← Back to Patent Explorer
US4846275A Expired / Lapsed US ⏱️ 0.0 years remaining

Recovery of heavy crude oil or tar sand oil or bitumen from underground formations

Assignee: Alberta Oil Sands Technology and Research Authority
•
Filing: 1988-02-05
•
Granted: 1989-07-11
•
Expires: 2008-02-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Heavy crude oil or tar sand oil or bitumen is recovered from an underground formation containing the same by introducing into said formation via an injection well or conduit a hot alkaline aqueous fluid so as to bring about the movement or migration or stripping of said heavy crude oil or tar sand oil or bitumen from said formation into said hot alkaline aqueous fluid at the interface between said hot alkaline aqueous fluid and said heavy crude oil or tar sand oil or bitumen-containing formation as said hot alkaline aqueous fluid moves along within said formation from said injection well or conduit to a production well or conduit for the recovery of the resulting produced heavy crude oil or tar sand oil or bitumen from said formation as an emulsion via said production well or conduit.

Inventors

  • 👤 Alex S. McKay

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 03:16
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/58; C09K8/592; E; E21; E21B; E21B43/00; E21B43/16; E21B43/164; E21B43/24

Claims Analysis

Total Claims: 48
Claim 1
Independent Claim 229 words
A method of producing heavy crude oil or tar sand oil or bitumen from an underground formation containing the same, which comprises utilizing or establishing a aqueous fluid communication path within and through said formation between an injection well or conduit and a production well or conduit by introducing into said formation from said injection well or conduit hot water and/or low quality steam at a temperature in the range about 60°-130° C. and at a substantially neutral or alkaline pH to establish or enlarge said aqueous fluid communication path within said formation from said injection well or conduit to said production well or conduit by movement of said introduced hot water or low quality steam through said formation, increasing the temperature of said injected hot water or low quality steam to a temperature in the range about 110°-180° C. while increasing the pH of the injected hot water or low quality steam to a pH of about 10-13 so as to bring about the movement or migration or stripping of said heavy crude oil or tar sand oil or bitumen from said formation substantially into said hot aqueous fluid communication path within said formation and recovering the resulting produced heavy crude oil or tar sand oil or bitumen from said formation as an emulsion containing less than about 30% oil or bitumen from said production well or conduit.
Claim 2
Independent Claim 229 words
A method of producing heavy crude oil or tar sand oil or bitumen from an underground formation containing the same, which comprises utilizing or establishing a aqueous fluid communication path within and through said formation between an injection well or conduit and a production well or conduit by introducing into said formation from said injection well or conduit hot water and/or low quality steam at a temperature in the range about 60°-130° C. and at a substantially neutral or alkaline pH to establish or enlarge said aqueous fluid communication path within said formation from said injection well or conduit to said production well or conduit by movement of said introduced hot water or low quality steam through said formation, increasing the temperature of said injected hot water or low quality steam to a temperature in the range about 110°-180° C. while increasing the pH of the injected hot water or low quality steam to a pH of about 10-13 so as to bring about the movement or migration or stripping of said heavy crude oil or tar sand oil or bitumen from said formation substantially into said hot aqueous fluid communication path within said formation and recovering the resulting produced heavy crude oil or tar sand oil or bitumen from said formation as an emulsion containing less than about 30% oil or bitumen from said production well or conduit.
Claim 3
Dependent Claim 31 words
A method in accordance with claim 1 wherein said injection well or conduit and said production well or conduit are separated horizontally from each other and substantially vertically penetrate said formation.
Claim 4
Dependent Claim 53 words
A method in accordance with claim 1 wherein said injection well or conduit and said production well or conduit are substantially horizontally and concentrically disposed within said formation with an inlet for said injection well or conduit and an outlet for said production well or conduit disposed on the surface above said formation.
Claim 5
Dependent Claim 40 words
A method in accordance with claim 1 wherein sodium hydroxide is dissolved in said injected hot water or low quality steam at a temperature in the range 60°-130° C. or at said increased temperature in the range about 110°-180° C.
Claim 6
Dependent Claim 41 words
A method in accordance with claim 1 wherein carbon dioxide is introduced into said injected hot water or low quality steam at a temperature in the range about 60°-130° C. or at said increased temperature in the range about 110°-180° C.
Claim 7
Dependent Claim 40 words
A method in accordance with claim 1 wherein a surfactant is present in said injected hot water or low quality steam at a temperature in the range 60°-130° C. or at said increased temperature in the range about 110°-180° C.
Claim 8
Dependent Claim 26 words
A method in accordance with claim 1 wherein said resulting produced heavy crude oil or tar sand oil or bitumen is recovered as an oil-in-water emulsion.
Claim 9
Dependent Claim 43 words
A method in accordance with claim 1 wherein said resulting produced heavy crude oil or tar sand oil or bitumen is recovered as an emulsion containing up to about 30% by volume or weight heavy crude oil or tar sand oil or bitumen.
Claim 10
Dependent Claim 46 words
A method in accordance with claim 1 wherein said resulting produced heavy crude oil or tar sand oil or bitumen is recovered as an oil-in-water emulsion having an oil cut or oil content in the range 10 to up to about 30% by weight or volume.
Claim 11
Dependent Claim 26 words
A method in accordance with claim 1 wherein said resulting produced heavy crude oil or tar sand oil or bitumen is recovered as a water-in-oil emulsion.
Claim 12
Dependent Claim 30 words
A method in accordance with claim 1 wherein said resulting produced heavy crude oil or tar sand oil or bitumen is recovered as a mixture of oil-in-water and water-in-oil emulsions.
Claim 13
Dependent Claim 86 words
A method in accordance with claim 1 wherein the pressure differential between the pressure of the hot water or low quality steam introduced into said formation via said injection well or conduit and the pressure at said production well of the resulting produced heavy crude oil or tar sand oil or bitumen produced from said formation is maintained constant while injecting aqueous fluid and recovering the resulting produced heavy crude oil or tar sand oil or bitumen from said formation via said production well or conduit.
Claim 14
Dependent Claim 29 words
A method in accordance with claim 12 wherein said pressure differential is maintained constant by increasing the amount of hot water or low quality steam introduced into said formation.
Claim 15
Dependent Claim 50 words
A method in accordance with claim 1 wherein a petroleum sulfonate surfactant is introduced into said formation via said injection well along with said hot water or low quality steam at a temperature in the range about 60°-130° C. or at said increased temperature in the range about 110°-180° C.
Claim 16
Dependent Claim 38 words
A method in accordance with claim 1 wherein a petroleum sulfonate surfactant is introduced into said formation along with the injected hot water or low quality steam at a concentration therein in the range 1-10,000 ppm by weight.
Claim 17
Dependent Claim 64 words
A method in accordance with claim 1 wherein a minor amount of water recovered with the heavy crude oil or tar sand oil or bitumen is reintroduced into said formation via said injection well together with said injected hot water or low quality steam at a temperature in the range about 60°-130° C. or at said increased temperature in the range about 110°-180° C.
Claim 18
Dependent Claim 45 words
A method in accordance with claim 1 wherein a minor amount of the recovered heavy crude oil or tar sand oil or bitumen in emulsion form is reintroduced into said formation via said injection well together with said injected hot water or low quality steam.
Claim 19
Dependent Claim 34 words
A method in accordance with claim 17 wherein said minor amount is in the range 2-20% by volume of the hot water or low quality steam introduced into said formation via said injection well.
Claim 20
Dependent Claim 32 words
A method in accordance with claim 16 wherein said minor amount of water is in the range 2-20% by volume of the hot water or low quality stream introduced into said formation.
Claim 21
Dependent Claim 57 words
A method in accordance with claim 1 wherein a surfactant is introduced into said formation along with said hot water or low quality steam at a temperature in the range 60°-130° C. or in the range about 110°-180° C. to enhance the formation and production of said emulsion from said formation via said production well or conduit.
Claim 22
Dependent Claim 45 words
A method in accordance with claim 20 wherein said surfactant is introduced into said formation along with said hot water or low quality steam in an amount 1-1000 ppm of said hot water or low quality steam introduced into said formation via said injection well.
Claim 23
Dependent Claim 42 words
A method in accordance with claim 1 wherein the produced heavy crude oil or tar sand oil or bitumen from said formation recovered via said production well or conduit comprises in the range about 30% by volume or weight of said emulsion.
Claim 24
Dependent Claim 39 words
A method in accordance with claim 1 wherein the produced heavy crude oil or tar sand oil or bitumen from said formation recovered via said production well or conduit comprises about 10-25% by volume or weight of said emulsion.
Claim 25
Dependent Claim 96 words
A method in accordance with claim 1 wherein the pressure differential between the pressure of the hot water or low quality steam introduced into said formation at a temperature in the range 110°-180° C. via said injection well or conduit and the pressure of the resulting produced heavy crude oil or tar sand oil or bitumen produced from said formation at said production well or conduit is maintained constant while recovering an increased amount of the resulting produced heavy crude oil or tar sand oil or bitumen from said formation via said production well or conduit.
Claim 26
Dependent Claim 86 words
A method in accordance with claim 1 wherein the pressure differential between the pressure of the hot water or low quality steam introduced into said formation via said injection well or conduit and the pressure of the resulting produced heavy crude oil or tar sand oil or bitumen produced is varied or adjusted while recovering a predetermined or fixed amount of the emulsion containing less than about 30% heavy crude oil or tar sand oil or bitumen from said formation via said production well or conduit.
Claim 27
Dependent Claim 61 words
A method in accordance with claim 1 wherein the pH of the injected hot water or low quality steam is increased by dissolving in said injected hot water or low quality steam an alkaline acting compound in an amount sufficient to increase the pH of said injected hot water or low quality steam to a value in the range about 9-13.
Claim 28
Dependent Claim 32 words
A method in accordance with claim 26 wherein said alkaline compound is selected from the group consisting of ammonia, ammonium hydroxide, ammonium carbonate, sodium hydroxide, sodium carbonate, trisodium phosphate and disodium phosphate.
Claim 29
Dependent Claim 17 words
A method in accordance with claim 1 wherein said formation is a Canadian tar sand oil formation.
Claim 30
Independent Claim 228 words
A method of producing heavy crude oil or tar sand oil or bitumen from an underground formation containing the same which comprises utilizing or establishing a fluid communication path through said formation between an injection well or conduit and a production well or conduit in fluid communication within said formation by introducing into said formation via said injection well or conduit an aqueous fluid to establish an aqueous fluid communication path through said formation from said injection well or conduit to said production well or conduit by movement of said introduced aqueous fluid through said formation from said injection well or conduit to said production well or conduit, increasing the temperature of said injected aqueous fluid while increasing the pH of the injected aqueous fluid to a pH in the alkaline range above about 9 to bring about the movement or migration or stripping of said heavy crude oil or tar sand oil or bitumen substantially along the interface between said fluid communication path and said heavy crude oil or tar sand oil or bitumen-containing formation from said formation into said injected aqueous fluid moving within said formation along said aqueous fluid communication path and recovering the resulting produced heavy crude oil or tar sand oil or bitumen from said formation as an emulsion containing less than about 30% oil or bitumen via said production well or conduit.
Claim 31
Independent Claim 228 words
A method of producing heavy crude oil or tar sand oil or bitumen from an underground formation containing the same which comprises utilizing or establishing a fluid communication path through said formation between an injection well or conduit and a production well or conduit in fluid communication within said formation by introducing into said formation via said injection well or conduit an aqueous fluid to establish an aqueous fluid communication path through said formation from said injection well or conduit to said production well or conduit by movement of said introduced aqueous fluid through said formation from said injection well or conduit to said production well or conduit, increasing the temperature of said injected aqueous fluid while increasing the pH of the injected aqueous fluid to a pH in the alkaline range above about 9 to bring about the movement or migration or stripping of said heavy crude oil or tar sand oil or bitumen substantially along the interface between said fluid communication path and said heavy crude oil or tar sand oil or bitumen-containing formation from said formation into said injected aqueous fluid moving within said formation along said aqueous fluid communication path and recovering the resulting produced heavy crude oil or tar sand oil or bitumen from said formation as an emulsion containing less than about 30% oil or bitumen via said production well or conduit.
Claim 32
Dependent Claim 21 words
A method in accordance with claim 29 wherein carbon dioxide is introduced into said formation together with said aqueous fluid stream.
Claim 33
Dependent Claim 39 words
A method in accordance with claim 29 wherein the amount of aqueous fluid introduced into said formation is increased so as to maintain a given or fixed or predetermined pressure differential between said injection well and said production well.
Claim 34
Dependent Claim 38 words
A method in accordance with claim 29 wherein the amount of aqueous fluid introduced into said formation is increased so as to increase the production of heavy crude oil or tar sand oil or bitumen from said formation.
Claim 35
Dependent Claim 59 words
A method in accordance with claim 31 wherein the amount of aqueous fluid introduced into said formation is adjusted so as to produce an emulsion containing said heavy crude oil or tar sand oil or bitumen wherein the amount of said heavy crude oil or tar sand oil or bitumen in said emulsion is 10-25% by weight or volume.
Claim 36
Dependent Claim 20 words
A method in accordance with claim 29 wherein a surfactant is introduced into said formation along with said aqueous fluid.
Claim 37
Dependent Claim 14 words
A method in accordance with claim 34 wherein said surfactant is a petroleum sulfonate.
Claim 38
Dependent Claim 35 words
A method in accordance with claim 35 wherein the amount of petroleum sulfonate introduced into said formation along with said aqueous fluid comprises a minor amount therein in the range 0.0001-0.5% by weight or volume.
Claim 39
Dependent Claim 60 words
A method in accordance with claim 29 wherein a minor amount of the resulting produced heavy crude oil or tar sand oil or bitumen recovered from said formation as an emulsion via said production well or conduit is recycled or returned as an oil-in-water emulsion to said formation via said aqueous fluid introduced into said formation via said injection well.
Claim 40
Dependent Claim 34 words
A method in accordance with claim 29 wherein a minor amount of the aqueous fluid produced with said heavy crude oil or tar sand oil or bitumen is returned or recycled to said formation.
Claim 41
Dependent Claim 28 words
A method in accordance with claim 29 wherein the temperature of said aqueous fluid introduced into said formation is increased to a temperature in the range 60°-180° C.
Claim 42
Dependent Claim 24 words
A method in accordance with claim 29 wherein said aqueous fluid is introduced into said formation at a temperature in the range 110°-180° C.
Claim 43
Dependent Claim 35 words
A method in accordance with claim 29 wherein said aqueous fluid contains sodium hydroxide dissolved therein an an amount to increase the pH of the injected aqueous fluid to a value in the range 9-13.
Claim 44
Dependent Claim 25 words
A method in accordance with claim 29 wherein sodium hydroxide and carbon dioxide are introduced into said formation along with said increased temperature aqueous fluid.
Claim 45
Dependent Claim 33 words
A method in accordance with claim 29 wherein the heavy crude oil or tar sand oil or bitumen is recovered from the emulsion produced from said formation via said production well or conduit.
Claim 46
Dependent Claim 56 words
A method in accordance with claim 29 wherein carbon dioxide is introduced into said formation together with said aqueous fluid stream to bring about and/or maintain the amount of said heavy crude oil or tar sand oil or bitumen in said produced emulsion in the range 20 to less than about 30% by weight or volume.
Claim 47
Dependent Claim 55 words
A method in accordance with claim 29 wherein surfactant is introduced into said formation together with said aqueous fluid stream to bring about and/or maintain the amount of said heavy crude oil or tar sand oil or bitumen in said produced emulsion in the range 20 to less than about 30% by weight or volume.
Claim 48
Dependent Claim 62 words
A method in accordance with claim 29 wherein sodium hydroxide and carbon dioxide are introduced into said formation along with said increased temperature aqueous fluid and wherein the carbon dioxide is introduced to bring about and/or maintain the amount of said heavy crude oil or tar sand oil or bitumen in said produced emulsion in the range 10-30% by weight or volume.

References Cited (Backward Citations)

US3279538A Cited
US3221813A Cited
US3379250A Cited
US3396791A Cited
US3802508A Cited
US3706341A Cited
US3913671A Cited
US4265310A Cited
US4516636A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1992-07-10 1993-01-09 1993-07-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1996-07-10 1997-01-09 1997-07-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2000-07-10 2001-01-09 2001-07-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag