Patent US4715236A successfully refreshed from Google Patents.
US4715236A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Power transformer inspection procedure
Assignee: Puget Sound Power and Light Co
•
Filing: 1986-10-03
•
Granted: 1987-12-29
•
Expires: 2006-10-03
Abstract
Abstract A method for sampling oil from operating electrical distribution transformers includes the steps of determining the thickness of the container, forming a bore partially through the container wall, placing a self-tapping screw in the bore, and advancing the plug to penetrate the inner surface of the wall. The screw includes means for sealing the bore after the inner wall surface has been penetrated. The screw is counter-rotated to allow dielectric fluid to exit the bore in a controlled manner. The screw is then re-rotated to seal the bore. Samples may be obtained without removing the transformer from service.
Inventors
- 👤 Thomas E. Willert
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-28 20:29
CPC Classifications
G; G01; G01N; G01N1/00; G01N1/02; G01N1/10; G01N1/20; G01N1/2035
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
200 words
A method for obtaining a fluid sample from an electrical transformer of the type having a top and a bottom joined by a continuous wall so as to form a sealed vessel, the continuous wall having an inner wall surface enclosing primary and secondary windings positioned above the transformer bottom and a dielectric fluid, and an outer wall surface supporting secondary bushings, including a neutral secondary bushing, comprising the following steps: locating a position on the outer wall surface between the neutral secondary bushing and the transformer bottom, and below the primary and secondary windings; forming a bore at the located position partially through the continuous wall so that a reduced thickness wall portion remains adjacent to the inner wall surface; placing a self-tapping screw, having a drilling end, a threaded midsection with a relatively constant diameter, a driving end, and a head for sealing the bore, into the bore; rotating the driving end of the screw to advance the drilling end through the rediced thickness wall portion and to penetrate the inner wall surface until the sealing means seals the bore; and counterrotating the driving end of the screw until the fluid exits the bore to obtain the sample.
Claim 2
Independent Claim
200 words
A method for obtaining a fluid sample from an electrical transformer of the type having a top and a bottom joined by a continuous wall so as to form a sealed vessel, the continuous wall having an inner wall surface enclosing primary and secondary windings positioned above the transformer bottom and a dielectric fluid, and an outer wall surface supporting secondary bushings, including a neutral secondary bushing, comprising the following steps: locating a position on the outer wall surface between the neutral secondary bushing and the transformer bottom, and below the primary and secondary windings; forming a bore at the located position partially through the continuous wall so that a reduced thickness wall portion remains adjacent to the inner wall surface; placing a self-tapping screw, having a drilling end, a threaded midsection with a relatively constant diameter, a driving end, and a head for sealing the bore, into the bore; rotating the driving end of the screw to advance the drilling end through the rediced thickness wall portion and to penetrate the inner wall surface until the sealing means seals the bore; and counterrotating the driving end of the screw until the fluid exits the bore to obtain the sample.
Claim 3
Dependent Claim
36 words
The method of claim 1 wherein the position-locating step includes the step of measuring approximately two inches up from the transformer bottom so that the windings are not inadvertently contacted during the bore-forming and screw-rotating steps.
Claim 4
Dependent Claim
22 words
The method of claim 2, including the step of maintaining electrical power to the primary windings during the bore-forming and screw-rotating steps.
Claim 5
Dependent Claim
40 words
The method of claim 2, including the steps of re-rotating the driving end of the screw to reseal the bore, and coating an adjacent portion of the transformer outer wall surface with a material to discourage counterrotation of the screw.
Claim 6
Dependent Claim
33 words
The method of claim 1, including the step of attaching a collecting means to the transformer prior to the bore-forming step, said collecting means being used to collect fluid passing through said bore.
References Cited (Backward Citations)
US1795430A
Cited
US3068724A
Cited
US3992155A
Cited
US4046013A
Cited
US4058373A
Cited
US4350052A
Cited
US4430208A
Cited
US4578194A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1990-12-28 | 1991-06-29 | 1991-12-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1994-12-28 | 1995-06-29 | 1995-12-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1998-12-28 | 1999-06-29 | 1999-12-29 | $7700.00 | Window Closed / Lapsed |