Patent US4844204A successfully refreshed from Google Patents.
US4844204A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Procedure for modernizing the control system of a lift
Assignee: Kone Elevator GmbH
•
Filing: 1984-11-05
•
Granted: 1989-07-04
•
Expires: 2004-11-05
Abstract
Abstract The present invention concerns a procedure for modernizing the control system of a lift group, in which procedure the group control system coordinating the operation of the lifts is renovated and connected to the already existing lift-specific control system. As taught by the new procedure, for each lift is connected one matching computer between the new group control and the apparatus controlling the functions of the lift, and by the aid of which the lift-specific signals are transmitted to the control of the lift and to the group control.
Inventors
- 👤 Seppo Ovaska
- 👤 Ralf Ekholm
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-26 20:07
CPC Classifications
B; B66; B66B; B66B1/00; B66B1/02; B66B1/06; B66B1/14; B66B1/18; B66B19/00; B66B19/007
Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
135 words
A procedure for modernizing the control system of a bank of elevators, resulting in a new group control system for efficiently coordinating the operation of the elevators via the control systems associated with each of the elevators, comprising the steps of: (a) installing a new group control system and an adapting computer for each elevator; (b) connecting each of the adapting computers to communicate with the new group control system; (c) testing said new group control system; (d) disconnecting a selected one of said elevators from use, connecting the corresponding adapting computer to the control system of the disconnected elevator and restarting the disconnected elevator under control of the new group control system; (e) repeating the foregoing step (d) until all elevators in the elevator bank are under control of the new group control system.
Claim 2
Dependent Claim
135 words
A procedure for modernizing the control system of a bank of elevators, resulting in a new group control system for efficiently coordinating the operation of the elevators via the control systems associated with each of the elevators, comprising the steps of: (a) installing a new group control system and an adapting computer for each elevator; (b) connecting each of the adapting computers to communicate with the new group control system; (c) testing said new group control system; (d) disconnecting a selected one of said elevators from use, connecting the corresponding adapting computer to the control system of the disconnected elevator and restarting the disconnected elevator under control of the new group control system; (e) repeating the foregoing step (d) until all elevators in the elevator bank are under control of the new group control system.
Claim 3
Dependent Claim
36 words
The procedure of claim 1, further comprising the step of successively connecting each said adapting computer to the control system of each respective elevator to replace the functions of the control system of each corresponding elevator.
Claim 4
Dependent Claim
49 words
The procedure of claim 1, further comprising the step of successively connecting each said adapting computer to the control system of each respective elevator to produce part of the signals required by the new group control system, based on signals received from the control system of each corresponding elevator.
Claim 5
Dependent Claim
52 words
The procedure of claim 1, further comprising the step of connecting the adapting computers to two separate data transfer buses to communicate with the new control system, one of said data transfer buses being an active bus and the other of said data transfer buses being a backup bus to ensure reliability.
Claim 6
Dependent Claim
181 words
A procedure for modernizing the control system of a bank of elevators, resulting in a group control system efficiently coordinating the operation of the elevators via the control systems associated with each of said elevators, comprising the steps of: (a) installing the new group control system and an adapting computer for each elevator and connecting each of said adapting computers for communication with said group control system; (b) testing said group control system; (c) disconnecting each elevator in turn from use, connecting the corresponding adapting computer to the respective control system of the disconnected elevator, and reconnecting the elevator into operation so that the control of the old system is maintained but the new group control system is still aware of all the elevator operations; (d) repeating the sequence of steps (a)-(c) until all the elevators in the elevator bank have been connected to the new group control system; (e) disconnecting each elevator in turn from the old control system and transferring control to the new group control system until all elevators are under control of said new group control system.
Claim 7
Dependent Claim
181 words
A procedure for modernizing the control system of a bank of elevators, resulting in a group control system efficiently coordinating the operation of the elevators via the control systems associated with each of said elevators, comprising the steps of: (a) installing the new group control system and an adapting computer for each elevator and connecting each of said adapting computers for communication with said group control system; (b) testing said group control system; (c) disconnecting each elevator in turn from use, connecting the corresponding adapting computer to the respective control system of the disconnected elevator, and reconnecting the elevator into operation so that the control of the old system is maintained but the new group control system is still aware of all the elevator operations; (d) repeating the sequence of steps (a)-(c) until all the elevators in the elevator bank have been connected to the new group control system; (e) disconnecting each elevator in turn from the old control system and transferring control to the new group control system until all elevators are under control of said new group control system.
Claim 8
Dependent Claim
35 words
The procedure of claim 5, further comprising the step of successively connecting each adapting computer to the control system of the corresponding elevator to replace the functions of the control system of the corresponding elevator.
Claim 9
Dependent Claim
49 words
The procedure of claim 5, further comprising the step of successively connecting each said adapting computer to the control system of the corresponding elevator to produce part of the signals required by the new group control system, based on signals received from the control system of the corresponding elevator.
Claim 10
Dependent Claim
53 words
The procedure of claim 5, further comprising the step of connecting the adapting computers to two separate data transfer buses to communicate with the new group control system, one of said data transfer buses being an active bus and the other of said data transfer buses being a backup bus to ensure reliability.
Claim 11
Dependent Claim
154 words
A procedure for modernizing the control system of a bank of elevators having an old group control system, resulting in a new group control system efficiently coordinating the operation elevator, comprising the steps of: (a) installing the new group control system for said bank of elevators and an adapting computer for each individual elevator of said bank of elevators; (b) connecting each of said adapting computers to communicate with said new group control system; (c) testing said new group control system; (d) establishing a one-way incoming connection from each individual elevator of said bank of elevators to a corresponding adapting computer, thereby allowing said new group control system to be aware of the operations of all of the elevators; (e) disconnecting one elevator at a time from said old group control system and transferring the control to said new group control system, until all elevators are under control of the new group control system.
Claim 12
Dependent Claim
154 words
A procedure for modernizing the control system of a bank of elevators having an old group control system, resulting in a new group control system efficiently coordinating the operation elevator, comprising the steps of: (a) installing the new group control system for said bank of elevators and an adapting computer for each individual elevator of said bank of elevators; (b) connecting each of said adapting computers to communicate with said new group control system; (c) testing said new group control system; (d) establishing a one-way incoming connection from each individual elevator of said bank of elevators to a corresponding adapting computer, thereby allowing said new group control system to be aware of the operations of all of the elevators; (e) disconnecting one elevator at a time from said old group control system and transferring the control to said new group control system, until all elevators are under control of the new group control system.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1992-07-03 | 1993-01-02 | 1993-07-04 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1996-07-03 | 1997-01-02 | 1997-07-04 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2000-07-03 | 2001-01-02 | 2001-07-04 | $7700.00 | Window Closed / Lapsed |