← Back to Patent Explorer
US4759408A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of shutting off a portion of a producing zone in a hydrocarbon producing well

Assignee: Texaco Development Corp
•
Filing: 1987-06-08
•
Granted: 1988-07-26
•
Expires: 2007-06-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Disclosed is an invention for shutting off a portion of a producing zone such as a steam override zone in a hydrocarbon producing wellbore. The bottom of the wellbore is filled with a material such as sand up to the bottom of the steam override zone. A pipe is placed and centralized in the middle of the wellbore so that the pipe extends throughout the steam override zone. A cement plug is placed around the centralized pipe while keeping the interior of the pipe free of cement. A larger cylindrical hole is then drilled through the cement plug by using the centralized pipe to center and guide a drill through the middle of the cement plug.

Inventors

  • 👤 Steven M. Buchanan

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 00:55
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/10; E21B33/13; E21B33/138; E21B33/14; E21B43/00; E21B43/02; E21B43/04

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 179 words
A method of shutting off a portion of a producing zone in a hydrocarbon producing wellbore which comprises: pulling the existing production liner; filling up the bottom of the producing wellbore to the level of the bottom of the producing zone desired to be shut off with a non-formation-damaging material which insulates a portion of the producing zone from being shut off and which can be removed from the wellbore; placing and centralizing a pipe in the middle of the wellbore so that the pipe extends through the portion of the producing zone desired to be shut off; forming a cement plug with a cylindrical hole throughout the portion of the producing zone desired to be shut off by cementing the centralized pipe to the wellbore while keeping the interior of the pipe free of cement; drilling a cylindrical hole through the cement plug and drilling out the pipe therein by using the pipe therein to center and guide the drill through the middle of the cement plug; and removing the non-formation-damaging material from the bottom of the wellbore.
Claim 2
Independent Claim 179 words
A method of shutting off a portion of a producing zone in a hydrocarbon producing wellbore which comprises: pulling the existing production liner; filling up the bottom of the producing wellbore to the level of the bottom of the producing zone desired to be shut off with a non-formation-damaging material which insulates a portion of the producing zone from being shut off and which can be removed from the wellbore; placing and centralizing a pipe in the middle of the wellbore so that the pipe extends through the portion of the producing zone desired to be shut off; forming a cement plug with a cylindrical hole throughout the portion of the producing zone desired to be shut off by cementing the centralized pipe to the wellbore while keeping the interior of the pipe free of cement; drilling a cylindrical hole through the cement plug and drilling out the pipe therein by using the pipe therein to center and guide the drill through the middle of the cement plug; and removing the non-formation-damaging material from the bottom of the wellbore.
Claim 3
Dependent Claim 13 words
The method of claim 1, wherein a steam override zone is shut off.
Claim 4
Dependent Claim 15 words
The method of claim 1, wherein the non-formation-damaging material is sand, gravel or oyster shells.
Claim 5
Dependent Claim 31 words
The method of claim 1, further comprising enlarging the wellbore in the portion of the producing zone desired to be shut off prior to centralizing and cementing the pipe in place.
Claim 6
Dependent Claim 19 words
The method of claim 1, wherein the centralized pipe is composed of fiberglass, plastic, aluminum or thin wall steel.
Claim 7
Dependent Claim 22 words
The method of claim 1, further comprising using centralizers to centralize the pipe in the wellbore prior to forming the cement plug.
Claim 8
Dependent Claim 18 words
The method of claim 1, wherein the centralizers are composed of fiberglass, plastic, aluminum or thin wall steel.
Claim 9
Dependent Claim 23 words
The method of claim 1, further comprising the use of a pilot nosed underreamer to drill the cylindrical hole through the cement plug.
Claim 10
Dependent Claim 30 words
The method of claim 8, wherein the pilot nosed underreamer has a pilot nose with an exterior diameter similar to and smaller than the interior diameter of the centralized pipe.
Claim 11
Dependent Claim 24 words
The method of claim 1, further comprising using a completion fluid inside the centralized pipe to balance cementing and formation pressures on the pipe.
Claim 12
Dependent Claim 34 words
The method of claim 1, further comprising placing a gravel pack and production liner in the remaining portion of the producing zone of the wellbore after the non-formation-damaging material is removed from the wellbore.
Claim 13
Independent Claim 192 words
A method of shutting off a steam override zone in a hydrocarbon producing wellbore, which comprises: pulling the existing production liner; enlarging the wellbore in the steam override zone; filling up the bottom of the wellbore to the level of the bottom of the steam override zone with sand; placing and centralizing a pipe having a selected inside diameter in the middle of the wellbore so that the pipe extends throughout the steam override zone; using a completion fluid inside the centralized pipe to balance cementing and formation pressures; forming a cement plug with a cylindrical hole throughout the steam override zone by cementing the centralized pipe to the enlarged wellbore in the steam override zone while keeping the interior of the pipe free of cement; drilling a cylindrical hole through the plug and drilling out the pipe therein by using a pilot nosed underreamer which is guided and centered by the pipe within the cement plug, said pilot nosed underreamer having a pilot nose with an exterior diameter similar to and smaller than the selected inside diameter of the centralized pipe; and removing the sand from the bottom of the wellbore.
Claim 14
Independent Claim 192 words
A method of shutting off a steam override zone in a hydrocarbon producing wellbore, which comprises: pulling the existing production liner; enlarging the wellbore in the steam override zone; filling up the bottom of the wellbore to the level of the bottom of the steam override zone with sand; placing and centralizing a pipe having a selected inside diameter in the middle of the wellbore so that the pipe extends throughout the steam override zone; using a completion fluid inside the centralized pipe to balance cementing and formation pressures; forming a cement plug with a cylindrical hole throughout the steam override zone by cementing the centralized pipe to the enlarged wellbore in the steam override zone while keeping the interior of the pipe free of cement; drilling a cylindrical hole through the plug and drilling out the pipe therein by using a pilot nosed underreamer which is guided and centered by the pipe within the cement plug, said pilot nosed underreamer having a pilot nose with an exterior diameter similar to and smaller than the selected inside diameter of the centralized pipe; and removing the sand from the bottom of the wellbore.
Claim 15
Dependent Claim 29 words
The method of claim 12, further comprising placing a gravel pack and production liner below the shut off steam override zone after the sand is removed from the wellbore.

References Cited (Backward Citations)

US3277962A Cited
US3368623A Cited
US3682244A Cited
US3709298A Cited
US4034811A Cited
US4157116A Cited
US4274487A Cited
US4378843A Cited
US4589490A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-07-26 1992-01-25 1992-07-26 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-07-26 1996-01-25 1996-07-26 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-07-26 2000-01-25 2000-07-26 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag