time (approximately 5-7 days) needed to maintain the trench open to permit the laying of a drainage pipe at the bottom of the trench and the filling of the trench with a pervious fill, such as gravel, etc. After the fill has been installed, lateral support for the earth walls is provided by the pervious fill material and the slurry reverts to a liquid having a substantially lower viscosity which may be drained via the drain pipe in the bottom of the trench. In a preferred embodiment the slurry is a biodegradable polymer. In addition, a plastic film or layer can be installed in the trench.
Inventors
- 👤 Nicholas J. Cavalli
Bibliographic Details
Claims Analysis
Total Claims: 9References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1992-09-04 | 1993-03-06 | 1993-09-05 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1996-09-04 | 1997-03-06 | 1997-09-05 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2000-09-04 | 2001-03-06 | 2001-09-05 | $7700.00 | Window Closed / Lapsed |