Patent US4789569A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4789569A Expired / Lapsed US ⏱️ 0.0 years remaining

Process and device for metering pulverulent materials

Assignee: Saint Gobain Vitrage SA
•
Filing: 1986-01-03
•
Granted: 1988-12-06
•
Expires: 2006-01-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The invention is in a pneumatic powder ejector comprising a suction stage and an injection stage. The suction stage includes a suction chamber (16), a venturi (14) communicating a primary gas to the suction chamber and a lateral suction input (18) offset in relation to the downstream and of the venturi. The injection stage includes a nozzle (22), an injection chamber (36) and a diffuser (38). The stages are located within and coaxially of the body of a tubular ejector. The nozzle includes a path for powder and primary gas between the suction chamber and diffuser, and is formed to provide a flow path of reduced dimension to communicate a secondary or entrainment gas between the diffuser and injection station.

Inventors

  • 👤 Jean-Pierre Douche
  • 👤 Jean-Claude Coulon
  • 👤 Pierre Bouttier

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 19:52
CPC Classifications
B; B05; B05D; B05D1/00; B05D1/02; B05D1/12; G; G01; G01F; G01F13/00; G01F13/001

Claims Analysis

Total Claims: 17
Claim 1
Independent Claim 175 words
A process for metering a pulverulent material at a first position into a confined disposition and removing a constant and precise quantity of said pulverulent material from said confined disposition at a second position, said pulverulent material being maintained under atmospheric pressure, wherein said process comprises continuously supplying a receptacle with a constant flow of said pulverulent material in said receptacle at a substantially constant level, continuously stirring said pulverulent material within said receptacle to maintain said material in a substantially disagglomerated and homogenized condition, metering substantially constantly a predetermined, reproducible quantity of said pulverulent material from said receptacle into said confined disposition, wherein said confined disposition forms the bottom of said receptacle and compacting of said pulverulent material within said confined disposition is prevented, moving said confined pulverulent material to said second position, vibrating said confined disposition to prevent agglomerations of said pulverulent material, and removing a constant and precise quantity of the uncompacted pulverulent material from said confined disposition at said second position for subsequent distribution at a constant flow upon a substrate.
Claim 2
Dependent Claim 175 words
A process for metering a pulverulent material at a first position into a confined disposition and removing a constant and precise quantity of said pulverulent material from said confined disposition at a second position, said pulverulent material being maintained under atmospheric pressure, wherein said process comprises continuously supplying a receptacle with a constant flow of said pulverulent material in said receptacle at a substantially constant level, continuously stirring said pulverulent material within said receptacle to maintain said material in a substantially disagglomerated and homogenized condition, metering substantially constantly a predetermined, reproducible quantity of said pulverulent material from said receptacle into said confined disposition, wherein said confined disposition forms the bottom of said receptacle and compacting of said pulverulent material within said confined disposition is prevented, moving said confined pulverulent material to said second position, vibrating said confined disposition to prevent agglomerations of said pulverulent material, and removing a constant and precise quantity of the uncompacted pulverulent material from said confined disposition at said second position for subsequent distribution at a constant flow upon a substrate.
Claim 3
Dependent Claim 29 words
The process according to claim 1 wherein the receptacle is fed at a constant level chosen sufficiently low to prevent compacting of the pulverulent material in the confined disposition.
Claim 4
Dependent Claim 30 words
The process according to claim 2 or 1 wherein the feeding of the receptacle is obtained by Archimedes screw means which performs a metering by weight of the pulverulent material.
Claim 5
Dependent Claim 35 words
The process according to claim 2 or 1 wherein the feeding of the receptacle is obtained by means capable of metering the amount of said pulverulent material to be deposited within said receptacle by volume.
Claim 6
Dependent Claim 25 words
The process of claim 1 which further comprises coating the pulverulent material removed from said confined disposition onto at least one surface of a substrate.
Claim 7
Dependent Claim 136 words
A process for reproducibly metering a constant and precise quantity of a pulverulent material which comprises: providing a continuously metered flow of said pulverulent material into receptacle means, which flow varies by less than 1%; continuously agitating said pulverulent material within said receptacle means by stirring to homogenize said material and to prevent said material from compacting therein; constantly metering a precise reproducible quantity of said pulverulent material into movable groove means forming the bottom of said receptacle means in a manner to avoid compaction or agglomeration of said pulverulent material while maintaining a substantially constant level of powder within said receptacle means; and aspirating into a carrier gas said constant and precise quantity of said uncompacted pulverulent material from said groove means through pipe means for later distribution at a constant flow upon a substrate.
Claim 8
Dependent Claim 136 words
A process for reproducibly metering a constant and precise quantity of a pulverulent material which comprises: providing a continuously metered flow of said pulverulent material into receptacle means, which flow varies by less than 1%; continuously agitating said pulverulent material within said receptacle means by stirring to homogenize said material and to prevent said material from compacting therein; constantly metering a precise reproducible quantity of said pulverulent material into movable groove means forming the bottom of said receptacle means in a manner to avoid compaction or agglomeration of said pulverulent material while maintaining a substantially constant level of powder within said receptacle means; and aspirating into a carrier gas said constant and precise quantity of said uncompacted pulverulent material from said groove means through pipe means for later distribution at a constant flow upon a substrate.
Claim 9
Dependent Claim 23 words
The process of claim 6 which further comprises disagglomerating any agglomerations of said pulverulent material which are formed within said movable groove means.
Claim 10
Dependent Claim 17 words
The process of claim 7 wherein said disagglomeration step is performed by vibrating said moveable groove means.
Claim 11
Dependent Claim 196 words
A process for metering a pulverulent material at a first position into a confined disposition and removing a constant and precise quantity of said pulverulent material from said confined disposition at a second position, said pulverulent material being maintained under atmospheric pressure, wherein said process comprises continuously supplying a receptacle with a constant flow of said pulverulent material with the use of Archimedes screw means for performing a metering by volume of the pulverulent material, said material within said receptacle being maintained at substantially a constant level chosen sufficiently low to prevent compacting of the pulverulent material, continuously stirring said pulverulent material within said receptacle to maintain said material in a substantially disagglomerated and homogenized condition, metering substantially constantly a predetermined, reproducible quantity of said pulverulent material from said receptacle into said confined disposition wherein said confined disposition forms the bottom of said receptacle means and compacting of said pulverulent material within said confined disposition is prevented, moving said confined pulverulent material to said second position and removing a constant and precise quantity of the uncompacted pulverulent material from said confined disposition at said second position for subsequent distribution at a constant flow upon a substrate.
Claim 12
Dependent Claim 196 words
A process for metering a pulverulent material at a first position into a confined disposition and removing a constant and precise quantity of said pulverulent material from said confined disposition at a second position, said pulverulent material being maintained under atmospheric pressure, wherein said process comprises continuously supplying a receptacle with a constant flow of said pulverulent material with the use of Archimedes screw means for performing a metering by volume of the pulverulent material, said material within said receptacle being maintained at substantially a constant level chosen sufficiently low to prevent compacting of the pulverulent material, continuously stirring said pulverulent material within said receptacle to maintain said material in a substantially disagglomerated and homogenized condition, metering substantially constantly a predetermined, reproducible quantity of said pulverulent material from said receptacle into said confined disposition wherein said confined disposition forms the bottom of said receptacle means and compacting of said pulverulent material within said confined disposition is prevented, moving said confined pulverulent material to said second position and removing a constant and precise quantity of the uncompacted pulverulent material from said confined disposition at said second position for subsequent distribution at a constant flow upon a substrate.
Claim 13
Dependent Claim 145 words
A process for reproducibly metering a constant and precise quantity of a pulverulent material which comprises: providing a continuously metered flow of said pulverulent material into receptacle means wherein the feeding of the receptacle means is obtained by means for metering the amount of said pulverulent material to be deposited within said receptacle means wherein said metering means maintains a substantially constant volume of pulverulent material in said receptacle means; continuously agitating said pulverulent material within said receptacle means to homogenize said material and to prevent said material from compacting therein; continuously metering a precise reproducible quantity of said pulverulent material into movable groove means forming the bottom of said receptacle means; and aspirating into a carrier gas said constant and precise quantity of said uncompacted pulverulent material from said groove means through pipe means for later distribution at a constant flow upon a substrate.
Claim 14
Dependent Claim 145 words
A process for reproducibly metering a constant and precise quantity of a pulverulent material which comprises: providing a continuously metered flow of said pulverulent material into receptacle means wherein the feeding of the receptacle means is obtained by means for metering the amount of said pulverulent material to be deposited within said receptacle means wherein said metering means maintains a substantially constant volume of pulverulent material in said receptacle means; continuously agitating said pulverulent material within said receptacle means to homogenize said material and to prevent said material from compacting therein; continuously metering a precise reproducible quantity of said pulverulent material into movable groove means forming the bottom of said receptacle means; and aspirating into a carrier gas said constant and precise quantity of said uncompacted pulverulent material from said groove means through pipe means for later distribution at a constant flow upon a substrate.
Claim 15
Dependent Claim 17 words
The process of claim 10 wherein said disagglomeration step is performed by vibrating said moveable groove means.
Claim 16
Dependent Claim 18 words
The process of claim 10 wherein the feeding of said pulverulent material is accomplished by Archimedes screw means.
Claim 17
Dependent Claim 36 words
The process of claim 12 wherein the operation of the screw means is controlled by said metering means to obtain the desired flow of pulverulent material into said receptacle means to achieve a constant level therein.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-12-06 1992-06-06 1992-12-06 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-12-06 1996-06-06 1996-12-06 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-12-06 2000-06-06 2000-12-06 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag