Buildup composite beam structure

Assignee: Individual
•
Filing: 1988-02-16
•
Granted: 1988-11-22
•
Expires: 2008-02-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract This invention relates to the construction of a composite beam structure in a composite steel deck floor system. A T-shaped beam is welded through the valleys of the steel deck onto the top flange of the supporting beam. After concrete pouring, the T-beam is buried within the concrete slab to act as the shear transferring device to achieve the composite beam action. The T-beam also serves to strengthen the supporting beam in resisting the load during the concreting operation and to facilitate the placement of the concrete shrinkage control wire mesh.

Inventors

  • 👤 Raymond M. L. Ting

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 20:02
CPC Classifications
E; E04; E04C; E04C3/00; E04C3/02; E04C3/04; E04C3/08; E04C3/083; E04C3/086; E04B; E04B5/00; E04B5/16; E04B5/17; E04B5/23; E04B5/29; E04B5/32; E04B5/36; E04B5/38; E04B5/40

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 212 words
In a building floor structure having horizontal steel beams, steel decks supported on said steel beams, a concrete floor covering with shrinkage control wire mesh thereabove, and shear transferring devices enabling said steel beams to coact compositely with said concrete floor, each of said steel beams having a top flange, a vertical web, and a bottom flange, said steel decks having corrugations consisting of alternating ridges and valleys, said steel decks spanning between said steel beams and secured to said top flanges of said steel beams at said valleys, the improvements in the floor structure comprising: said shear transferring device being connected to said top flange of said steel beam by welding through said steel decks and embedded in said concrete floor and comprising: (a) a vertical element substantially parallel to said web of said steel beam and having a height greater than the height of said steel decks and extending into said valleys with clearance notches around said ridges and making contact with said steel decks. (b) a continuous horizontal element having a linear axis substantially parallel to the longitudinal axis of said steel beam and extending laterally away from said vertical element and above said steel decks. (c) said vertical element (a) being integrally connected with said horizontal element (b).
Claim 2
Dependent Claim 212 words
In a building floor structure having horizontal steel beams, steel decks supported on said steel beams, a concrete floor covering with shrinkage control wire mesh thereabove, and shear transferring devices enabling said steel beams to coact compositely with said concrete floor, each of said steel beams having a top flange, a vertical web, and a bottom flange, said steel decks having corrugations consisting of alternating ridges and valleys, said steel decks spanning between said steel beams and secured to said top flanges of said steel beams at said valleys, the improvements in the floor structure comprising: said shear transferring device being connected to said top flange of said steel beam by welding through said steel decks and embedded in said concrete floor and comprising: (a) a vertical element substantially parallel to said web of said steel beam and having a height greater than the height of said steel decks and extending into said valleys with clearance notches around said ridges and making contact with said steel decks. (b) a continuous horizontal element having a linear axis substantially parallel to the longitudinal axis of said steel beam and extending laterally away from said vertical element and above said steel decks. (c) said vertical element (a) being integrally connected with said horizontal element (b).
Claim 3
Dependent Claim 26 words
The improvement of claim 1 wherein said shrinkage control wire mesh being supported on said horizontal element and secured in position by spaced apart tack welds.
Claim 4
Dependent Claim 84 words
In a building floor structure of claim 1; the method comprising securing steel decks to said top flanges of said steel beams, welding said shear transferring devices at said valleys through said steel decks onto said top flanges of said steel beams, laying said wire mesh on said horizontal elements of said shear transferring devices, securing said wire mesh to said horizontal element by spaced apart tack welds, and pouring concrete on said steel decks burying said shear transferring devices and said wire mesh.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-11-22 1992-05-23 1992-11-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-11-22 1996-05-23 1996-11-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-11-22 2000-05-23 2000-11-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag