Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
162 words
A method of making an earthen, artificial batters' box for an outdoor baseball or softball diamond playing field comprising the steps of: (a) providing composite, laminated pads of elastomeric material having a roughened upper surface and area dimensions; (b) excavating an area bout the home plate of a baseball or softball diamond to a depth of about one inch greater than the thickness of the composite, laminated pads over the entire area of the excavation; (c) placing the prepared composite, laminated pads in said excavation; (d) covering each said pad with a layer of earth throughout its area which is thick enough to bring the batters' box area up to the same level as the surrounding playing surface, whereby suitable traction is provided for said batters and for the catcher without permitting such players to dig deep holes in the surface of the batters' box; and (e) outlining the area of the batters' box with white chalk around said composite, laminated pads.
Claim 2
Independent Claim
162 words
A method of making an earthen, artificial batters' box for an outdoor baseball or softball diamond playing field comprising the steps of: (a) providing composite, laminated pads of elastomeric material having a roughened upper surface and area dimensions; (b) excavating an area bout the home plate of a baseball or softball diamond to a depth of about one inch greater than the thickness of the composite, laminated pads over the entire area of the excavation; (c) placing the prepared composite, laminated pads in said excavation; (d) covering each said pad with a layer of earth throughout its area which is thick enough to bring the batters' box area up to the same level as the surrounding playing surface, whereby suitable traction is provided for said batters and for the catcher without permitting such players to dig deep holes in the surface of the batters' box; and (e) outlining the area of the batters' box with white chalk around said composite, laminated pads.
Claim 3
Dependent Claim
32 words
A method of making a batters' box as set forth in claim 1, wherein the composite, laminated pad has a roughened upper surface whereby the earth is retained on said upper surface.
Claim 4
Dependent Claim
23 words
A method of making a batters' box as set forth in claim 1, wherein said composite, laminated pad has a woven, intermediate layer.
Claim 5
Dependent Claim
36 words
A method of making a batters' box as set forth in claim 1, wherein said composite, laminated pad is prepared to be less in area than the area of the batters' box outlined by chalk lines.
Claim 6
Dependent Claim
26 words
A method of making a batters' box as set forth in claim 1, wherein said composite, laminated pad is at least one-half an inch in thickness.
Claim 7
Independent Claim
161 words
A method of making an earthen, artificial batters' box for an outdoor baseball or softball diamond playing field comprising the steps of: (a) providing elastomeric pads having an upper friction surface and prescribed thickness and area dimensions; (b) excavating an area about the home plate of a baseball or softball diamond to a depth of about one inch greater than the thickness of said pads over the entire area of the excavation; (c) placing the elastomeric pads in said excavation; (d) covering said pad with a layer of earth throughout its area which is thick enough to bring the batters' box area up to the same level as the surrounding playing surface, whereby suitable traction is provided for said batters and for the catcher without permitting such players to dig deep holes in the surface of the batters' box; and (e) outlining the area of the batters' box with white chalk around said elastomeric pads covered with earth in said excavation.
Claim 8
Independent Claim
161 words
A method of making an earthen, artificial batters' box for an outdoor baseball or softball diamond playing field comprising the steps of: (a) providing elastomeric pads having an upper friction surface and prescribed thickness and area dimensions; (b) excavating an area about the home plate of a baseball or softball diamond to a depth of about one inch greater than the thickness of said pads over the entire area of the excavation; (c) placing the elastomeric pads in said excavation; (d) covering said pad with a layer of earth throughout its area which is thick enough to bring the batters' box area up to the same level as the surrounding playing surface, whereby suitable traction is provided for said batters and for the catcher without permitting such players to dig deep holes in the surface of the batters' box; and (e) outlining the area of the batters' box with white chalk around said elastomeric pads covered with earth in said excavation.
Claim 9
Dependent Claim
22 words
The method of claim 6 including providing a roughened surface on said friction surface to aid in retaining earth covering said pads.
Claim 10
Dependent Claim
130 words
An earthen, artificial batters' box having space for right-handed and left-handed batters and the catcher to stand during the play of a baseball or softball game, comprising: (a) an excavation extending about home plate; (b) composite, laminated pads, comprising a bottom layer of an elastomeric material and a top layer of an elastomeric material each bonded to an intermediate woven fabric disposed within said excavation; (c) a layer of earth, at least one inch in thickness throughout its area, covering said pads; and (d) chalk lines defining the area of the batters' box said area exceeding the area of said composite, laminated pads, whereby players will be able to implant their spikes in said layer of earth without being able to dig holes in said batters' box under game conditions.
Claim 11
Dependent Claim
130 words
An earthen, artificial batters' box having space for right-handed and left-handed batters and the catcher to stand during the play of a baseball or softball game, comprising: (a) an excavation extending about home plate; (b) composite, laminated pads, comprising a bottom layer of an elastomeric material and a top layer of an elastomeric material each bonded to an intermediate woven fabric disposed within said excavation; (c) a layer of earth, at least one inch in thickness throughout its area, covering said pads; and (d) chalk lines defining the area of the batters' box said area exceeding the area of said composite, laminated pads, whereby players will be able to implant their spikes in said layer of earth without being able to dig holes in said batters' box under game conditions.
Claim 12
Dependent Claim
30 words
A batters' box as set forth in claim 6, wherein said top layers of said pads have a roughened surface to reduce spreading of said earth layer and hole formation.
Claim 13
Dependent Claim
22 words
A batters' box as set forth in claim 6, wherein said bottom layers of said composite, laminated pads are composed of polyurethane.
Claim 14
Dependent Claim
24 words
A batters' box as set forth in claim 6, wherein said composite, laminated pads are anchored to the earth by means of mechanical anchors.
Claim 15
Dependent Claim
30 words
A batters' box as set forth in claim 6, wherein said composite, laminated pads comprise top and bottom layers of polyurethane each bonded to an intermediate layer of woven fabric.