Abstract

Abstract To prepare an existing buried main made from a material which is tough at ambient temperature for replacement by a new main of the same or a larger size via a mole device by fracturing the existing main by compressive and impact forces and by widening the bore for the insertion of the new main that is clamped to the mole device, a liquefied gas having as low a boiling point as possible at atmospheric pressure is sprayed against the conduit wall from a cooling carriage that is pulled through the existing main prior to the movement of the mole device therethrough, thereby cooling the existing main to a temperature causing low-temperature embrittlement of the material of the existing main.

Inventors

  • 👤 Laszlo Masznyik

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 19:53
CPC Classifications
E; E21; E21B; E21B7/00; E21B7/20; E21B7/205; E21B29/00; E21B7/28; E21B7/30; F; F16; F16L; F16L55/00; F16L55/16; F16L55/162; F16L55/165; F16L55/1658; F16L55/18; Y; Y10; Y10T; Y10T225/00; Y10T225/30; Y10T225/304; Y10T225/371

Claims Analysis

Total Claims: 25
Claim 1
Independent Claim 150 words
A method of preparing an existing underground conduit for replacement by a new conduit, said method including the steps of moving a mole device through the existing conduit, fracturing the latter from within with said mole device via compressive and impact forces, and widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device, said method further comprising the steps of: prior to said step of moving said mole device through said existing conduit, moving a cooling carriage through said existing conduit; and spraying liquefied gas from said cooling carriage onto the wall of said existing conduit over the length of the conduit to cool the latter to a temperature that causes lowtemperature embrittlement of the material of said existing conduit, with said liquefied gas having a boiling point that is as low as possible at atmospheric pressure.
Claim 2
Independent Claim 150 words
A method of preparing an existing underground conduit for replacement by a new conduit, said method including the steps of moving a mole device through the existing conduit, fracturing the latter from within with said mole device via compressive and impact forces, and widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device, said method further comprising the steps of: prior to said step of moving said mole device through said existing conduit, moving a cooling carriage through said existing conduit; and spraying liquefied gas from said cooling carriage onto the wall of said existing conduit over the length of the conduit to cool the latter to a temperature that causes lowtemperature embrittlement of the material of said existing conduit, with said liquefied gas having a boiling point that is as low as possible at atmospheric pressure.
Claim 3
Dependent Claim 18 words
A method according to claim 1, which includes the step of providing liquid nitrogen as said liquefied gas.
Claim 4
Dependent Claim 141 words
A method according to claim 1, which includes the further steps of: providing a shield between said cooling carriage and the wall of said existing conduit; carrying out said step of spraying liquefied gas ahead of said shield when viewed in the direction of travel of said cooling carriage through said existing conduit; withdrawing said liquefied gas from said existing conduit ahead of said shield; measuring the temperature of the wall of said existing conduit behind said shield; and as a function of such measured temperature that is influenced by cooling carriage speed and quantity of liquefied gas that is to be sprayed in, accordingly controlling at least one of the cooling carriage speed and the quantity of liquefied gas that is to be sprayed in, said controlling thereof occurring so that the measured temperature corresponds to desired conduit wall temperature.
Claim 5
Independent Claim 151 words
A device for preparing an existing underground conduit for replacement by a new conduit, comprising: a cooling carriage that is adapted for movement through said existing conduit, with said cooling carriage being connected via a supply line to a tank for receiving therefrom liquefied gas that has a boiling point that is as low as possible at atmospheric pressure; spray nozzles provided on said cooling carriage in a substantially radial arrangement for spraying said liquefied gas onto the wall of said existing conduit, from within, over the entire inner periphery of said existing conduit over the length of the conduit; and a mole device for movement through said existing conduit, after said cooling carriage, for fracturing said existing conduit from within with compressive and impact forces, and for widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device.
Claim 6
Independent Claim 151 words
A device for preparing an existing underground conduit for replacement by a new conduit, comprising: a cooling carriage that is adapted for movement through said existing conduit, with said cooling carriage being connected via a supply line to a tank for receiving therefrom liquefied gas that has a boiling point that is as low as possible at atmospheric pressure; spray nozzles provided on said cooling carriage in a substantially radial arrangement for spraying said liquefied gas onto the wall of said existing conduit, from within, over the entire inner periphery of said existing conduit over the length of the conduit; and a mole device for movement through said existing conduit, after said cooling carriage, for fracturing said existing conduit from within with compressive and impact forces, and for widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device.
Claim 7
Dependent Claim 14 words
A device according to claim 4, in which said liquefied gas is liquid nitrogen.
Claim 8
Dependent Claim 45 words
A device according to claim 4, in which said cooling carriage is provided with guiding means for movement along the wall of said existing conduit in such a way that said cooling carriage is spaced essentially radially uniformly from said wall of said existing conduit.
Claim 9
Dependent Claim 189 words
A device according to claim 4, in which said cooling carriage is provided with a shield that is disposed behind said spray nozzles when viewed in the direction of travel of said cooling carriage through said existing conduit, with said shield sliding along said wall of said existing condut, and resting thereagainst in a sealing manner; in which said cooling carriage is further provided, behind said shield, with at least one temperature sensor, which slides along said wall of said existing conduit and which measures temperature of the wall that is influenced by cooling carriage speed and quantity of liquefied gas that is to be supplied; and which includes a control device for control of at least one of the cooling carriage speed and the quantity of liquefied gas that is to be supplied, with said at least one temperature sensor being connected to said control device via a control line, said control device effecting change of at least one of cooling carriage speed and quantity of liquefied gas that is to be supplied corresponding to deviation of the measured temperature of the wall from desired conduit wall temperature.
Claim 10
Independent Claim 197 words
A method of preparing an existing underground conduit for replacement by a new conduit, said method including the steps of moving a mole device through the existing conduit, fracturing the latter from within with said mole device via compressive and impact forces, and widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device, said method further comprising the steps of: prior to said step of moving said mole device through said existing conduit, moving a cooling carriage through said existing conduit; spraying liquefied gas from said cooling carriage onto the wall of said existing conduit to cool the latter to a temperature that causes low-temperature embrittlement of the material of said existing conduit, with said liquefied gas having a boiling point that is as low as possible at atmospheric pressure; providing a shield between said cooling carriage and the wall of said existing conduit; carrying out said step of spraying liquefied gas ahead of said shield when viewed in the direction of travel of said cooling carriage through said existing conduit; and withdrawing said liquefied gas from said existing conduit ahead of said shield.
Claim 11
Independent Claim 197 words
A method of preparing an existing underground conduit for replacement by a new conduit, said method including the steps of moving a mole device through the existing conduit, fracturing the latter from within with said mole device via compressive and impact forces, and widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device, said method further comprising the steps of: prior to said step of moving said mole device through said existing conduit, moving a cooling carriage through said existing conduit; spraying liquefied gas from said cooling carriage onto the wall of said existing conduit to cool the latter to a temperature that causes low-temperature embrittlement of the material of said existing conduit, with said liquefied gas having a boiling point that is as low as possible at atmospheric pressure; providing a shield between said cooling carriage and the wall of said existing conduit; carrying out said step of spraying liquefied gas ahead of said shield when viewed in the direction of travel of said cooling carriage through said existing conduit; and withdrawing said liquefied gas from said existing conduit ahead of said shield.
Claim 12
Dependent Claim 18 words
A method according to claim 8, which includes the step of providing liquid nitrogen as said liquefied gas.
Claim 13
Dependent Claim 88 words
A method according to claim 8, which includes the further steps of: measuring the temperature of the wall of said existing conduit behind said shield, and as a function of such measured temperature that is influenced by cooling carriage speed and quantity of liquefied gas that is to be sprayed in, accordingly controlling at least one of the cooling carriage speed and the quantity of liquefied gas that is to be sprayed in, said controlling thereof occurring so that the measured temperature corresponds to desired conduit wall temperature.
Claim 14
Independent Claim 272 words
A method of preparing an existing underground conduit for replacement by a new conduit, said method including the steps of moving a mole device through the existing conduit, fracturing the latter from within with said mole device via compressive and impact forces, and widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device, said method further comprising the steps of: prior to said step of moving said mole device through said existing conduit, moving a cooling carriage through said existing conduit; spraying liquefied gas from said cooling carriage onto the wall of said existing conduit to cool the latter to a temperature that causes low-temperature embrittlement of the material of said existing conduit, with said liquefied gas having a boiling point that is as low as possible at atmospheric pressure; providing a shield between said cooling carriage and the wall of said existing conduit; carrying out said step of spraying liquefied gas ahead of said shield when viewed in the direction of travel of said cooling carriage through said existing conduit; withdrawing said liquefied gas from said existing conduit ahead of said shield; measuring the temperature of the wall of said existing conduit behind said shield; and as a function of such measured temperature that is influenced by cooling carriage speed and quantity of liquefied gas that is to be sprayed in, accordingly controlling at least one of the cooling carriage speed and the quantity of liquefied gas that is to be sprayed in, said controlling thereof occurring so that the measured temperature corresponds to desired conduit wall temperature.
Claim 15
Independent Claim 272 words
A method of preparing an existing underground conduit for replacement by a new conduit, said method including the steps of moving a mole device through the existing conduit, fracturing the latter from within with said mole device via compressive and impact forces, and widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device, said method further comprising the steps of: prior to said step of moving said mole device through said existing conduit, moving a cooling carriage through said existing conduit; spraying liquefied gas from said cooling carriage onto the wall of said existing conduit to cool the latter to a temperature that causes low-temperature embrittlement of the material of said existing conduit, with said liquefied gas having a boiling point that is as low as possible at atmospheric pressure; providing a shield between said cooling carriage and the wall of said existing conduit; carrying out said step of spraying liquefied gas ahead of said shield when viewed in the direction of travel of said cooling carriage through said existing conduit; withdrawing said liquefied gas from said existing conduit ahead of said shield; measuring the temperature of the wall of said existing conduit behind said shield; and as a function of such measured temperature that is influenced by cooling carriage speed and quantity of liquefied gas that is to be sprayed in, accordingly controlling at least one of the cooling carriage speed and the quantity of liquefied gas that is to be sprayed in, said controlling thereof occurring so that the measured temperature corresponds to desired conduit wall temperature.
Claim 16
Dependent Claim 18 words
A method according to claim 11, which includes the step of providing liquid nitrogen as said liquefied gas.
Claim 17
Independent Claim 193 words
A device for preparing an existing underground conduit for replacement by a new conduit, comprising: a cooling carriage that is adapted for movement through said existing conduit, with said cooling carriage being connected via a supply line to a tank for receiving therefrom liquefied gas that has a boiling point that is as low as possible at atmospheric pressure; spray nozzles provided on said cooling carriage in a substantially radial arrangement for spraying said liquefied gas onto the wall of said existing conduit, from within, over the entire inner periphery of said existing conduit; and a mole device for movement through said existing conduit, after said cooling carriage, for fracturing said existing conduit from within with compressive and impact forces, and for widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device; said cooling carriage being provided with a shield that is disposed behind said spray nozzles when viewed in the direction of travel of said cooling carriage through said existing conduit, with said shield sliding along said wall of said existing conduit, and resting thereagainst in a sealing manner.
Claim 18
Independent Claim 193 words
A device for preparing an existing underground conduit for replacement by a new conduit, comprising: a cooling carriage that is adapted for movement through said existing conduit, with said cooling carriage being connected via a supply line to a tank for receiving therefrom liquefied gas that has a boiling point that is as low as possible at atmospheric pressure; spray nozzles provided on said cooling carriage in a substantially radial arrangement for spraying said liquefied gas onto the wall of said existing conduit, from within, over the entire inner periphery of said existing conduit; and a mole device for movement through said existing conduit, after said cooling carriage, for fracturing said existing conduit from within with compressive and impact forces, and for widening the space occupied by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device; said cooling carriage being provided with a shield that is disposed behind said spray nozzles when viewed in the direction of travel of said cooling carriage through said existing conduit, with said shield sliding along said wall of said existing conduit, and resting thereagainst in a sealing manner.
Claim 19
Dependent Claim 14 words
A device according to claim 13, in which said liquefied gas is liquid nitrogen.
Claim 20
Dependent Claim 45 words
A device according to claim 13, in which said cooling carriage is provided with guiding means for movement along the wall of said existing conduit in such a way that said cooling carriage is spaced essentially radially uniformly from said wall of said existing conduit.
Claim 21
Dependent Claim 139 words
A device according to claim 13, in which said cooling carriage is further provided, behind said shield, with at least one temperature sensor, which slides along said wall of said existing conduit an which measures temperature of the wall that is influenced by cooling carriage speed and quantity of liquefied gas that is to be supplied; and which includes a control device for control of at least one of the cooling carriage speed and the quantity of liquefied gas that is to be supplied, with said at least one temperature sensor being connected to said control device via a control line, said control device effecting change of at least one of cooling carriage speed and quantity of liquefied gas that is to be supplied corresponding to deviation of the measured temperature of the wall from desired conduit wall temperature.
Claim 22
Independent Claim 326 words
A device for preparing an existing underground conduit for replacement by a new conduit, comprising: a cooling carriage that is adapted for movement through said existing conduit, with said cooling carriage being connected via a supply line to a tank for receiving therefrom liquefied gas that has a boiling point that is as low as possible at atmospheric pressure; spray nozzles provided on said cooling carriage in a substantially radial arrangement for spraying said liquefied gas onto the wall of said existing conduit, from within, over the entire inner periphery of said existing conduit; and a mole device for movement through said existing conduit, after said cooling carriage, for fracturing said existing conduit from within with compressive and impact forces, and for widening the space occupied; by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device; said cooling carriage being provided with a shield that is disposed behind said spray nozzles when viewed in the direction of travel of said cooling carriage through said existing conduit, with said shield sliding along said wall of said existing conduit, and resting thereagainst in a sealing manner; in which said cooling carriage is further provided, behind said shield, with at least one temperature sensor, which slides along said wall of said existing conduit and which measures temperature of the wall that is influenced by cooling carriage speed and quantity of liquefied gas that is to be supplied; and which includes a control device for control of at least one of the cooling carriage speed and the quantity of liquefied gas that is to be supplied, with said at least one temperature sensor being connected to said control device via a control line, said control device effecting change of at least one of cooling carriage speed and quantity of liquefied gas that is to be supplied corresponding to deviation of the measured temperature of the wall from desired conduit wall temperature.
Claim 23
Independent Claim 326 words
A device for preparing an existing underground conduit for replacement by a new conduit, comprising: a cooling carriage that is adapted for movement through said existing conduit, with said cooling carriage being connected via a supply line to a tank for receiving therefrom liquefied gas that has a boiling point that is as low as possible at atmospheric pressure; spray nozzles provided on said cooling carriage in a substantially radial arrangement for spraying said liquefied gas onto the wall of said existing conduit, from within, over the entire inner periphery of said existing conduit; and a mole device for movement through said existing conduit, after said cooling carriage, for fracturing said existing conduit from within with compressive and impact forces, and for widening the space occupied; by said existing conduit to allow for insertion of said new conduit, which is connected behind said mole device; said cooling carriage being provided with a shield that is disposed behind said spray nozzles when viewed in the direction of travel of said cooling carriage through said existing conduit, with said shield sliding along said wall of said existing conduit, and resting thereagainst in a sealing manner; in which said cooling carriage is further provided, behind said shield, with at least one temperature sensor, which slides along said wall of said existing conduit and which measures temperature of the wall that is influenced by cooling carriage speed and quantity of liquefied gas that is to be supplied; and which includes a control device for control of at least one of the cooling carriage speed and the quantity of liquefied gas that is to be supplied, with said at least one temperature sensor being connected to said control device via a control line, said control device effecting change of at least one of cooling carriage speed and quantity of liquefied gas that is to be supplied corresponding to deviation of the measured temperature of the wall from desired conduit wall temperature.
Claim 24
Dependent Claim 14 words
A device according to claim 17, in which said liquefied gas is liquid nitrogen.
Claim 25
Dependent Claim 45 words
A device according to claim 17, in which said cooling carriage is provided with quiding means for movement along the wall of said existing conduit in such a way that said cooling carriage is spaced essentially radially uniformly from said wall of said existing conduit.

References Cited (Backward Citations)

US2956717A Cited
GB1420049A Cited
US3878978A Cited
US3979981A Cited
US4110092A Cited
US4505302A Cited
GB2123111A Cited
US4487643A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1991-02-08 1991-08-10 1992-02-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1995-02-08 1995-08-10 1996-02-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1999-02-08 1999-08-10 2000-02-09 $7700.00 Window Closed / Lapsed