Claim 1
Independent Claim
211 words
A concrete post assembly for use in a noise barrier wall, the post assembly being adapted to be supported in an upright position by an in-ground concrete pier, the post assembly comprising: a plurality of anchor bolts embedded in the pier with a threaded portion of each bolt extending above an upper surface of the pier; support means threaded onto the upwardly extending portion of each anchor bolt for supporting a concrete post assembly thereon; a rigid base plate fixed to a bottom of the post and having a plurality of holes located therein that are in registry with the upwardly extending anchor bolts, the base plate and post being mounted on the anchor bolts with the plate resting on said support means above the upper surface of the pier, said support means on the anchor bolts being adjusted so that the plate is level and the post extends a desired height above the upper surface of the pier; nut means threaded on each anchor bolt above the base plate to rigidly secure the plate between the nut means and the support means; and said base plate being affixed to the bottom of the concrete post by rods secured to the plate which extend upwardly and are embedded within the post.
Claim 2
Dependent Claim
211 words
A concrete post assembly for use in a noise barrier wall, the post assembly being adapted to be supported in an upright position by an in-ground concrete pier, the post assembly comprising: a plurality of anchor bolts embedded in the pier with a threaded portion of each bolt extending above an upper surface of the pier; support means threaded onto the upwardly extending portion of each anchor bolt for supporting a concrete post assembly thereon; a rigid base plate fixed to a bottom of the post and having a plurality of holes located therein that are in registry with the upwardly extending anchor bolts, the base plate and post being mounted on the anchor bolts with the plate resting on said support means above the upper surface of the pier, said support means on the anchor bolts being adjusted so that the plate is level and the post extends a desired height above the upper surface of the pier; nut means threaded on each anchor bolt above the base plate to rigidly secure the plate between the nut means and the support means; and said base plate being affixed to the bottom of the concrete post by rods secured to the plate which extend upwardly and are embedded within the post.
Claim 3
Dependent Claim
44 words
The post assembly of claim 1 further including a non-shrinkable topping added to the upper surface of said pier after the base plate and post have been secured in position on the anchor bolts for providing a pedestal upon which the base plate rests.
Claim 4
Dependent Claim
196 words
A concrete post assembly for use in a noise barrier wall that includes: an in-ground concrete pier having a top surface terminating a short distance below ground level; a plurality of anchor bolts embedded in the pier with a threaded portion of each bolt extending above the top surface of said pier; support means threaded onto the upwardly extending portion of each anchor bolt for supporting a concrete post thereon; a rigid base plate affixed to a bottom of the post having a plurality of holes located therein that are in registry with the upwardly extended anchor bolts, said base plate and said post being mounted on the anchor bolts with the plate resting on said support means above the upper surface of said pier, said support means being adjusted on said anchor bolts so that the plate is level and the post extends a desired distance above the upper surface of said pier; locking means mounted on each anchor bolt above the base plate for rigidly securing the plate against said support means; and a non-shrinkable topping added to the top surface of said pier to provide a pedestal upon which said base plate rests.
Claim 5
Dependent Claim
196 words
A concrete post assembly for use in a noise barrier wall that includes: an in-ground concrete pier having a top surface terminating a short distance below ground level; a plurality of anchor bolts embedded in the pier with a threaded portion of each bolt extending above the top surface of said pier; support means threaded onto the upwardly extending portion of each anchor bolt for supporting a concrete post thereon; a rigid base plate affixed to a bottom of the post having a plurality of holes located therein that are in registry with the upwardly extended anchor bolts, said base plate and said post being mounted on the anchor bolts with the plate resting on said support means above the upper surface of said pier, said support means being adjusted on said anchor bolts so that the plate is level and the post extends a desired distance above the upper surface of said pier; locking means mounted on each anchor bolt above the base plate for rigidly securing the plate against said support means; and a non-shrinkable topping added to the top surface of said pier to provide a pedestal upon which said base plate rests.
Claim 6
Dependent Claim
22 words
The post assembly of claim 3 wherein said support means is adjusted so that the plate is at or above ground level.
Claim 7
Dependent Claim
37 words
The post assembly of claim 4 wherein the concrete post contains vertically disposed grooves in opposing side walls thereof and further including panel means slidably received within said grooves, said panel means resting upon said base plate.
Claim 8
Independent Claim
203 words
A method of securing a concrete post assembly used in a noise barrier wall in a desired position, the post assembly including a rigid base plate affixed to a bottom of a concrete post, said post further including vertical grooves formed in the opposing side walls thereof, the method comprising the steps of: casting in place within an in-ground bore a concrete pier having a top surface which terminates at or below ground level, said pier having a plurality of threaded anchor bolts partially embedded therein with a threaded portion of each bolt extending above the top surface of said pier; threading a support means on each anchor bolt; mounting the base plate of a post assembly on the anchor bolt so that the base plate rests upon the support means with the post extending upwardly above the top surface of said pier; adjusting the position of the support means on the anchor bolts so that the base plate is at or above ground level; locking the base plate securely against the support means to hold the post in an upright position; and adding a non-shrinkable topping to the top surface of the pier so that the base plate rests upon said topping.
Claim 9
Independent Claim
203 words
A method of securing a concrete post assembly used in a noise barrier wall in a desired position, the post assembly including a rigid base plate affixed to a bottom of a concrete post, said post further including vertical grooves formed in the opposing side walls thereof, the method comprising the steps of: casting in place within an in-ground bore a concrete pier having a top surface which terminates at or below ground level, said pier having a plurality of threaded anchor bolts partially embedded therein with a threaded portion of each bolt extending above the top surface of said pier; threading a support means on each anchor bolt; mounting the base plate of a post assembly on the anchor bolt so that the base plate rests upon the support means with the post extending upwardly above the top surface of said pier; adjusting the position of the support means on the anchor bolts so that the base plate is at or above ground level; locking the base plate securely against the support means to hold the post in an upright position; and adding a non-shrinkable topping to the top surface of the pier so that the base plate rests upon said topping.
Claim 10
Dependent Claim
34 words
The method of claim 4 that further includes the step of inserting side panels into the opposed grooves formed in the post so that each panel rests upon the top of the base plate.