Patent US4599027A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4599027A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for moving cargo between a ship and a dock

Assignee: VIRGINIA INTERNATIONAL TERMINALS Inc A CORP OF VA
•
Filing: 1985-03-15
•
Granted: 1986-07-08
•
Expires: 2005-03-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Cargo containers are moved between a dock and a ship by a crane which has a vertically movable landing platform, a waterside trolley for moving cargo between the ship and the landing platform, and a landside trolley for moving cargo between the dock and the landing platform. The landing platform is moved to different elevations to change the extent of vertical movement performed on the cargo by each of the tolleys. In the course of operations, the landing platform is movable to an elevation which corresponds approximately to the higher of: (a) the elevation of the designated location on the ship where the article of cargo is to loaded or unloaded, or (b) the elevation of the highest obstacle between the dock and the designated location; and, both trolleys are operated while the landing platform is at this elevation.

Inventors

  • 👤 Richard N. Knapp

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 15:23
CPC Classifications
B; B65; B65G; B65G63/00; B66; B66C; B66C19/00; B66C19/002; B65G63/002; B65G63/004

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 138 words
In a quayside crane for moving cargo between a dock and a ship, said crane having a landing platform and a waterside trolley for moving cargo between the landing platform and ship, said waterside trolley being operable to lift cargo from and set cargo on said landing platform and ship, said crane also having a landside trolley for moving cargo between the landing platform and the dock, said landside trolley being at a lower elevation than the waterside trolley and being operable to lift cargo from and set cargo on said landing platform and dock, the improvement wherein said landing platform is vertically movable to positions at different elevations for handling different tiers of cargo on the ship and to change the extent of vertical movement performed on the cargo by each of the waterside and landside trolleys.
Claim 2
Dependent Claim 138 words
In a quayside crane for moving cargo between a dock and a ship, said crane having a landing platform and a waterside trolley for moving cargo between the landing platform and ship, said waterside trolley being operable to lift cargo from and set cargo on said landing platform and ship, said crane also having a landside trolley for moving cargo between the landing platform and the dock, said landside trolley being at a lower elevation than the waterside trolley and being operable to lift cargo from and set cargo on said landing platform and dock, the improvement wherein said landing platform is vertically movable to positions at different elevations for handling different tiers of cargo on the ship and to change the extent of vertical movement performed on the cargo by each of the waterside and landside trolleys.
Claim 3
Dependent Claim 41 words
The invention according to claim 1 having a rail for supporting the landside trolley for substantially horizontal movement, said rail being vertically movable with said landing platform so there is a constant vertical distance between the rail and the landing platform.
Claim 4
Dependent Claim 39 words
The invention according to claim 1 wherein the waterside trolley is supported on a track which is hinged for movement to a raised storage position where it will not interfere with ships which are approaching and leaving the dock.
Claim 5
Dependent Claim 15 words
The invention according to claim 1 wherein the crane is movable longitudinally along the dock.
Claim 6
Dependent Claim 48 words
The invention according to claim 1 in which the trolleys include downwardly extending wire ropes which, on the landside trolley, diverge in an upward direction to a greater extent than the wire ropes on the waterside trolley, thereby diminishing the swaying of containers supported by the landside trolley.
Claim 7
Independent Claim 121 words
A method of moving cargo between a dock and first and second tiers on a ship, said method being performed by a quayside crane assembly, said crane assembly including a waterside trolley, a vertically movable landing platform, and a landside trolley, said method including the steps of keeping the landing platform at a first elevation which is spaced above the dock while operating the landside and waterside trolleys to move cargo between said first tier and the landing platform, vertically moving the landing platform to a second elevation which is spaced above the dock, and operating the landside and waterside trolleys while the landing platform is at said second elevation to move cargo between the second tier and the landing platform.
Claim 8
Independent Claim 121 words
A method of moving cargo between a dock and first and second tiers on a ship, said method being performed by a quayside crane assembly, said crane assembly including a waterside trolley, a vertically movable landing platform, and a landside trolley, said method including the steps of keeping the landing platform at a first elevation which is spaced above the dock while operating the landside and waterside trolleys to move cargo between said first tier and the landing platform, vertically moving the landing platform to a second elevation which is spaced above the dock, and operating the landside and waterside trolleys while the landing platform is at said second elevation to move cargo between the second tier and the landing platform.
Claim 9
Independent Claim 161 words
A method of moving cargo between a dock and a designated location on a ship, said method being performed with a quayside crane assembly which has a landing platform, a waterside trolley for moving cargo between the ship and the landing platform, and a landside trolley for moving cargo between the landing platform and the dock; said method including the steps of vertically moving the landing platform to an elevation which corresponds approximately to the higher of the following: (a) the elevation of the designated location in a tier on the ship where an article of cargo is to be unloaded or loaded, or (b) the elevation of the highest obstacle between the dock and the designated location in said tier, and operating said landside and waterside trolleys when the landing platform is at said elevation to move cargo between the dock and the landing platform and between the landing platform and the designated location in said tier on the ship.
Claim 10
Independent Claim 161 words
A method of moving cargo between a dock and a designated location on a ship, said method being performed with a quayside crane assembly which has a landing platform, a waterside trolley for moving cargo between the ship and the landing platform, and a landside trolley for moving cargo between the landing platform and the dock; said method including the steps of vertically moving the landing platform to an elevation which corresponds approximately to the higher of the following: (a) the elevation of the designated location in a tier on the ship where an article of cargo is to be unloaded or loaded, or (b) the elevation of the highest obstacle between the dock and the designated location in said tier, and operating said landside and waterside trolleys when the landing platform is at said elevation to move cargo between the dock and the landing platform and between the landing platform and the designated location in said tier on the ship.
Claim 11
Independent Claim 139 words
A method of moving cargo between a dock and a designated location in the hold of a ship, said method being performed by a quayside crane assembly, said crane assembly having a landing platform, a waterside trolley for moving cargo between the ship and the landing platform, and a landside trolley for moving cargo between the landing platform and the dock; said method including the steps of vertically moving the landing platform to an elevation which corresponds approximately to the elevation of the highest obstacle located between the dock and the designated location, operating said waterside trolley to move cargo between the designated location and the landing platform when the landing platform is at said elevation, and operating the landside trolley when the landing platform is at said elevation to move cargo between the dock and the landing platform.
Claim 12
Independent Claim 139 words
A method of moving cargo between a dock and a designated location in the hold of a ship, said method being performed by a quayside crane assembly, said crane assembly having a landing platform, a waterside trolley for moving cargo between the ship and the landing platform, and a landside trolley for moving cargo between the landing platform and the dock; said method including the steps of vertically moving the landing platform to an elevation which corresponds approximately to the elevation of the highest obstacle located between the dock and the designated location, operating said waterside trolley to move cargo between the designated location and the landing platform when the landing platform is at said elevation, and operating the landside trolley when the landing platform is at said elevation to move cargo between the dock and the landing platform.
Claim 13
Dependent Claim 155 words
The method of claim 8 including also the steps of operating the landside and waterside trolleys to move an article of above-deck cargo between the ship and the dock, said article of above-deck cargo being located at a second designated location on the ship, said method including the step of vertically moving the landing platform to a second elevation which corresponds approximately to the higher of the following: (a) the elevation of the second designated location in an above-deck tier on the ship where an article of cargo is to be unloaded or loaded, or (b) the elevation of the highest obstacle between the dock and the second designated location in said tier, and operating said landside and waterside trolleys when the landing platform is at said second elevation to move cargo between the dock and the landing platform and between the landing platform and the second designated location in said tier on the ship.

References Cited (Backward Citations)

US1192016A Cited
US1373464A Cited
US2050821A Cited
US3168955A Cited
US3812987A Cited
FR2303743A1 Cited
US3958106A Cited
US4046265A Cited
US4172685A Cited
US4106639A Cited
US4293077A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1989-07-07 1990-01-06 1990-07-08 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1993-07-07 1994-01-06 1994-07-08 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1997-07-07 1998-01-06 1998-07-08 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag