US4594132A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Chloride hydrometallurgical process for production of copper
Assignee: Freeport Minerals Corp
•
Filing: 1984-06-27
•
Granted: 1986-06-10
•
Expires: 2004-06-27
Abstract
Abstract A process for extractive metallurgy of metal sulfides, in particular copper sulfide ores, in which a metal sulfide mineral feed material is cocurrently oxidized in an aqueous cupric chloride solution in the presence of an oxidant to form a slurry containing a metal hydroxide precipitate; the slurry is leached with an acid; the leach solution is extracted with an organic extractant; the organic extractant is stripped with an aqueous stripping medium; and the copper is electrowon from the aqueous stripping medium. The large amount of acid required for the oxidation reaction is provided by the formation of the metal hydroxide precipitate.
Inventors
- 👤 Donald P. Satchell, Jr.
- 👤 John N. Gerlach
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 08:58
CPC Classifications
C; C01; C01G; C01G3/00; C01G3/003; C22; C22B; C22B15/00; C22B15/0063; C22B15/0065; C22B15/0067; C22B15/0069; C22B19/00; C22B19/20; C22B19/22; C22B23/00; C22B23/04; C22B23/0407; C22B23/0415; C22B23/0423; C22B3/00; C22B3/04; C22B3/06; C22B3/10; Y; Y02; Y02P; Y02P10/00; Y02P10/20
Claims Analysis
Total Claims: 18
Claim 1
Independent Claim
204 words
A process for extracting metals from metal sulfides, comprising the stepp of: (a) contacting a metal sulfide with a first solution which is an aqueous cupric chloride solution to leach the metal therefrom and to form a second solution containing said metal and cuprous chloride, while adding an oxidant to oxidize the cuprous chloride in said second solution, whereupon a metal hydroxide is precipitated in said second solution, the precipitation of said metal hydroxide resulting in the formation of hydrogen ions; (b) adding an acid to said second solution, thereby dissolving the metal hydroxide precipitate with said acid, thus forming a third solution in contact with a remaining metal sulfide; (c) separating the third solution from the remaining metal sulfide; (d) recycling a portion of the separated third solution to step (a); (e) extracting the metal remaining in the non-recycled portion of said separated third solution with an organic phase; (f) recycling raffinate from step (e) to step (b) for use as the acid; (g) stripping the metal from the organic phase with an aqueous stripping solution; (h) electrowinning the metal from the aqueous stripping solution; and (i) recycling spent electrolyte from step (h) for use as the aqueous stripping solution of step (g).
Claim 2
Dependent Claim
204 words
A process for extracting metals from metal sulfides, comprising the stepp of: (a) contacting a metal sulfide with a first solution which is an aqueous cupric chloride solution to leach the metal therefrom and to form a second solution containing said metal and cuprous chloride, while adding an oxidant to oxidize the cuprous chloride in said second solution, whereupon a metal hydroxide is precipitated in said second solution, the precipitation of said metal hydroxide resulting in the formation of hydrogen ions; (b) adding an acid to said second solution, thereby dissolving the metal hydroxide precipitate with said acid, thus forming a third solution in contact with a remaining metal sulfide; (c) separating the third solution from the remaining metal sulfide; (d) recycling a portion of the separated third solution to step (a); (e) extracting the metal remaining in the non-recycled portion of said separated third solution with an organic phase; (f) recycling raffinate from step (e) to step (b) for use as the acid; (g) stripping the metal from the organic phase with an aqueous stripping solution; (h) electrowinning the metal from the aqueous stripping solution; and (i) recycling spent electrolyte from step (h) for use as the aqueous stripping solution of step (g).
Claim 3
Dependent Claim
27 words
The process according to claim 1 wherein the ratio of chloride to cupric ions in the aqueous cupric chloride solution in step (a) is 3 or more.
Claim 4
Dependent Claim
57 words
The process according to claim 1 wherein a supplemental source of chloride ion is added to the aqueous cupric chloride solution and wherein the supplemental source of chloride ion is selected from the group consisting of CuCl 2 , CuCl, FeCl 2 , HCl, NH 4 Cl, NaCl, KCl, MgCl 2 , ZnCl 2 and mixtures thereof.
Claim 5
Dependent Claim
33 words
The process according to claim 1 wherein the oxidant is selected from the group consisting of oxygen, air, NaOCl, NaClO 2 , NaClO 3 , Cl 2 and H 2 O 2 .
Claim 6
Dependent Claim
24 words
The process according to claim 1 wherein the metal sulfide is selected from the group consisting of chalcopyrite, chalcocite, covellite, bornite and mixtures thereof.
Claim 7
Dependent Claim
16 words
The process as claimed in claim 1 wherein the metal precipitate is a copper hydroxy chloride.
Claim 8
Dependent Claim
33 words
The process according to claim 1 wherein step (a) is carried out at atmospheric pressure and at a temperature between about 70° C. and the boiling point of the aqueous cupric chloride solution.
Claim 9
Dependent Claim
22 words
The process according to claim 7 wherein step (a) is carried out at a temperature between about 80° C. and 95° C.
Claim 10
Dependent Claim
19 words
The process according to claim 1 wherein step (e) is carried out at a temperature below about 50° C.
Claim 11
Dependent Claim
22 words
The process according to claim 1 wherein step (e) is carried out at a temperature between about 35° C. and 45° C.
Claim 12
Dependent Claim
20 words
The process according to claim 1 wherein a zinc salt is added to the non-recycled aqueous phase of step (c).
Claim 13
Dependent Claim
19 words
The process according to claim 1 wherein sulfate ions are added to the non-recycled aqueous phase of step (c).
Claim 14
Dependent Claim
20 words
The process of claim 1, wherein said metal is selected from the group consisting of copper, nickel, cobalt and zinc.
Claim 15
Dependent Claim
248 words
A process for extracting copper from copper sulfide ore or copper-iron sulfide ore comprising the steps of: (a) contacting the ore with a first solution which is an aqueous cupric chloride solution having a chloride to cupric ion ratio of 3 or more, said contacting being performed at atmospheric pressure and at a temperature between about 70° C. and the boiling point of the aqueous cupric chloride solution to leach copper therefrom and to form a second solution containing said copper, while adding oxygen to oxidize the leached copper in said second solution, whereupon a copper hydroxy chloride is precipitated in said second solution, the precipitation of said copper hydroxy chloride resulting in the formation of hydrogen ions; (b) adding an acid to said second solution, thereby dissolving the copper hydroxy chloride precipitate with said acid, thus forming a third solution in contact with a remaining metal ore; (c) separating the third solution from the remaining ore; (d) recycling a portion of the separated third solution to step (a); (e) extracting the copper remaining in the non-recycled portion of said separated third solution with an organic phase at a temperature below about 50° C.; (f) recycling raffinate from step (e) to step (b) for use as the acid; (g) stripping the copper from the organic phase with an aqueous stripping solution; (h) electrowinning the copper from the aqueous stripping solution; and (i) recycling spent electrolyte from step (h) for use as the aqueous stripping solution of step (g).
Claim 16
Dependent Claim
248 words
A process for extracting copper from copper sulfide ore or copper-iron sulfide ore comprising the steps of: (a) contacting the ore with a first solution which is an aqueous cupric chloride solution having a chloride to cupric ion ratio of 3 or more, said contacting being performed at atmospheric pressure and at a temperature between about 70° C. and the boiling point of the aqueous cupric chloride solution to leach copper therefrom and to form a second solution containing said copper, while adding oxygen to oxidize the leached copper in said second solution, whereupon a copper hydroxy chloride is precipitated in said second solution, the precipitation of said copper hydroxy chloride resulting in the formation of hydrogen ions; (b) adding an acid to said second solution, thereby dissolving the copper hydroxy chloride precipitate with said acid, thus forming a third solution in contact with a remaining metal ore; (c) separating the third solution from the remaining ore; (d) recycling a portion of the separated third solution to step (a); (e) extracting the copper remaining in the non-recycled portion of said separated third solution with an organic phase at a temperature below about 50° C.; (f) recycling raffinate from step (e) to step (b) for use as the acid; (g) stripping the copper from the organic phase with an aqueous stripping solution; (h) electrowinning the copper from the aqueous stripping solution; and (i) recycling spent electrolyte from step (h) for use as the aqueous stripping solution of step (g).
Claim 17
Dependent Claim
20 words
The process according to claim 14 wherein a zinc salt is added to the non-recycled aqueous phase of step (c).
Claim 18
Dependent Claim
19 words
The process according to claim 14 wherein sulfate ions are added to the non-recycled aqueous phase of step (c).
References Cited (Backward Citations)
US1195616A
Cited
US86754A
Cited
US364174A
Cited
US415576A
Cited
US415738A
Cited
US507130A
Cited
US552960A
Cited
US290548A
Cited
GB189509052A
Cited
US704639A
Cited
US740014A
Cited
GB191113499A
Cited
US1148798A
Cited
US1263727A
Cited
US1251485A
Cited
US1539712A
Cited
US1539714A
Cited
US1528207A
Cited
US1570777A
Cited
US1588806A
Cited
US1757047A
Cited
GB276008A
Cited
US2008373A
Cited
US2046937A
Cited
US2586579A
Cited
US2647830A
Cited
US2647832A
Cited
US2647831A
Cited
US3260593A
Cited
US3194653A
Cited
US3353950A
Cited
US3288599A
Cited
US3490899A
Cited
US3476554A
Cited
US3436177A
Cited
US3637372A
Cited
US3669650A
Cited
US3674424A
Cited
US3630722A
Cited
US3642435A
Cited
US3692647A
Cited
US3673061A
Cited
US3767543A
Cited
US3879272A
Cited
US3785944A
Cited
US3798026A
Cited
US3764490A
Cited
US3896208A
Cited
US3888748A
Cited
US3776826A
Cited
US3880732A
Cited
US3923616A
Cited
US3998628A
Cited
US4230487A
Cited
US4023964A
Cited
US3957602A
Cited
US3951649A
Cited
US4011146A
Cited
US3922167A
Cited
US3901776A
Cited
US4013457A
Cited
US3972711A
Cited
US4288304A
Cited
US4026772A
Cited
US4039324A
Cited
US4097271A
Cited
US4107009A
Cited
US4070182A
Cited
US4053305A
Cited
US4124379A
Cited
US4101315A
Cited
US4115221A
Cited
US4341742A
Cited
US4337128A
Cited
US4384890A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-06-09 | 1989-12-09 | 1990-06-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-06-09 | 1993-12-09 | 1994-06-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-06-09 | 1997-12-09 | 1998-06-10 | $7700.00 | Window Closed / Lapsed |