Patent US4773195A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4773195A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for forming a sluiceway adjacent a wall and cement floor

Assignee: Individual
•
Filing: 1986-10-02
•
Granted: 1988-09-27
•
Expires: 2006-10-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method and related apparatus for forming a sluiceway adjacent a wall and cement floor includes a sluiceway form made from a generally rectangular sheet of biodegradable material having a number of generally parallel fold lines to define a plurality of contiguous sluiceway panels disposed inwardly of opposite marginal portions of the sheet which are folded into face-to-face relation with each other to form an elongated sluiceway form having a body portion defined by the sluiceway panels and a tab defined by the marginal portions projecting from the body portion and extending along the entire length of the body portion. The sluiceway is formed by positioning the sluiceway form adjacent the wall with at least a part of the body portion below the level of the grade and the free edge of the tab extending in a generally parallel relation to the grade level. The tab is secured to the wall and the concrete floor is poured with the sluiceway form in position. The sluiceway form may be removed or left in place to disintegrate.

Inventors

  • 👤 Harvey Waller

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 21:22
CPC Classifications
E; E04; E04B; E04B1/00; E04B1/0023

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 216 words
A method for making a concrete basement structure or the like having a wall, a floor, and a sluiceway formed in the structure, said method comprising the steps of: folding a generally rectangular sheet of biodegradable material along generally parallel fold lines to define a plurality of contiguous sluiceway panels disposed inwardly of opposite marginal portions of the sheet; folding the sheet to bring said opposite marginal portions into face-to-face relation with each other to form an elongated sluiceway form having a sluiceway body portion defined by said sluiceway panels and a tabl defined by said marginal portions projecting from said sluiceway body portion and extending along the entire length of said sluiceway body portion, said tab having a free edge generally parallel to and extending the length of said body portion; positioning said sluiceway form adjacent said wall with at least part of said body portion below the grade level of said concrete floor grade and said free edge of said tab extending in generally parallel relation to said grade level; securing said tab to said wall; pouring said concrete floor with said sluiceway form in position adjacnet said wall, and disintegrating said sluiceway form material to permit said sluiceway formed adjacent said wall and floor to collect and carry away water entering said sluiceway.
Claim 2
Independent Claim 216 words
A method for making a concrete basement structure or the like having a wall, a floor, and a sluiceway formed in the structure, said method comprising the steps of: folding a generally rectangular sheet of biodegradable material along generally parallel fold lines to define a plurality of contiguous sluiceway panels disposed inwardly of opposite marginal portions of the sheet; folding the sheet to bring said opposite marginal portions into face-to-face relation with each other to form an elongated sluiceway form having a sluiceway body portion defined by said sluiceway panels and a tabl defined by said marginal portions projecting from said sluiceway body portion and extending along the entire length of said sluiceway body portion, said tab having a free edge generally parallel to and extending the length of said body portion; positioning said sluiceway form adjacent said wall with at least part of said body portion below the grade level of said concrete floor grade and said free edge of said tab extending in generally parallel relation to said grade level; securing said tab to said wall; pouring said concrete floor with said sluiceway form in position adjacnet said wall, and disintegrating said sluiceway form material to permit said sluiceway formed adjacent said wall and floor to collect and carry away water entering said sluiceway.
Claim 3
Dependent Claim 33 words
The method of claim 1 further including the step of positioning any number of sluiceway forms in an end-to-end, lengthwise fashion to produce an elongated sluiceway form of any desired length and configuration.
Claim 4
Dependent Claim 44 words
The method of claim 1 wherein the steps of positioning said sluiceway form adjacent said wall includes the step of positioning said body portion entirely below the level of said grade and said free edge of said tab above the level of said grade.
Claim 5
Dependent Claim 45 words
The method of claim 3 further including the step of removing said tab positioned between said wall and said concrete floor to provide a means of communication between the surface of the concrete floor and the sluiceway formed below said grade of said concrete floor.
Claim 6
Dependent Claim 26 words
The method of claim 1 wherein the step of securing said sluiceway tab to said wall includes the step of nailing said tab to said wall.
Claim 7
Dependent Claim 24 words
The method of claim 1 further including the step of providing a sump drain below said sluiceway and in intersecting relation with said sluiceway.
Claim 8
Dependent Claim 31 words
The method of claim 1 wherein the step of folding the sheet material along parallel fold lines further includes the step of weakening the biodegradable material coincident with the fold lines.
Claim 9
Dependent Claim 270 words
In combination with a wall and a cement floor, a sluiceway form adjacent to said wall at grade level wherin said cement floor is poured with said sluiceway form in position, said sluiceway form comprising: a generally rectangular sheet of biodegradable material having a number of generally parallel fold lines to define a plurality of contiguous sluiceway panels, said sheet material having a thickness, a first surface and a second surface disposed opposite said first surface, said panels being substantially free of openings extending through the thickness of the sheet material and between said first and second surfaces; a first opposite marginal panel being at least twice the width of the other sluiceway panels; said sluiceway panels disposed inwardly of opposite marginal panels, said first marginal panel integrally connected to a second panel along a first fold line, said first marginal panel folded along said first fold line into a vertical relation with said second panel; said second panel integrally connected to a third panel along a second fold line, said third panel folded along said second fold line into a vertical relation with said second panel; said third panel integrally connected to a fourth panel along a third fold line, said fourth panel folded along said third fold line into a horizontal relation with said third panel and a parallel relation with said second panel, and said fourth panel integrally connected with a second marginal panel along a fourth fold line, said second marginal panel folded along said fourth fold line into a vertical relation with said fourth panel and into a face-to-face relation with said first marginal panel.
Claim 10
Dependent Claim 270 words
In combination with a wall and a cement floor, a sluiceway form adjacent to said wall at grade level wherin said cement floor is poured with said sluiceway form in position, said sluiceway form comprising: a generally rectangular sheet of biodegradable material having a number of generally parallel fold lines to define a plurality of contiguous sluiceway panels, said sheet material having a thickness, a first surface and a second surface disposed opposite said first surface, said panels being substantially free of openings extending through the thickness of the sheet material and between said first and second surfaces; a first opposite marginal panel being at least twice the width of the other sluiceway panels; said sluiceway panels disposed inwardly of opposite marginal panels, said first marginal panel integrally connected to a second panel along a first fold line, said first marginal panel folded along said first fold line into a vertical relation with said second panel; said second panel integrally connected to a third panel along a second fold line, said third panel folded along said second fold line into a vertical relation with said second panel; said third panel integrally connected to a fourth panel along a third fold line, said fourth panel folded along said third fold line into a horizontal relation with said third panel and a parallel relation with said second panel, and said fourth panel integrally connected with a second marginal panel along a fourth fold line, said second marginal panel folded along said fourth fold line into a vertical relation with said fourth panel and into a face-to-face relation with said first marginal panel.
Claim 11
Dependent Claim 50 words
The method of claim 4 further characterized in that the step of removing said tab to provide a means of communication between said wall and said concrete floor includes providing a gap having a lateral dimension substantially smaller than the lateral dimension of said body portion of said sluiceway form.
Claim 12
Independent Claim 304 words
A method for making a concrete basement structure or the like having a wall, a floor, and a sluiceway formed in the strcuture below the grade level of said concrete floor, said method comprising the steps of: folding a generally rectangular sheet of corrugated cardboard along generally parallel fold lines to define a plurality of contiguous sluiceway panels disposed inwardly of opposite marginal portions of the sheet; folding the sheet to bring said opposite marginal portions into face-to-face relation with each other to form an elongated sluiceway form having a sluiceway body portion defined by said sluiceway panels and a tab defined by said marginal portions projecting from said sluiceway body portion and extending along the entire length of said sluiceway body portion, said tab having a free edge generally parallel to and extending the length of said body portion; positioning said sluiceway form adjacent said wall with said body portion below the grade level of said concrete floor and said free edge of said tab above said grade level, said free edge of said tab extending in generally parallel relation to said grade level; securing said tab to said wall; pouring said concrete floor with said sluiceway form in position adjacent said wall; removing said tab positioned between said wall and said concrete floor to provide a means of communication between the surface of said concrete floor and said sluiceway formed below said grade level of said concrete floor, wherein said step of removing said tab includes providing a gap between said wall and said concrete floor, said gap having a lateral dimension substantially smaller than the lateral dimension of said body portion of said sluiceway form, and disintegrating said corrugated cardboard sluiceway form to permit said sluiceway formed adjacent said wall and floor to collect and carry away water entering said sluiceway.
Claim 13
Independent Claim 304 words
A method for making a concrete basement structure or the like having a wall, a floor, and a sluiceway formed in the strcuture below the grade level of said concrete floor, said method comprising the steps of: folding a generally rectangular sheet of corrugated cardboard along generally parallel fold lines to define a plurality of contiguous sluiceway panels disposed inwardly of opposite marginal portions of the sheet; folding the sheet to bring said opposite marginal portions into face-to-face relation with each other to form an elongated sluiceway form having a sluiceway body portion defined by said sluiceway panels and a tab defined by said marginal portions projecting from said sluiceway body portion and extending along the entire length of said sluiceway body portion, said tab having a free edge generally parallel to and extending the length of said body portion; positioning said sluiceway form adjacent said wall with said body portion below the grade level of said concrete floor and said free edge of said tab above said grade level, said free edge of said tab extending in generally parallel relation to said grade level; securing said tab to said wall; pouring said concrete floor with said sluiceway form in position adjacent said wall; removing said tab positioned between said wall and said concrete floor to provide a means of communication between the surface of said concrete floor and said sluiceway formed below said grade level of said concrete floor, wherein said step of removing said tab includes providing a gap between said wall and said concrete floor, said gap having a lateral dimension substantially smaller than the lateral dimension of said body portion of said sluiceway form, and disintegrating said corrugated cardboard sluiceway form to permit said sluiceway formed adjacent said wall and floor to collect and carry away water entering said sluiceway.

References Cited (Backward Citations)

US3017722A Cited
US3852925A Cited
US4185429A Cited
US4245443A Cited
US4538386A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-09-27 1992-03-28 1992-09-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-09-27 1996-03-28 1996-09-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-09-27 2000-03-28 2000-09-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag