Patent US4601338A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4601338A Expired / Lapsed US ⏱️ 0.0 years remaining

Foam and impedance-guided steam injection

Assignee: Shell USA Inc
•
Filing: 1985-02-04
•
Granted: 1986-07-22
•
Expires: 2005-02-04
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A selective injection of gaseous fluid into a portion of a subterranean reservoir is improved by positioning an impedance to fluid flow in the annulus between a pipe string and a surrounding permeable-walled conduit, ensuring the presence of granular solids between the permeable-walled conduit and the reservoir, injecting the gaseous fluid through the pipe string to a point below the impedance and injecting fluid which is more viscous than the gaseous fluid down the annulus to restrict bypassing of the impedance.

Inventors

  • 👤 Michael Prats
  • 👤 Paul B. Ritter, Jr.

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 21:26
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/02; E21B43/04; E21B43/16; E21B43/24

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 225 words
In a well treating process within a reservoir in which a gaseous fluid is injected through tubing surrounded by a permeable-walled conduit in a manner tending to provide a preferential inflow into a selected portion of the reservoir, an improvement comprising: in a location near but above that at which the gaseous fluid is to be injected into the reservoir, introducing solid granules into the space between the permeable-walled conduit and the reservoir to an extent sufficient to ensure that the vertical permeability in that space is not significantly more than the permeability provided by the interstices between a mass of gravel-sized solid particles; positioning a mechanical fluid-flow-impeding means within the annulus between the tubing string and the permeable-walled conduit at a depth which is below the top of said mass of gravel-sized particles and is just above the depth at which the gaseous fluid is to be injected into the reservoir; injecting fluid which is significantly more viscous than the gaseous fluid through the annulus and into said mass of particles above the mechanical flow impeding means at a rate and pressure such that the fluid pressure near the impedance exceeds the pressure at which the gaseous fluid is to be injected into the reservoir; and injecting the gaseous fluid through the tubing string and into the reservoir below the mechanical flow impeding means.
Claim 2
Dependent Claim 225 words
In a well treating process within a reservoir in which a gaseous fluid is injected through tubing surrounded by a permeable-walled conduit in a manner tending to provide a preferential inflow into a selected portion of the reservoir, an improvement comprising: in a location near but above that at which the gaseous fluid is to be injected into the reservoir, introducing solid granules into the space between the permeable-walled conduit and the reservoir to an extent sufficient to ensure that the vertical permeability in that space is not significantly more than the permeability provided by the interstices between a mass of gravel-sized solid particles; positioning a mechanical fluid-flow-impeding means within the annulus between the tubing string and the permeable-walled conduit at a depth which is below the top of said mass of gravel-sized particles and is just above the depth at which the gaseous fluid is to be injected into the reservoir; injecting fluid which is significantly more viscous than the gaseous fluid through the annulus and into said mass of particles above the mechanical flow impeding means at a rate and pressure such that the fluid pressure near the impedance exceeds the pressure at which the gaseous fluid is to be injected into the reservoir; and injecting the gaseous fluid through the tubing string and into the reservoir below the mechanical flow impeding means.
Claim 3
Dependent Claim 23 words
The process of claim 1 in which the permeable-walled conduit comprises a perforated liner or screen at the depth of the reservoir interval.
Claim 4
Dependent Claim 28 words
The process of claim 2 in which the granular solids filling the annulus between the permeable-walled conduit and the reservoir are those of a previously installed gravel pack.
Claim 5
Dependent Claim 17 words
The process of claim 1 in which said flow impeding means is a pair of elastomeric cups.
Claim 6
Dependent Claim 23 words
The process of claim 1 in which the permeable-walled conduit is a perforated or slotted liner or screen surrounded by a perforated casing.
Claim 7
Dependent Claim 15 words
The process of claim 1 in which the flow impedance is a packer or retainer.
Claim 8
Dependent Claim 22 words
The process of claim 1 in which the fluid which is significantly more viscous than the gaseous fluid is a steam foam.
Claim 9
Dependent Claim 23 words
The process of claim 7 in which the steam foam is formed by a mixture of steam, water, surfactant, electrolyte and noncondensible gas.
Claim 10
Dependent Claim 27 words
The process of claim 8 in which the viscosity of the steam foam is arranged to allow a significant flow of steam foam into the reservoir formation.
Claim 11
Dependent Claim 19 words
The process of claim 9 in which the well treating process is a steam soak process for recovering oil.

References Cited (Backward Citations)

US3587741A Cited
US3994345A Cited
US4445573A Cited
US4532993A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-07-21 1990-01-20 1990-07-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-07-21 1994-01-20 1994-07-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-07-21 1998-01-20 1998-07-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag