US4820080A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process for the construction of a drain system
Assignee: LICENCE TRADE INNOVACIOS KFT
•
Filing: 1987-03-11
•
Granted: 1989-04-11
•
Expires: 2007-03-11
Abstract
Abstract A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft (18) preferably reaching the vicinity of an impermeable clay layer (2) is made from the ground surface for the suction body (A) transversely to and in communication with the hole (9) of the catchment body (B).
Inventors
- 👤 Laszlo Varkonyi
- 👤 Gyula Vaci
- 👤 Csaba Asszonyi
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 16:16
CPC Classifications
E; E02; E02B; E02B11/00
Claims Analysis
Total Claims: 21
Claim 1
Independent Claim
86 words
Process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered, wherein, from a working pit or bank, a nearly horizontal hole is drilled for the catchment body, and a hole or shaft--preferably reaching the vicinity of an impermeable clay layer--is made from the ground surface for a filled suction body, said hole or shaft directed transversely to and so be in communication with the hole of the catchment body.
Claim 2
Dependent Claim
86 words
Process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered, wherein, from a working pit or bank, a nearly horizontal hole is drilled for the catchment body, and a hole or shaft--preferably reaching the vicinity of an impermeable clay layer--is made from the ground surface for a filled suction body, said hole or shaft directed transversely to and so be in communication with the hole of the catchment body.
Claim 3
Dependent Claim
38 words
Process in claim 1, wherein two or several, parallel and preferably vertical holes or shafts are made from the ground surface for two or several suction bodies, which together with the catchment body form a comb-shaped drain system.
Claim 4
Dependent Claim
36 words
Process as claimed in claim 1, wherein the catchment body is formed with a drain pipe placed into the nearly horizontal hole, where the drain pipe is assembled with several pipe sections joined with sleeve joint.
Claim 5
Dependent Claim
15 words
Process as claimed in claim 3, wherein the drain pipe is covered with geotextile filter.
Claim 6
Dependent Claim
43 words
Process as claimed in claim 1 wherein, a casing is driven into the hole drilled when the catchment body is prepared, into which a geotextile roll is arranged, then granular charge is pressed into the geotextile roll, and finally the casing is removed.
Claim 7
Dependent Claim
17 words
Process as claimed in claim 2, wherein the suction bodies include perforated pipes placed into the holes.
Claim 8
Dependent Claim
28 words
Process as claimed in claim 2, wherein, the suction bodies are formed by placing at least one geotextile bag filled with granular charge into the holes or shafts.
Claim 9
Dependent Claim
102 words
Process as claimed in claim 2, wherein, first the holes or shafts of the suction bodies are made, then a plug prefabricated from geotextile bag lined preferably with synthetic fibre quilt is placed into the lower part of the holes or shafts in the vicinity of the intended connection with the catchment body, then the granular charge filled into the geotextile bag is placed in the holes or shafts on the plug, furthermore the nearly horizontal hole of the catchment body is drilled, which passes through the plugs of the suction bodies, and finally the catchment body is built into the hole.
Claim 10
Dependent Claim
21 words
Process as claimed in claim 1, wherein, the hole of the suction body has a diameter between 30 and 60 cm.
Claim 11
Dependent Claim
32 words
Process as claimed in claim 1, wherein, the shaft of suction body has a rectangular cross-section, the length of which is betwen 1.5-1.6 m, and the width between 0.5 and 0.7 m.
Claim 12
Dependent Claim
32 words
Process as claimed in claim 2, wherein, the suction bodies are laid at a distance (L) from each other, depending on the permeability of the soil and extent of the proposed drainage.
Claim 13
Dependent Claim
120 words
A process for the construction of a comb-shaped drainage system wherein two or more parallel and substantially vertical holes or shafts are made down into ground to be drained, whereupon a plug comprising a geotextile bag lined with synthetic fiber quilt is placed into each hole or shaft after which at least one granular charge filled geotextile bag is placed into each hole or shaft on top of said plug forming a suction body in each hole or shaft, whereupon a nearly horizontal bore is drilled from a working pit or bank, passing through said plugs forming bases of the suction bodies, followed by insertion of a catchment body into said bore and extending through and communicating with said plugs.
Claim 14
Dependent Claim
120 words
A process for the construction of a comb-shaped drainage system wherein two or more parallel and substantially vertical holes or shafts are made down into ground to be drained, whereupon a plug comprising a geotextile bag lined with synthetic fiber quilt is placed into each hole or shaft after which at least one granular charge filled geotextile bag is placed into each hole or shaft on top of said plug forming a suction body in each hole or shaft, whereupon a nearly horizontal bore is drilled from a working pit or bank, passing through said plugs forming bases of the suction bodies, followed by insertion of a catchment body into said bore and extending through and communicating with said plugs.
Claim 15
Dependent Claim
39 words
A process as in claim 12, wherein, the catchment body is formed with a porous drain pipe placed into said nearly horizontal bore, where the drain pipe is assembled of a plurality of pipe sections joined with sleeve joints.
Claim 16
Dependent Claim
16 words
A process as in claim 13, wherein, said drain pipe is covered by a geotextile filter.
Claim 17
Dependent Claim
47 words
A process as in claim 12, wherein, a casing is driven into said bore into which a geotextile roll is arranged and then filled with a granular charge, whereupon said casing is removed leaving the filled geotextile roll in place as the catchment body in said bore.
Claim 18
Dependent Claim
25 words
A process as in claim 12, wherein, said hole or shaft is lined with a perforated tubular body into which said suction body is placed.
Claim 19
Dependent Claim
25 words
A process as in claim 12, wherein, a plurality of granular charge filled geotextile bags are placed on said plug in each hole or shaft.
Claim 20
Dependent Claim
17 words
A process as in claim 12, wherein, said hole has a diameter of 30 to 60 cm.
Claim 21
Dependent Claim
30 words
A process as in claim 12, wherein, said shaft has a rectangular cross-section with dimensions in the range of 0.4 m to 1.5 m to 0.7 m by 1.6 m.
References Cited (Backward Citations)
US599719A
Cited
US968226A
Cited
US1866826A
Cited
FR794744A
Cited
US3403519A
Cited
US3396541A
Cited
DE2137417A1
Cited
US4019326A
Cited
GB2028405A
Cited
US4403890A
Cited
JPS59210A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1992-04-10 | 1992-10-10 | 1993-04-11 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1996-04-10 | 1996-10-10 | 1997-04-11 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2000-04-10 | 2000-10-10 | 2001-04-11 | $7700.00 | Window Closed / Lapsed |