Claims Analysis
Total Claims: 34
Claim 1
Independent Claim
133 words
A process for producing an ingot from metal scrap by first melting the scrap in a vacuum melting furnace and then solidifying the melt in a water-cooled mold into an ingot comprising: charging the metal scrap into a tubular member with a closed end and another end, said tubular member being made of the same material as that of the scrap; heating said tubular member with an electron beam or from said closed end toward the other end thereof to heat and melt said tubular member and said scrap charged into said tubular member to form a melt; said tubular member being held substantially horizontally in said vacuum melting furnace during said heating step; and a causing the resulting melt to drop into said water-cooled mold wherein it is solidified into an ingot.
Claim 2
Dependent Claim
133 words
A process for producing an ingot from metal scrap by first melting the scrap in a vacuum melting furnace and then solidifying the melt in a water-cooled mold into an ingot comprising: charging the metal scrap into a tubular member with a closed end and another end, said tubular member being made of the same material as that of the scrap; heating said tubular member with an electron beam or from said closed end toward the other end thereof to heat and melt said tubular member and said scrap charged into said tubular member to form a melt; said tubular member being held substantially horizontally in said vacuum melting furnace during said heating step; and a causing the resulting melt to drop into said water-cooled mold wherein it is solidified into an ingot.
Claim 3
Dependent Claim
18 words
The process of claim 1, wherein said metal scrap is made of titanium, zirconium or an alloy thereof.
Claim 4
Dependent Claim
16 words
The process of claim 1, wherein said tubular member is heated with a plasma electron beam.
Claim 5
Dependent Claim
24 words
The process of claim 1, comprising temporarily holding said melt within a hearth, and overflowing said melt from said hearth into said water-cooled mold.
Claim 6
Dependent Claim
13 words
The process of claim 4, comprising heating said hearth with said melt therein.
Claim 7
Dependent Claim
14 words
The process of claim 5, wherein said hearth is heated with an electron beam.
Claim 8
Dependent Claim
29 words
The process of claim: 1, wherein said heating step comprises advancing said tubular member toward a heating zone of said electron beam during said heating of said tubular member.
Claim 9
Dependent Claim
23 words
The process of claim 7, wherein said advancing step comprises incrementally advancing said tubular member into said heating zone during said heating thereof.
Claim 10
Dependent Claim
154 words
A process for producing an ingot from metal scrap by first melting the scrap in a consumable-electrode type arc melting furnace and then solidifying the melt in a water-cooled mold into an ingot comprising: charging the metal scrap into at least one pair of tubular members each having a closed end and another end, said tubular members being made of the same material as that of the scrap; said at least one pair of tubular members being held substantially horizontally in said furnace and being arranged end-to-end with said closed ends facing each other and spaced apart from each other; producing an arc between said facing closed ends of said tubular members which serve as consumable electrodes in said furnace to heat and melt said tubular members and said scrap charged therein to form a melt; and causing the resulting melt to drop into said water-cooled mold wherein it is solidified into an ingot.
Claim 11
Dependent Claim
154 words
A process for producing an ingot from metal scrap by first melting the scrap in a consumable-electrode type arc melting furnace and then solidifying the melt in a water-cooled mold into an ingot comprising: charging the metal scrap into at least one pair of tubular members each having a closed end and another end, said tubular members being made of the same material as that of the scrap; said at least one pair of tubular members being held substantially horizontally in said furnace and being arranged end-to-end with said closed ends facing each other and spaced apart from each other; producing an arc between said facing closed ends of said tubular members which serve as consumable electrodes in said furnace to heat and melt said tubular members and said scrap charged therein to form a melt; and causing the resulting melt to drop into said water-cooled mold wherein it is solidified into an ingot.
Claim 12
Dependent Claim
18 words
The process df claim 9, wherein said metal scrap is made of titanium, zirconium or an alloy thereof.
Claim 13
Dependent Claim
24 words
The process of claim 9, comprising temporarily holding said melt within a hearth, and overflowing said melt from said hearth into said water-cooled mold.
Claim 14
Dependent Claim
13 words
The process of claim 11, comprising heating said hearth with said melt therein.
Claim 15
Dependent Claim
20 words
The process of claim 9, comprising advancing said tubular members toward each other during said heating thereof by said arc.
Claim 16
Dependent Claim
155 words
A process for producing an ingot from metal scrap by first melting the scrap in a vacuum melting furnace and then solidifying the melt in a water-cooled mold into an ingot comprising: charging the metal scrap into a box with having an open top and at least two ends, said box containing at least one of the components present in said metal scrap, and said box having a shape such as that which is formed by cutting a tubular member of a polygonal cross section in the axial direction; heating said box with an electron beam from an end thereof toward the other end thereof to heat and melt the box and the scrap charged into said box to form a melt; said box being held substantially horizontally in said vacuum melting furnace during said heating step; and causing the resulting melt to drop into said water-cooled mdold wherein it is solidified into an ingot.
Claim 17
Dependent Claim
155 words
A process for producing an ingot from metal scrap by first melting the scrap in a vacuum melting furnace and then solidifying the melt in a water-cooled mold into an ingot comprising: charging the metal scrap into a box with having an open top and at least two ends, said box containing at least one of the components present in said metal scrap, and said box having a shape such as that which is formed by cutting a tubular member of a polygonal cross section in the axial direction; heating said box with an electron beam from an end thereof toward the other end thereof to heat and melt the box and the scrap charged into said box to form a melt; said box being held substantially horizontally in said vacuum melting furnace during said heating step; and causing the resulting melt to drop into said water-cooled mdold wherein it is solidified into an ingot.
Claim 18
Dependent Claim
18 words
The process of claim 14, wherein said metal scrap is made of titanium, zirconium or an alloy thereof.
Claim 19
Dependent Claim
15 words
The process of claim 14, wherein said box is heated with a plasma electron beam.
Claim 20
Dependent Claim
24 words
The process of claim 14, comprising temporarily holding said melt within a hearth, and overflowing said melt from said hearth into said water-cooled mold,
Claim 21
Dependent Claim
13 words
The process of claim 17, comprising heating said hearth with said melt therein.
Claim 22
Dependent Claim
20 words
The process of claim 14, wherein said box has a holding member at at least one of said ends thereof.
Claim 23
Dependent Claim
16 words
The process of claim 14, wherein said box has no holding member at any end thereof.
Claim 24
Dependent Claim
14 words
The process of claim 14, wherein said box has a generally U-shaped cross section.
Claim 25
Dependent Claim
27 words
The process of claim 14, wherein said heating step comprises advancing said box toward a heating zone of said electron beam during said heating of said box.
Claim 26
Dependent Claim
22 words
The process of claim 22, wherein said advancing step comprises incrementally advancing said box into said heating zone during said heating thereof.
Claim 27
Dependent Claim
177 words
A process for producing an ingot from metal scrap by first melting the scrap in a consumable-electrode type arc melting furnace and then solidifying the melt in a water-cooled mold into an ingot comprising: charging the metal scrap into at least one pair of boxes each having an open top and at least two ends said boxes containing at least one of the components present in said metal scrap, and said boxes each having a shape such as that which is formed by cutting a tubular member of a polygonal cross section in the axial direction; said at least one pair of boxes being held substantially horzontally in said furnace and being arranged end-to-end with ends thereof facing each other and spaced apart from each other; producing an arc between said facing ends of said boxes which serve as consumable electrodes in said furnace to heat and melt said boxes and said scrap charged therein to form a melt; and causing the resulting melt to drop into said water-cooled mold wherein it is solidified into an ingot.
Claim 28
Dependent Claim
177 words
A process for producing an ingot from metal scrap by first melting the scrap in a consumable-electrode type arc melting furnace and then solidifying the melt in a water-cooled mold into an ingot comprising: charging the metal scrap into at least one pair of boxes each having an open top and at least two ends said boxes containing at least one of the components present in said metal scrap, and said boxes each having a shape such as that which is formed by cutting a tubular member of a polygonal cross section in the axial direction; said at least one pair of boxes being held substantially horzontally in said furnace and being arranged end-to-end with ends thereof facing each other and spaced apart from each other; producing an arc between said facing ends of said boxes which serve as consumable electrodes in said furnace to heat and melt said boxes and said scrap charged therein to form a melt; and causing the resulting melt to drop into said water-cooled mold wherein it is solidified into an ingot.
Claim 29
Dependent Claim
17 words
The process of claim 24, said metal scrap is made of titanium, zirconium or an alloy thereof.
Claim 30
Dependent Claim
24 words
The process of claim 24, comprising temporarily holding said melt within a hearth, and overflowing said melt from said hearth into said water-cooled mold.
Claim 31
Dependent Claim
13 words
The process of claim 26, comprising heating said hearth with said melt therein.
Claim 32
Dependent Claim
19 words
The process df claim 24, comprising advancing said boxes toward each other during said heating thereof by said arc.
Claim 33
Dependent Claim
18 words
The process of claim 24, wherein said boxes have a holding member at at least one end thereof.
Claim 34
Dependent Claim
15 words
The process of claim 24, wherein said boxes each have a generally U-shaped cross section.