Method for completion of wells
Assignee: CTC International Corp
•
Filing: 1981-02-11
•
Granted: 1983-04-05
•
Expires: 2001-02-11
Abstract
Abstract A method of completing wells comprising: an inflatable packer used to plug the borehole below the producing formations; casing being run from the surface to a point above the producing formation; the casing annulus being sealed off above the producing formation; the producing formation being underreamed and gravel packed to improve productivity. Sealing of the casing annulus may be accomplished by conventional well cement or by a second inflatable packer. The inflatable packers used are inflated with fast hardening well cement which is retained in the packer annulus by means of a check valve so as to effect an immediate seal and anchor which is maintained during and after hardening of the cement.
Inventors
- 👤 George O. Suman, Jr.
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-04 23:41
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/10; E21B33/13; E21B33/12; E21B33/127; E21B33/134; E21B43/00; E21B43/02; E21B43/04
Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
242 words
In a well having an open borehole with a formation which is to be isolated from a lower portion of open borehole, the method comprising: running a string of pipe into the open borehole with an inflatable packer releasably attached to the lower end of the string; positioning the packer at a desired depth below said formation to be isolated; the packer having a radially expansible resilient sleeve sealingly connected at its ends to an interior mandrel and having passage means for permitting flow of fluid to the exterior of the mandrel into the interior of the sleeve; preventing flow through the mandrel into the open borehole below said packer prior to passing cement through the pipe; then passing cement down through the pipe string and into the mandrel with flow into the open borehole therebelow prevented through said passage means into said sleeve in an amount and under a pressure sufficient to expand the sleeve in an amount and under a pressure sufficient to expand the sleeve outwardly into tight gripping engagement with the wall of the borehole to anchor the packer to the wall of the borehole above said open borehole; and permitting the cement within the sleeve to set, and detaching the running string from the packer and removing the running string of pipe from the borehole leaving the packer in position therein to act as a plug to isolate said formation from the open borehole below the packer.
Claim 2
Dependent Claim
242 words
In a well having an open borehole with a formation which is to be isolated from a lower portion of open borehole, the method comprising: running a string of pipe into the open borehole with an inflatable packer releasably attached to the lower end of the string; positioning the packer at a desired depth below said formation to be isolated; the packer having a radially expansible resilient sleeve sealingly connected at its ends to an interior mandrel and having passage means for permitting flow of fluid to the exterior of the mandrel into the interior of the sleeve; preventing flow through the mandrel into the open borehole below said packer prior to passing cement through the pipe; then passing cement down through the pipe string and into the mandrel with flow into the open borehole therebelow prevented through said passage means into said sleeve in an amount and under a pressure sufficient to expand the sleeve in an amount and under a pressure sufficient to expand the sleeve outwardly into tight gripping engagement with the wall of the borehole to anchor the packer to the wall of the borehole above said open borehole; and permitting the cement within the sleeve to set, and detaching the running string from the packer and removing the running string of pipe from the borehole leaving the packer in position therein to act as a plug to isolate said formation from the open borehole below the packer.
Claim 3
Dependent Claim
41 words
The method of claim 1 including: running a string of casing into the borehole and positioning the lower end of the casing at said formation; cementing at least the lower portion of the casing to the borehole; and producing said formation.
Claim 4
Dependent Claim
19 words
The method of claim 2 including: underreaming said formation at a level below the lower end of the casing.
Claim 5
Dependent Claim
16 words
The method of claim 3 including: gravel packing at least the underreamed portion of the formation.
Claim 6
Dependent Claim
134 words
The method of claim 1 including: running a string of casing into the borehole with a second inflatable packer connected thereto; the second packer having a radially expansible resilient sleeve connected at its ends to an interior mandrel and having passage means for permitting flow of fluid from the interior of the mandrel into the interior of the sleeve; positioning the second packer in the borehole above the formation previously isolated by the first inflatable packer; preventing the flow of fluid through said mandrel below said second packer prior to passing cement through said casing; passing cement down the casing through said passage means into said sleeve in an amount and at a pressure sufficient to expand the sleeve outwardly into tight gripping engagement with the wall of the borehole; and producing said formation.
Claim 7
Dependent Claim
21 words
The method of claim 5 including: underreaming said formation at a level below said casing and the inflatable packer connected thereto.
Claim 8
Dependent Claim
16 words
The method of claim 6 including: gravel packing at least the underreamed portion of the formation.
Claim 9
Dependent Claim
124 words
The method as claimed in claim 1, including the further steps of: running a string of casing into the borehole with a second inflatable packer connected adjacent the lower end thereof; positioning the inflatable packer in the borehole above the formation previously isolated by the first inflatable packer; initially preventing the flow of fluid to inflate said second inflatable packer; circulating cement down said casing and at least a portion of the way up the annulus between the casing and the borehole; preventing the flow of cement out of said casing below said packer and allowing the flow of fluid to inflate said second packer; and inflating said second packer with cement to expand said second packer into tight gripping engagement with said borehole.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1986-04-04 | 1986-10-04 | 1987-04-05 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1990-04-04 | 1990-10-04 | 1991-04-05 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1994-04-04 | 1994-10-04 | 1995-04-05 | $7700.00 | Window Closed / Lapsed |