← Back to Patent Explorer
US3603097A Expired / Lapsed US ⏱️ 0.0 years remaining

Process of making underground structures for underdraining and shielding purposes

Assignee: PRZED SPECJALISTYCZNE GORNICTW
•
Filing: 1969-01-15
•
Granted: 1971-09-07
•
Expires: 1989-01-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A trench dam is made by an apparatus which digs a trench in a water-permeable ground layer, then lays a perforated drainage conduit in this trench, partially fills the trench over the conduit with gravel to form a porous gravel bed, and then fills the trench over the bed with a mixture of the excavated earth and a binder to form a waterproof wall. This operation is carried out under a silt-water suspension to prevent collapse of the trench walls which are undercut by milling wheels on the lower end of the cutter. Clear water is pumped into the conduit during these operations to drive off this silt-water suspension.

Inventors

  • 👤 Bohdan Zakiewicz

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 03:49
CPC Classifications
E; E02; E02F; E02F5/00; E02F5/02; E02F5/06; E02D; E02D17/00; E02D17/06; E02D17/13; E02D19/00; E02D19/06; E02D19/12; E02D19/16; E02D19/18; E02D5/00; E02D5/18; E02D5/187; E02F3/00; E02F3/04; E02F3/08; E02F3/10; E02F5/12

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 80 words
A method of making a trench dam comprising the steps of: forming a trench in a water-permeable ground layer below a siltwater suspension; laying a perforated drainage conduit directly on the base of said trench; partially filling said trench with gravel to form a porous gravel bed therein above said conduit; forming a waterproof wall in said trench above said bed; and forcing substantially clear water through said conduit during and after laying thereof to drive off said silt-water suspension.
Claim 2
Independent Claim 80 words
A method of making a trench dam comprising the steps of: forming a trench in a water-permeable ground layer below a siltwater suspension; laying a perforated drainage conduit directly on the base of said trench; partially filling said trench with gravel to form a porous gravel bed therein above said conduit; forming a waterproof wall in said trench above said bed; and forcing substantially clear water through said conduit during and after laying thereof to drive off said silt-water suspension.
Claim 3
Independent Claim 81 words
A method of making a trench dam comprising the steps of: forming a trench in a water-permeable ground layer; laying a perforated drainage conduit directly on the base of said trench; partially filling said trench with gravel to form a porous gravel bed therein above said conduit; forming a waterproof wall in said trench above said bed; and mixing the earth removed to form said trench with a binder, said wall being formed with the mixture of earth and said binder.
Claim 4
Independent Claim 81 words
A method of making a trench dam comprising the steps of: forming a trench in a water-permeable ground layer; laying a perforated drainage conduit directly on the base of said trench; partially filling said trench with gravel to form a porous gravel bed therein above said conduit; forming a waterproof wall in said trench above said bed; and mixing the earth removed to form said trench with a binder, said wall being formed with the mixture of earth and said binder.
Claim 5
Independent Claim 88 words
A method of making a trench dam comprising the steps of: forming a trench in a water-permeable ground layer; laying a perforated drainage conduit directly on the base of said trench; partially filling said trench with gravel to form a porous gravel bed therein above said conduit; forming a waterproof wall in said trench above said bed; and, all of said steps are carried out substantially simultaneously and jointly, said method further comprising the step of pumping water From said conduit upon the formation of said waterproof wall.
Claim 6
Independent Claim 88 words
A method of making a trench dam comprising the steps of: forming a trench in a water-permeable ground layer; laying a perforated drainage conduit directly on the base of said trench; partially filling said trench with gravel to form a porous gravel bed therein above said conduit; forming a waterproof wall in said trench above said bed; and, all of said steps are carried out substantially simultaneously and jointly, said method further comprising the step of pumping water From said conduit upon the formation of said waterproof wall.

References Cited (Backward Citations)

US1270142A Cited
US1856216A Cited
US1731838A Cited
US3201948A Cited
US3203188A Cited
US3309875A Cited
US3332249A Cited
US3385068A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1974-09-06 1975-03-08 1975-09-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1978-09-06 1979-03-08 1979-09-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1982-09-06 1983-03-08 1983-09-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag