Steamer of steam circulation system
Abstract
Abstract A steamer in a steam circulation system can steam goods being transferred by a conveyor. A steam-jetting pipe is placed under the conveyor, a steam-sucking pipe is placed above the conveyor and an ejector condenser is placed on the way of primary steam heading for the steam-jetting pipe, provided the steam-sucking pipe is connected to the ejector condenser in order to feed back spent steam. A jet of fresh steam ascends in a walled room so as to steam goods on the conveyor and spent steam having increased humidity is sucked to return to the ejector condenser. Primary steam passing through the ejector condenser absorbs spent steam collected by the steam-sucking pipe so as to adjust the moisture content. Since spent steam is recovered and re-used, energy and consumption of primary steam are saved greatly, which can result in a wide cost reduction.
Inventors
- 👤 Masakichi Onodera
Bibliographic Details
Claims Analysis
Total Claims: 5References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-09-22 | 1990-03-24 | 1990-09-23 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-09-22 | 1994-03-24 | 1994-09-23 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-09-22 | 1998-03-24 | 1998-09-23 | $7700.00 | Window Closed / Lapsed |