Patent US3101465A successfully refreshed from Google Patents.
Patent US4597693A successfully refreshed from Google Patents.
US4597693A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for installing highway drainage mat
Assignee: Solutia Inc
•
Filing: 1985-07-31
•
Granted: 1986-07-01
•
Expires: 2005-07-31
Abstract
Abstract Method and apparatus for inserting an elongated bendable drainage mat having a rectangular cross section below the surface of the ground in a vertical orientation in an advancing trench segment.
Inventors
- 👤 Charles R. McQuary
- 👤 Barry J. Dempsey
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 15:26
CPC Classifications
E; E02; E02F; E02F5/00; E02F5/02; E02F5/06; E02F5/10; E02F5/101
Claims Analysis
Total Claims: 5
Claim 1
Independent Claim
342 words
A method for installing an elongated drainage mat parallel to a road in a vertical orientation under a shoulder joint comprising (a) providing an elongated length of drainage mat comprising a water permeable fabric enveloping a core for fluid flow wherein when said mat is in a vertical orientation, said mat presents a rectangular transverse cross section with a height greater than its width; (b) excavating an advancing trench segment adjacent to the edge of a road surface under a shoulder joint wherein said trench has a depth greater than the height of said mat; (c) pulling a boot along the bottom of the excavated advancing trench segment, wherein said boot comprises (i) a housing having two parallel sides extending from the bottom of the trench to a height above the trench, a closed front end and open top and rear ends; (ii) a guide within said housing for horizontally pointing a vertically pointed drainage mat, said guide being positioned at an angle of about 45° from horizontal wherein the upper end of the guide is forward of the lower end of the guide so that, as the drainage mat passes around said guide, the drainage mat can directly exit to the rear of the boot; (iii) means for laterally moving the vertically-oriented mat into contact with the roadside of the trench segment; and (iv) means for filling said excavated trench segment with material excavated from the advancing trench segment to hold a drainage may against the highway side of the trench segment; (d) feeding said length of drainage mat sequentially through the top of said boot, around said guide and out through the open rear end of the boot, wherein said drainage mat is deposited at the bottom of said excavated advancing trench segment in a vertical orientation against the roadside of the trench segment; and (e) filling the trailing end of the excavated advancing trench segment with material excavated from the advancing trench segment to hold said drainage mat in a vertical orientation against the roadside of the trench segment.
Claim 2
Independent Claim
342 words
A method for installing an elongated drainage mat parallel to a road in a vertical orientation under a shoulder joint comprising (a) providing an elongated length of drainage mat comprising a water permeable fabric enveloping a core for fluid flow wherein when said mat is in a vertical orientation, said mat presents a rectangular transverse cross section with a height greater than its width; (b) excavating an advancing trench segment adjacent to the edge of a road surface under a shoulder joint wherein said trench has a depth greater than the height of said mat; (c) pulling a boot along the bottom of the excavated advancing trench segment, wherein said boot comprises (i) a housing having two parallel sides extending from the bottom of the trench to a height above the trench, a closed front end and open top and rear ends; (ii) a guide within said housing for horizontally pointing a vertically pointed drainage mat, said guide being positioned at an angle of about 45° from horizontal wherein the upper end of the guide is forward of the lower end of the guide so that, as the drainage mat passes around said guide, the drainage mat can directly exit to the rear of the boot; (iii) means for laterally moving the vertically-oriented mat into contact with the roadside of the trench segment; and (iv) means for filling said excavated trench segment with material excavated from the advancing trench segment to hold a drainage may against the highway side of the trench segment; (d) feeding said length of drainage mat sequentially through the top of said boot, around said guide and out through the open rear end of the boot, wherein said drainage mat is deposited at the bottom of said excavated advancing trench segment in a vertical orientation against the roadside of the trench segment; and (e) filling the trailing end of the excavated advancing trench segment with material excavated from the advancing trench segment to hold said drainage mat in a vertical orientation against the roadside of the trench segment.
Claim 3
Dependent Claim
46 words
The method of claim 1 the means for directing one side of the trench segment of said boot comprises a tapered chute having an inlet corresponding to the open rear end of said boot and a horizontally offset outlet, said outlet being narrower than the inlet.
Claim 4
Dependent Claim
28 words
The method of claim 2 wherein said means for directing to one side of the trench segment further comprises a spring loaded vertical plate trailing said tapered chute.
Claim 5
Dependent Claim
44 words
The method of claim 1 wherein means for filling is positioned sufficiently close to said means for laterally moving that the mat is in contact with the roadside of the trench at the point where said excavated material is returned to the trench segment.
References Cited (Backward Citations)
US2192369A
Cited
US3292379A
Cited
GB982956A
Cited
US3182459A
Cited
US3327484A
Cited
US3590588A
Cited
US3830373A
Cited
US3876322A
Cited
DE2550735A1
Cited
US4043135A
Cited
US4028902A
Cited
US4397241A
Cited
US4440088A
Cited
DE3012980A1
Cited
EP0075993A1
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-06-30 | 1989-12-30 | 1990-07-01 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-06-30 | 1993-12-30 | 1994-07-01 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-06-30 | 1997-12-30 | 1998-07-01 | $7700.00 | Window Closed / Lapsed |