Patent US4625536A successfully refreshed from Google Patents.
US4625536A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of controlling unequal circumferential speed rolling
Assignee: Hitachi Ltd
•
Filing: 1985-01-09
•
Granted: 1986-12-02
•
Expires: 2005-01-09
Abstract
Abstract A set-up method for unequal speed circumferential rolling. The setting values of the circumferential speeds of a higher speed roll and a lower speed roll and the roll position are obtained by using, as rolling parameters in a rolling schedule, the inlet and outlet thicknesses, the forward and backward tensions, the radii of the rolls, the frictional coefficients and the ratio of the circumferential speeds of the rolls. The setting values are computed such that these values meet the rolling conditions within both the load limit value and the tension limit value.
Inventors
- 👤 Yasuo Morooka
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 12:14
CPC Classifications
B; B21; B21B; B21B37/00; B21B37/46; B21B1/00; B21B1/22; B21B1/30; B21B1/32
Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
271 words
A set-up method for control of unequal circumferential speed rolling in which a work to be rolled is made to pass between at least one pair of rolls each of which is driven at a different circumferential speed, said set-up method comprising the steps of: calculating angles (φ H , φ L ) of neutral points on a higher speed roll and a lower speed roll in accordance with at least diameters of the respective rolls of said pair of rolls, predetermined outlet thickness of said work and a ratio of the circumferential speeds of said higher speed roll and said lower speed roll; calculating forward slip rates (f H , f L ) of said higher speed roll and said lower speed roll in accordance with said calculated angles of neutral points of said rolls, said diameters of said rolls and said outlet thickness of said work; calculating a total rolling force in accordance with a load distribution curve when said calculated angles of neutral points of said rolls are not greater than a contact angle (φ m ) of said work and said rolls; calculating a circumferential speed of said higher speed roll and a circumferential speed of said lower speed roll in accordance with said calculated forward slip rates of said higher speed roll and said lower speed roll and a target outlet speed of said work; calculating roll positions for said rolls in accordance with said calculated total rolling force and said target speed of said work; and setting up and controlling said rolls in accordance with said calculated circumferential speeds and roll positions of said rolls.
Claim 2
Dependent Claim
271 words
A set-up method for control of unequal circumferential speed rolling in which a work to be rolled is made to pass between at least one pair of rolls each of which is driven at a different circumferential speed, said set-up method comprising the steps of: calculating angles (φ H , φ L ) of neutral points on a higher speed roll and a lower speed roll in accordance with at least diameters of the respective rolls of said pair of rolls, predetermined outlet thickness of said work and a ratio of the circumferential speeds of said higher speed roll and said lower speed roll; calculating forward slip rates (f H , f L ) of said higher speed roll and said lower speed roll in accordance with said calculated angles of neutral points of said rolls, said diameters of said rolls and said outlet thickness of said work; calculating a total rolling force in accordance with a load distribution curve when said calculated angles of neutral points of said rolls are not greater than a contact angle (φ m ) of said work and said rolls; calculating a circumferential speed of said higher speed roll and a circumferential speed of said lower speed roll in accordance with said calculated forward slip rates of said higher speed roll and said lower speed roll and a target outlet speed of said work; calculating roll positions for said rolls in accordance with said calculated total rolling force and said target speed of said work; and setting up and controlling said rolls in accordance with said calculated circumferential speeds and roll positions of said rolls.
Claim 3
Dependent Claim
64 words
The method according to claim 1, further comprising the steps of correcting said ratio of the circumferential speeds of said rolls when said calculated total rolling force is greater than a predetermined allowable limit value, repeatedly correcting said ratio of the circumferential speeds of said rolls and calculating said total rolling force until the calculated total rolling force becomes smaller than said limit value.
Claim 4
Dependent Claim
62 words
The method according to claim 2, further comprising the steps of providing a predetermined forward tension value correcting said forward tension value when said calculated total rolling force is greater than said predetermined allowable limit force value, repeatedly correcting said forward tension value and calculating said total rolling force until said calculated total rolling force becomes smaller than said limit force value.
Claim 5
Dependent Claim
60 words
The method according to claim 3, further comprising the steps of correcting said target outlet speed of said work when said calculated total rolling force is greater than said predetermined allowable limit value, repeatedly correcting said target outlet speed of said work and calculating said total rolling force until said calculated total rolling force becomes smaller than said limit value.
Claim 6
Dependent Claim
57 words
The method according to claim 1, further comprising the step of passing the work to be rolled between said at least one pair of rolls without causing said work to pass along the periphery of one of said pair of rolls before entering the work area between said pair of rolls and after exiting the work area.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-12-01 | 1990-06-02 | 1990-12-02 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-12-01 | 1994-06-02 | 1994-12-02 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-12-01 | 1998-06-02 | 1998-12-02 | $7700.00 | Window Closed / Lapsed |