← Back to Patent Explorer
US4844204A Expired / Lapsed US ⏱️ 0.0 years remaining

Procedure for modernizing the control system of a lift

Assignee: Kone Elevator GmbH
•
Filing: 1984-11-05
•
Granted: 1989-07-04
•
Expires: 2004-11-05
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The present invention concerns a procedure for modernizing the control system of a lift group, in which procedure the group control system coordinating the operation of the lifts is renovated and connected to the already existing lift-specific control system. As taught by the new procedure, for each lift is connected one matching computer between the new group control and the apparatus controlling the functions of the lift, and by the aid of which the lift-specific signals are transmitted to the control of the lift and to the group control.

Inventors

  • 👤 Seppo Ovaska
  • 👤 Ralf Ekholm

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 17:11
CPC Classifications
B; B66; B66B; B66B1/00; B66B1/02; B66B1/06; B66B1/14; B66B1/18; B66B19/00; B66B19/007

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 135 words
A procedure for modernizing the control system of a bank of elevators, resulting in a new group control system for efficiently coordinating the operation of the elevators via the control systems associated with each of the elevators, comprising the steps of: (a) installing a new group control system and an adapting computer for each elevator; (b) connecting each of the adapting computers to communicate with the new group control system; (c) testing said new group control system; (d) disconnecting a selected one of said elevators from use, connecting the corresponding adapting computer to the control system of the disconnected elevator and restarting the disconnected elevator under control of the new group control system; (e) repeating the foregoing step (d) until all elevators in the elevator bank are under control of the new group control system.
Claim 2
Dependent Claim 135 words
A procedure for modernizing the control system of a bank of elevators, resulting in a new group control system for efficiently coordinating the operation of the elevators via the control systems associated with each of the elevators, comprising the steps of: (a) installing a new group control system and an adapting computer for each elevator; (b) connecting each of the adapting computers to communicate with the new group control system; (c) testing said new group control system; (d) disconnecting a selected one of said elevators from use, connecting the corresponding adapting computer to the control system of the disconnected elevator and restarting the disconnected elevator under control of the new group control system; (e) repeating the foregoing step (d) until all elevators in the elevator bank are under control of the new group control system.
Claim 3
Dependent Claim 36 words
The procedure of claim 1, further comprising the step of successively connecting each said adapting computer to the control system of each respective elevator to replace the functions of the control system of each corresponding elevator.
Claim 4
Dependent Claim 49 words
The procedure of claim 1, further comprising the step of successively connecting each said adapting computer to the control system of each respective elevator to produce part of the signals required by the new group control system, based on signals received from the control system of each corresponding elevator.
Claim 5
Dependent Claim 52 words
The procedure of claim 1, further comprising the step of connecting the adapting computers to two separate data transfer buses to communicate with the new control system, one of said data transfer buses being an active bus and the other of said data transfer buses being a backup bus to ensure reliability.
Claim 6
Dependent Claim 181 words
A procedure for modernizing the control system of a bank of elevators, resulting in a group control system efficiently coordinating the operation of the elevators via the control systems associated with each of said elevators, comprising the steps of: (a) installing the new group control system and an adapting computer for each elevator and connecting each of said adapting computers for communication with said group control system; (b) testing said group control system; (c) disconnecting each elevator in turn from use, connecting the corresponding adapting computer to the respective control system of the disconnected elevator, and reconnecting the elevator into operation so that the control of the old system is maintained but the new group control system is still aware of all the elevator operations; (d) repeating the sequence of steps (a)-(c) until all the elevators in the elevator bank have been connected to the new group control system; (e) disconnecting each elevator in turn from the old control system and transferring control to the new group control system until all elevators are under control of said new group control system.
Claim 7
Dependent Claim 181 words
A procedure for modernizing the control system of a bank of elevators, resulting in a group control system efficiently coordinating the operation of the elevators via the control systems associated with each of said elevators, comprising the steps of: (a) installing the new group control system and an adapting computer for each elevator and connecting each of said adapting computers for communication with said group control system; (b) testing said group control system; (c) disconnecting each elevator in turn from use, connecting the corresponding adapting computer to the respective control system of the disconnected elevator, and reconnecting the elevator into operation so that the control of the old system is maintained but the new group control system is still aware of all the elevator operations; (d) repeating the sequence of steps (a)-(c) until all the elevators in the elevator bank have been connected to the new group control system; (e) disconnecting each elevator in turn from the old control system and transferring control to the new group control system until all elevators are under control of said new group control system.
Claim 8
Dependent Claim 35 words
The procedure of claim 5, further comprising the step of successively connecting each adapting computer to the control system of the corresponding elevator to replace the functions of the control system of the corresponding elevator.
Claim 9
Dependent Claim 49 words
The procedure of claim 5, further comprising the step of successively connecting each said adapting computer to the control system of the corresponding elevator to produce part of the signals required by the new group control system, based on signals received from the control system of the corresponding elevator.
Claim 10
Dependent Claim 53 words
The procedure of claim 5, further comprising the step of connecting the adapting computers to two separate data transfer buses to communicate with the new group control system, one of said data transfer buses being an active bus and the other of said data transfer buses being a backup bus to ensure reliability.
Claim 11
Dependent Claim 154 words
A procedure for modernizing the control system of a bank of elevators having an old group control system, resulting in a new group control system efficiently coordinating the operation elevator, comprising the steps of: (a) installing the new group control system for said bank of elevators and an adapting computer for each individual elevator of said bank of elevators; (b) connecting each of said adapting computers to communicate with said new group control system; (c) testing said new group control system; (d) establishing a one-way incoming connection from each individual elevator of said bank of elevators to a corresponding adapting computer, thereby allowing said new group control system to be aware of the operations of all of the elevators; (e) disconnecting one elevator at a time from said old group control system and transferring the control to said new group control system, until all elevators are under control of the new group control system.
Claim 12
Dependent Claim 154 words
A procedure for modernizing the control system of a bank of elevators having an old group control system, resulting in a new group control system efficiently coordinating the operation elevator, comprising the steps of: (a) installing the new group control system for said bank of elevators and an adapting computer for each individual elevator of said bank of elevators; (b) connecting each of said adapting computers to communicate with said new group control system; (c) testing said new group control system; (d) establishing a one-way incoming connection from each individual elevator of said bank of elevators to a corresponding adapting computer, thereby allowing said new group control system to be aware of the operations of all of the elevators; (e) disconnecting one elevator at a time from said old group control system and transferring the control to said new group control system, until all elevators are under control of the new group control system.

References Cited (Backward Citations)

US4191277A Cited
US4346789A Cited
US4363381A Cited
US4410959A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1992-07-03 1993-01-02 1993-07-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1996-07-03 1997-01-02 1997-07-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2000-07-03 2001-01-02 2001-07-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag