US4844840A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and structure for hazardous waste containment
Assignee: Bechtel Group Inc
•
Filing: 1987-08-14
•
Granted: 1989-07-04
•
Expires: 2007-08-14
Abstract
Abstract Primary waste containers are placed in prefabricated canisters and sealed with a curable fluid sealant, such as grout. The canisters are then stacked in an interlocking manner to form a stable integrated structure. The containers are not, however, permanently attached to one another, so that individual containers are able to shift relative to one another in response to earth movements. In this way, the integrity of the individual container is maintained and the sealed wastes protected even when the integrated structure as a whole experiences significant stresses from earth movement.
Inventors
- 👤 Faramarz Feizollahi
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-28 02:02
CPC Classifications
G; G21; G21F; G21F9/00; G21F9/28; G21F9/34; G21F9/36
Claims Analysis
Total Claims: 23
Claim 1
Independent Claim
112 words
A method for containment of hazardous waste materials, said method comprising: collecting a plurality of primary containers which hold the wastes; sealing one or more of the primary containers within a canister; and stacking a plurality of the canisters in an interlocking manner over a substantially impermeable bed in an excavated disposal site, whereby said canisters form an integrated structure in which the individual canisters are generally held in place by gravity but able to shift relative positions in response to earth movement without fracturing of said canisters, wherein the canisters are arranged in at least two layers with each canister in an overlying layer interlocking with canisters in the underlying layer.
Claim 2
Independent Claim
112 words
A method for containment of hazardous waste materials, said method comprising: collecting a plurality of primary containers which hold the wastes; sealing one or more of the primary containers within a canister; and stacking a plurality of the canisters in an interlocking manner over a substantially impermeable bed in an excavated disposal site, whereby said canisters form an integrated structure in which the individual canisters are generally held in place by gravity but able to shift relative positions in response to earth movement without fracturing of said canisters, wherein the canisters are arranged in at least two layers with each canister in an overlying layer interlocking with canisters in the underlying layer.
Claim 3
Dependent Claim
35 words
A method as in claim 1, further comprising collecting drainage from different areas of the bed beneath the integrated structure, and analyzing the discharge from each of the areas for the leakage of hazardous waste.
Claim 4
Dependent Claim
21 words
A method as in claim 1, further comprising covering the integrated structure with a substantially impenetrable barrier to inhibit accidental penetration.
Claim 5
Dependent Claim
23 words
A method as in claim 1, wherein the primary containers are sealed in the canisters with a fluid sealant which hardens after curing.
Claim 6
Dependent Claim
12 words
A method as in claim 4, wherein the fluid sealant is grout.
Claim 7
Dependent Claim
33 words
A method as in claim 2, wherein the canisters in a particular area are unstacked and examined for leakage in response to the detection of hazardous waste in the drainage from that area.
Claim 8
Dependent Claim
134 words
A containment structure for hazardous waste materials, said structure being located on an excavated site and comprising: a barrier layer over the excavation site, said barrier being substantially impermeable to aqueous penetration; a plurality of canisters stacked over the barrier layer to form an integrated structure, wherein each of said canisters houses one or more primary waste containers and includes means for externally interlocking with surrounding canisters so that individual canisters may be stacked and held in place by gravity while remaining able to shift relative positions in response to earth movement and wherein said canisters are arranged in at least two layers with each canister in an overlying layer interlocking with canisters in the underlying layer; and means for sealing over the top and sides of the integrated structure to inhibit accidental penetration.
Claim 9
Dependent Claim
134 words
A containment structure for hazardous waste materials, said structure being located on an excavated site and comprising: a barrier layer over the excavation site, said barrier being substantially impermeable to aqueous penetration; a plurality of canisters stacked over the barrier layer to form an integrated structure, wherein each of said canisters houses one or more primary waste containers and includes means for externally interlocking with surrounding canisters so that individual canisters may be stacked and held in place by gravity while remaining able to shift relative positions in response to earth movement and wherein said canisters are arranged in at least two layers with each canister in an overlying layer interlocking with canisters in the underlying layer; and means for sealing over the top and sides of the integrated structure to inhibit accidental penetration.
Claim 10
Dependent Claim
14 words
A containment structure as in claim 7, wherein the barrier layer includes compacted clay.
Claim 11
Dependent Claim
14 words
A containment structure as in claim 7, wherein the canisters are composed of concrete.
Claim 12
Dependent Claim
29 words
A containment structure as in claim 9, wherein the primary containers are sealed within the canisters by a grout sealant which fills substantially all the interstices between the containers.
Claim 13
Dependent Claim
24 words
A containment structure as in claim 7, wherein each canister in the immediately overlying layer interlocks with four canisters in the immediately underlying layer.
Claim 14
Dependent Claim
28 words
A containment structure as in claim 7, wherein the means for sealing over the top and sides comprises panels which will interlock with the integrated structure of canisters.
Claim 15
Dependent Claim
164 words
A containment structure for hazardous waste materials, said structure being located on an excavated site and comprising: a barrier layer over the bottom of the excavation site, said barrier layer being substantially impermeable to aqueous penetration; a plurality of canisters stacked over the barrier layer to form an integrated structure, wherein each of said canisters houses one or more primary waste containers sealing the hazardous wastes therein, said primary waste containers being sealed within the canisters by a fluid sealant which hardens after curing, said individual canisters each including means for externally interlocking with surrounding canisters so that said individual canisters may be stacked and held in place by gravity while remaining able to shift relative positions in response to earth movements; means intermediate the stacked containers and the barrier layer for collecting drainage separately from a multiplicity of preselected isolated zones beneath the integrated structure; and means for detecting leakage of the hazardous material into the drainage from each of the preselected zones.
Claim 16
Dependent Claim
164 words
A containment structure for hazardous waste materials, said structure being located on an excavated site and comprising: a barrier layer over the bottom of the excavation site, said barrier layer being substantially impermeable to aqueous penetration; a plurality of canisters stacked over the barrier layer to form an integrated structure, wherein each of said canisters houses one or more primary waste containers sealing the hazardous wastes therein, said primary waste containers being sealed within the canisters by a fluid sealant which hardens after curing, said individual canisters each including means for externally interlocking with surrounding canisters so that said individual canisters may be stacked and held in place by gravity while remaining able to shift relative positions in response to earth movements; means intermediate the stacked containers and the barrier layer for collecting drainage separately from a multiplicity of preselected isolated zones beneath the integrated structure; and means for detecting leakage of the hazardous material into the drainage from each of the preselected zones.
Claim 17
Dependent Claim
14 words
A containment structure as in claim 13, wherein the barrier layer includes compacted clay.
Claim 18
Dependent Claim
14 words
A containment structure as in claim 13, wherein the canisters are composed of concrete.
Claim 19
Dependent Claim
29 words
A containment structure as in claim 13, wherein the means for collecting drainage includes collection conduits placed at the low point of said isolated zones beneath the integrated structure.
Claim 20
Dependent Claim
22 words
A containment structure as in claim 17 wherein the means for detecting leakage includes separate collection sumps associated with each collection conduit.
Claim 21
Dependent Claim
32 words
A containment structure as in claim 19, wherein the canisters are arranged in layers, with each canister locking into four canisters in both the immediately overlying layer and the immediately underlying layer.
Claim 22
Dependent Claim
25 words
A containment structure as in claim 13, further comprising means for sealing over the top and sides of the integrated structure to inhibit accidental penetration.
Claim 23
Dependent Claim
31 words
A containment structure as in claim 19, wherein the means for sealing over the top and sides comprises top and side panels which will interlock with the integrated structure of canisters.
References Cited (Backward Citations)
US3046403A
Cited
US3935467A
Cited
US4229316A
Cited
US4177386A
Cited
US4363434A
Cited
US4453857A
Cited
US4350461A
Cited
US4375930A
Cited
US4415459A
Cited
US4428700A
Cited
US4543013A
Cited
US4624604A
Cited
US4513205A
Cited
US4588088A
Cited
DE3303067A1
Cited
US4464081A
Cited
US4632602A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1992-07-03 | 1993-01-02 | 1993-07-04 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1996-07-03 | 1997-01-02 | 1997-07-04 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2000-07-03 | 2001-01-02 | 2001-07-04 | $7700.00 | Window Closed / Lapsed |