Rockbolt

Assignee: Individual
•
Filing: 1984-02-22
•
Granted: 1986-07-22
•
Expires: 2004-02-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A rockbolt for installation in a bore in the roof of an underground excavation, such as a tunnel or mine, to support the roof, comprises a sleeve having a closed top and ports in its upper end, a plunger slideably mounted in the sleeve, and hardenable binder material encapsulated in burstable cartridges in the sleeve above the plunger. The rockbolt is inserted into the bore and the plunger is operated either mechanically or by the application of pressurized fluid to the plunger, to extrude the binder material to secure the rockbolt in the bore. A mechanical anchor can be provided on the top of the sleeve so the rockbolt can be tensioned before the binder sets. Alternatively, faster setting binder can be provided in the sleeve below the balance of the binder so that it is the last to be extruded and remains near the top to secure the top to the surrounding rock before the balance of the binder sets so that the rockbolt can be tensioned before the balance of the binder sets.

Inventors

  • 👤 William L. Lane
  • 👤 Donald L. Lewis

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 14:27
CPC Classifications
E; E21; E21D; E21D20/00; E21D20/02; E21D20/025; E21D20/026; E21D21/00; E21D21/0026; E21D21/008; F; F16; F16B; F16B13/00; F16B13/14; F16B13/141; F16B13/143

Claims Analysis

Total Claims: 28
Claim 1
Independent Claim 93 words
A rockbolt for installation in a bore in the roof of an underground excavation to support the roof, comprising: a sleeve insertable into the bore having an upper and a lower end and means for defining at least one port in the sleeve near the upper end; a plunger in the sleeve sealingly engaging the sleeve but slideable in response to applied fluid pressure; hardenable binder material in the sleeve between the port and the plunger and; means for applying fluid pressure to the plunger to extrude the binder material from the port.
Claim 2
Dependent Claim 93 words
A rockbolt for installation in a bore in the roof of an underground excavation to support the roof, comprising: a sleeve insertable into the bore having an upper and a lower end and means for defining at least one port in the sleeve near the upper end; a plunger in the sleeve sealingly engaging the sleeve but slideable in response to applied fluid pressure; hardenable binder material in the sleeve between the port and the plunger and; means for applying fluid pressure to the plunger to extrude the binder material from the port.
Claim 3
Dependent Claim 30 words
The rockbolt of claim 1 wherein the means for applying fluid pressure comprises means for connecting the portion of the sleeve below the plunger to a source of pressurized fluid.
Claim 4
Dependent Claim 20 words
The rockbolt of claim 1 further comprising means for engaging the sleeve, near the lower end, to the roof face.
Claim 5
Dependent Claim 34 words
The rockbolt of claim 3 wherein the means for engaging the sleeve to the roof face comprises means near the lower end of the sleeve for engaging a face plate engaging the roof face.
Claim 6
Dependent Claim 48 words
The rockbolt of claim 3 wherein the means for engaging the sleeve to the roof face comprises the threaded collar on the sleeve near the lower end and a nut threadingly engaged on the threaded collar and projecting sufficiently to engage a face plate engaging the roof face.
Claim 7
Dependent Claim 22 words
The rockbolt of claim 3 further comprising means for engaging the sleeve near the upper end, to the rock surrounding the bore.
Claim 8
Dependent Claim 28 words
The rockbolt of claim 6 wherein the means for engaging the sleeve to the rock surrounding the bore comprises an expandable anchor on the top of the sleeve.
Claim 9
Dependent Claim 41 words
The rockbolt of claim 6 further comprising means for tensioning the sleeve between the means for engaging the sleeve to the roof face and the means for engaging the sleeve to the rock surrounding the bore, to compress the rock therebetween.
Claim 10
Dependent Claim 41 words
The rockbolt of claim 1 further comprising a seal above the port, said seal engaging the surrounding rock when the rockbolt is installed in the bore and preventing upward travel of the binder material upon the binder extrusion from the sleeve.
Claim 11
Dependent Claim 18 words
The rockbolt of claim 1 wherein the hardenable binder materials is contained in at least one burstable cartridge.
Claim 12
Dependent Claim 35 words
The rockbolt of claim 9 wherein the hardenable binder comprises at least two components which form the hardenable binder material when mixed, and wherein the components are separately encapsulated in at least one burstable cartridge.
Claim 13
Dependent Claim 21 words
The rockbolt of claim 11 further comprising means for cutting the burstable cartridge and mixing the binder components in the sleeve.
Claim 14
Dependent Claim 42 words
The rockbolt of claim 12 wherein the means for cutting the burstable cartridge and mixing the components comprises a generally cylindrical tube with a chamfered bottom edge for cutting and a plurality of ports on the side of the tube for mixing.
Claim 15
Dependent Claim 78 words
The rockbolt of claim 1 wherein the hardenable binder material includes some binder material of appreciably faster setting time than the balance of the binder material, and wherein this faster setting binder material is below the balance of the binder material in the sleeve so that it is extruded last and remains near the upper end of the sleeve to secure the upper end of the sleeve in the bore before the balance of the binder material sets.
Claim 16
Dependent Claim 146 words
A rockbolt for installation in a bore in the roof of an underground excavation to support the roof, comprising: a sleeve insertable into the bore having an upper end and a lower end and means for defining at least one port in the sleeve near the upper end; a plunger in the sleeve sealingly engaging the sleeve but slideable in response to applied fluid pressure; hardenable binder material comprised of at least two components which form a hardenable binder material when mixed, separately encapsulated in at least one burstable cartridge, in the sleeve between the port and the plunger; means for connecting the portion of the sleeve below the plunger to a source of pressurized fluid to operate the plunger to extrude the binder material and encase the sleeve in the bore; and, means for engaging the sleeve, near the lower end, to the roof face.
Claim 17
Dependent Claim 146 words
A rockbolt for installation in a bore in the roof of an underground excavation to support the roof, comprising: a sleeve insertable into the bore having an upper end and a lower end and means for defining at least one port in the sleeve near the upper end; a plunger in the sleeve sealingly engaging the sleeve but slideable in response to applied fluid pressure; hardenable binder material comprised of at least two components which form a hardenable binder material when mixed, separately encapsulated in at least one burstable cartridge, in the sleeve between the port and the plunger; means for connecting the portion of the sleeve below the plunger to a source of pressurized fluid to operate the plunger to extrude the binder material and encase the sleeve in the bore; and, means for engaging the sleeve, near the lower end, to the roof face.
Claim 18
Dependent Claim 51 words
The rockbolt of claim 15 further comprising means for engaging the sleeve, near the upper end, to the rock surrounding the bore and means for tensioning the sleeve between the means for engaging the rock surrounding the bore and the means for engaging the roof face to compress the rock therebetween.
Claim 19
Independent Claim 97 words
A method for supporting the roof of an underground excavation, comprising: making a bore in the roof of the excavation; inserting into the bore a sleeve having an upper and a lower end and means for defining at least one port in the sleeve near the upper end, the sleeve containing a plunger sealingly engaging the sleeve but slideable in response to applied fluid pressure, the sleeve further containing hardenable binder material between the port and the plunger; and, apply fluid pressure to the plunger to extrude the binder material to encase the sleeve in the bore.
Claim 20
Independent Claim 97 words
A method for supporting the roof of an underground excavation, comprising: making a bore in the roof of the excavation; inserting into the bore a sleeve having an upper and a lower end and means for defining at least one port in the sleeve near the upper end, the sleeve containing a plunger sealingly engaging the sleeve but slideable in response to applied fluid pressure, the sleeve further containing hardenable binder material between the port and the plunger; and, apply fluid pressure to the plunger to extrude the binder material to encase the sleeve in the bore.
Claim 21
Dependent Claim 39 words
The method of claim 17 wherein the step of applying fluid pressure to the plunger comprises connecting the portion of the sleeve below the plunger to a source of pressurized fluid to operate the plunger to extrude binder material.
Claim 22
Dependent Claim 28 words
The method of claim 18 further including the step of tensioning the sleeve to compress the rock between the upper and lower ends before extruding the binder material.
Claim 23
Dependent Claim 28 words
The method of claim 17 further including the step of tensioning the sleeve to compress the rock between its upper end lower ends after extruding the binder material.
Claim 24
Dependent Claim 98 words
The method of claim 17 wherein a portion of the hardenable binder material in the sleeve has an appreciably faster setting time than the balance of the binder material and wherein the faster setting binder material is below the balance of the binder material in the sleeve so that it is extruded last and remains near the top of the sleeve, the method further comprising the step of tensioning the sleeve to compress the rock between its upper and lower ends after the fast setting binder material has set but before the rest of the binder material sets.
Claim 25
Independent Claim 175 words
A method for supporting the roof of an underground excavation, comprising: making a bore in the roof of the excavation; inserting into the bore a sleeve having an upper and an lower end, and means for defining at least one port in the sleeve near the upper end, the sleeve containing a plunger sealingly engaging the sleeve but slideable in response to applied fluid pressure, the sleeve further containing hardenable binder material between the port and the plunger, means for engaging the sleeve near the lower end to the roof face, and means for engaging the sleeve near the upper end to the rock surrounding the bore; engaging the upper end of the sleeve to the rock surrounding the bore and the lower end of the sleeve to the roof face; tensioning the sleeve to compress the rock between the upper and lower ends of the sleeve; connecting the portion of the sleeve below the plunger to a source of pressurized fluid to operate the plunger to extrude the binder material to encase the sleeve.
Claim 26
Independent Claim 175 words
A method for supporting the roof of an underground excavation, comprising: making a bore in the roof of the excavation; inserting into the bore a sleeve having an upper and an lower end, and means for defining at least one port in the sleeve near the upper end, the sleeve containing a plunger sealingly engaging the sleeve but slideable in response to applied fluid pressure, the sleeve further containing hardenable binder material between the port and the plunger, means for engaging the sleeve near the lower end to the roof face, and means for engaging the sleeve near the upper end to the rock surrounding the bore; engaging the upper end of the sleeve to the rock surrounding the bore and the lower end of the sleeve to the roof face; tensioning the sleeve to compress the rock between the upper and lower ends of the sleeve; connecting the portion of the sleeve below the plunger to a source of pressurized fluid to operate the plunger to extrude the binder material to encase the sleeve.
Claim 27
Independent Claim 198 words
A method for supporting the roof of an underground excavation, comprising: making a bore in the roof of the excavation; inserting into the bore a sleeve having an upper and a lower end and a means for defining at least one port in the sleeve near the upper end, the sleeve containing a plunger sealingly engaging the sleeve but slideable in response to applied fluid pressure, the sleeve further containing hardenable binder material between the port and the plunger, a portion of this binder material being of appreciably faster setting time than the balance of the binder material, the faster setting binder material being below the balance of the binder material in the sleeve so that it would be extruded last and would remain near the top of the sleeve, and means for engaging the sleeve, near the lower end, to the roof face; connecting the portion of the sleeve below the plunger to a source of pressurized fluid to operate the plunger to extrude the binder material; tensioning the sleeve after the faster setting binder material has set but before the balance of the binder material sets, to compress the rock between the upper and lower ends.
Claim 28
Independent Claim 198 words
A method for supporting the roof of an underground excavation, comprising: making a bore in the roof of the excavation; inserting into the bore a sleeve having an upper and a lower end and a means for defining at least one port in the sleeve near the upper end, the sleeve containing a plunger sealingly engaging the sleeve but slideable in response to applied fluid pressure, the sleeve further containing hardenable binder material between the port and the plunger, a portion of this binder material being of appreciably faster setting time than the balance of the binder material, the faster setting binder material being below the balance of the binder material in the sleeve so that it would be extruded last and would remain near the top of the sleeve, and means for engaging the sleeve, near the lower end, to the roof face; connecting the portion of the sleeve below the plunger to a source of pressurized fluid to operate the plunger to extrude the binder material; tensioning the sleeve after the faster setting binder material has set but before the balance of the binder material sets, to compress the rock between the upper and lower ends.

References Cited (Backward Citations)

US2092341A Cited
US2287395A Cited
US2849866A Cited
US2950602A Cited
US3308585A Cited
US3613495A Cited
US4224971A Cited
US4098166A Cited
US4055051A Cited
US4362440A Cited
US4461600A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-07-21 1990-01-20 1990-07-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-07-21 1994-01-20 1994-07-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-07-21 1998-01-20 1998-07-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag