Patent US4787452A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4787452A Expired / Lapsed US ⏱️ 0.0 years remaining

Disposal of produced formation fines during oil recovery

Assignee: Mobil Oil AS
•
Filing: 1987-06-08
•
Granted: 1988-11-29
•
Expires: 2007-06-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Recovered formation fines are pumped in slurry form into an injection well during an enhanced oil recovery process e.g. a steam flood. Said injection can be done incrementally in stages in conjunction with said process. Said fines improve the sweep efficiency of the injected medium. This method is also beneficial where steam breakthrough has occurred since the breakthrough path is in a fluid or semi-solid state thereby allowing the fines slurry to be injected.

Inventors

  • 👤 Alfred R. Jennings, Jr.

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 20:05
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/10; E21B33/13; E21B33/138; E21B41/00; E21B41/005; E21B41/0057; E21B43/00; E21B43/16; E21B43/164; E21B43/24; E21B43/34; E21B43/35; E21B43/40

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 103 words
A method for disposing of fines recovered during the production of hydrocarbonaceous fluids from a formation comprising: (a) making an aqueous saline slurry from said recovered fines; (b) injecting incrementally said slurry into a formation via at least one wellbore at a rate and velocity sufficient to close pores in said formation without fracturing said formation where a slug containing a higher concentration of fines in the slurry follows a slug of lower fines concentration; and (c) decreasing the injection rate and velocity of said slurry thereby causing said fines to settle and close at least one more permeable zone in said formation.
Claim 2
Independent Claim 103 words
A method for disposing of fines recovered during the production of hydrocarbonaceous fluids from a formation comprising: (a) making an aqueous saline slurry from said recovered fines; (b) injecting incrementally said slurry into a formation via at least one wellbore at a rate and velocity sufficient to close pores in said formation without fracturing said formation where a slug containing a higher concentration of fines in the slurry follows a slug of lower fines concentration; and (c) decreasing the injection rate and velocity of said slurry thereby causing said fines to settle and close at least one more permeable zone in said formation.
Claim 3
Dependent Claim 24 words
The method as recited in claim 1 where at least one injector well is utilized which well can also serve as a producer well.
Claim 4
Dependent Claim 21 words
The method as recited in claim 1 where steam breakthrough has occurred in said formation to produce a more permeable zone.
Claim 5
Dependent Claim 30 words
The method as recited in claim 1 where an enhanced oil recovery operation comprising a water flood, a steam flood, or carbon dioxide flood is utilized subsequent to step (c).
Claim 6
Independent Claim 119 words
A method for improving the sweep efficiency of an enhanced oil recovery operation comprising: (a) making an aqueous slurry from fines recovered from hydrocarbonaceous fluids produced from a formation; (b) directing incrementally said slurry into said formation via at least one wellbore at a rate and pressure below that required to fracture said formation but which is sufficient to cause fines to close at least one previously swept area in said formation where a slug containing a higher concentration of fines in the slurry follows a slug of lower fines concentration; and (c) decreasing the injection rate and velocity of said slurry thereby causing said fines to settle and close at least one previously swept zone in said formation.
Claim 7
Independent Claim 119 words
A method for improving the sweep efficiency of an enhanced oil recovery operation comprising: (a) making an aqueous slurry from fines recovered from hydrocarbonaceous fluids produced from a formation; (b) directing incrementally said slurry into said formation via at least one wellbore at a rate and pressure below that required to fracture said formation but which is sufficient to cause fines to close at least one previously swept area in said formation where a slug containing a higher concentration of fines in the slurry follows a slug of lower fines concentration; and (c) decreasing the injection rate and velocity of said slurry thereby causing said fines to settle and close at least one previously swept zone in said formation.
Claim 8
Dependent Claim 30 words
The method as recited in claim 5 where said slurry is directed into said formation by at least one injector well which well can also serve as a producer well.
Claim 9
Dependent Claim 24 words
The method as recited in claim 1 wherein said enhanced oil recovery operation comprises a waterflood, a steam flood, or a carbon dioxide flood.
Claim 10
Dependent Claim 26 words
The method as recited in claim 5 where in step (b) said previously swept zone results from gravity override during a carbon dioxide oil recovery method.
Claim 11
Dependent Claim 26 words
The method as recited in claim 5 where in step (b) said previously swept zone results from steam breakthrough during a steam flood oil recovery operation.
Claim 12
Dependent Claim 35 words
The method as recited in claim 5 where in step (b) said previously swept zone results from said formation having at least one zone of greater permeability and at least one zone of lesser permeability.
Claim 13
Dependent Claim 30 words
The method as recited in claim 5 where said slurried fines followed by a spacer volume of saline solution are injected into the formation intermittently and the pressure is released.
Claim 14
Dependent Claim 28 words
The method as recited in claim 5 where the critical fluid flow velocity of said fines is exceeded which allows said fines to migrate deeply into the formation.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-11-29 1992-05-30 1992-11-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-11-29 1996-05-30 1996-11-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-11-29 2000-05-30 2000-11-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag