Patent US4785600A successfully refreshed from Google Patents.
US4785600A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Buildup composite beam structure
Assignee: Individual
•
Filing: 1988-02-16
•
Granted: 1988-11-22
•
Expires: 2008-02-16
Abstract
Abstract This invention relates to the construction of a composite beam structure in a composite steel deck floor system. A T-shaped beam is welded through the valleys of the steel deck onto the top flange of the supporting beam. After concrete pouring, the T-beam is buried within the concrete slab to act as the shear transferring device to achieve the composite beam action. The T-beam also serves to strengthen the supporting beam in resisting the load during the concreting operation and to facilitate the placement of the concrete shrinkage control wire mesh.
Inventors
- 👤 Raymond M. L. Ting
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 20:17
CPC Classifications
E; E04; E04C; E04C3/00; E04C3/02; E04C3/04; E04C3/08; E04C3/083; E04C3/086; E04B; E04B5/00; E04B5/16; E04B5/17; E04B5/23; E04B5/29; E04B5/32; E04B5/36; E04B5/38; E04B5/40
Claims Analysis
Total Claims: 4
Claim 1
Independent Claim
212 words
In a building floor structure having horizontal steel beams, steel decks supported on said steel beams, a concrete floor covering with shrinkage control wire mesh thereabove, and shear transferring devices enabling said steel beams to coact compositely with said concrete floor, each of said steel beams having a top flange, a vertical web, and a bottom flange, said steel decks having corrugations consisting of alternating ridges and valleys, said steel decks spanning between said steel beams and secured to said top flanges of said steel beams at said valleys, the improvements in the floor structure comprising: said shear transferring device being connected to said top flange of said steel beam by welding through said steel decks and embedded in said concrete floor and comprising: (a) a vertical element substantially parallel to said web of said steel beam and having a height greater than the height of said steel decks and extending into said valleys with clearance notches around said ridges and making contact with said steel decks. (b) a continuous horizontal element having a linear axis substantially parallel to the longitudinal axis of said steel beam and extending laterally away from said vertical element and above said steel decks. (c) said vertical element (a) being integrally connected with said horizontal element (b).
Claim 2
Dependent Claim
212 words
In a building floor structure having horizontal steel beams, steel decks supported on said steel beams, a concrete floor covering with shrinkage control wire mesh thereabove, and shear transferring devices enabling said steel beams to coact compositely with said concrete floor, each of said steel beams having a top flange, a vertical web, and a bottom flange, said steel decks having corrugations consisting of alternating ridges and valleys, said steel decks spanning between said steel beams and secured to said top flanges of said steel beams at said valleys, the improvements in the floor structure comprising: said shear transferring device being connected to said top flange of said steel beam by welding through said steel decks and embedded in said concrete floor and comprising: (a) a vertical element substantially parallel to said web of said steel beam and having a height greater than the height of said steel decks and extending into said valleys with clearance notches around said ridges and making contact with said steel decks. (b) a continuous horizontal element having a linear axis substantially parallel to the longitudinal axis of said steel beam and extending laterally away from said vertical element and above said steel decks. (c) said vertical element (a) being integrally connected with said horizontal element (b).
Claim 3
Dependent Claim
26 words
The improvement of claim 1 wherein said shrinkage control wire mesh being supported on said horizontal element and secured in position by spaced apart tack welds.
Claim 4
Dependent Claim
84 words
In a building floor structure of claim 1; the method comprising securing steel decks to said top flanges of said steel beams, welding said shear transferring devices at said valleys through said steel decks onto said top flanges of said steel beams, laying said wire mesh on said horizontal elements of said shear transferring devices, securing said wire mesh to said horizontal element by spaced apart tack welds, and pouring concrete on said steel decks burying said shear transferring devices and said wire mesh.
References Cited (Backward Citations)
US1768626A
Cited
US2340176A
Cited
US2636377A
Cited
US3110049A
Cited
US3251167A
Cited
US3282017A
Cited
US3300932A
Cited
US3385015A
Cited
US3527007A
Cited
US3596421A
Cited
US4333280A
Cited
US4729201A
Cited
US4653237A
Cited
US4741138A
Cited
US4646493A
Cited
US4716695A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1991-11-22 | 1992-05-23 | 1992-11-22 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1995-11-22 | 1996-05-23 | 1996-11-22 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1999-11-22 | 2000-05-23 | 2000-11-22 | $7700.00 | Window Closed / Lapsed |