Patent US4589255A successfully refreshed from Google Patents.
US4589255A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Adaptive temperature control system for the supply of steam to a steam turbine
Assignee: Westinghouse Electric Corp
•
Filing: 1984-10-25
•
Granted: 1986-05-20
•
Expires: 2004-10-25
Abstract
Abstract The invention relates to a combined heat recovery steam generator and steam turbine. An adaptive temperature controller establishes a target temperature for controlling the boiler temperature so that the steam admitted on the boiler follows a constant enthalpy when trying to match temperature of steam and rotor temperature.
Inventors
- 👤 Alan Martens
- 👤 Gerry A. Myers
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 08:14
CPC Classifications
F; F01; F01D; F01D19/00; F01D19/02; F01D17/00; F01D17/02; F01D17/08; F01D17/085; F01K; F01K13/00; F01K13/02; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01K23/103; F01K23/105; Y; Y02; Y02E; Y02E20/00; Y02E20/16; Y02T; Y02T50/00; Y02T50/60
Claims Analysis
Total Claims: 3
Claim 1
Independent Claim
182 words
In a combined-cycle steam turbine power generating plant including a heat recovery steam generator for outputting steam at an instantaneous temperature and pressure, and a steam turbine having rotor expanding steam therethrough from said steam generator; means providing a signal representative of the temperature of the rotor of the turbine; and means for controlling the generation of steam by said steam generator to control the temperature of steam in accordance with a predetermined temperature gradient, the combination of: function generator means responsive to a signal representative of steam turbine throttle pressure for providing a throttle pressure related steam limit temperature according to a constant enthalpy characteristic; bias means responsive to said rotor temperature representative signal for providing a bias signal in excess of said rotor temperature signal by a predetermined amount; means responsive to the larger of said limit temperature signal and said bias signal for controlling the generation of steam by said steam generator to control the temperature of steam to iteratively raise the temperature of the rotor in accordance with said constant enthalpy characteristic and said bias signal during soaking.
Claim 2
Dependent Claim
182 words
In a combined-cycle steam turbine power generating plant including a heat recovery steam generator for outputting steam at an instantaneous temperature and pressure, and a steam turbine having rotor expanding steam therethrough from said steam generator; means providing a signal representative of the temperature of the rotor of the turbine; and means for controlling the generation of steam by said steam generator to control the temperature of steam in accordance with a predetermined temperature gradient, the combination of: function generator means responsive to a signal representative of steam turbine throttle pressure for providing a throttle pressure related steam limit temperature according to a constant enthalpy characteristic; bias means responsive to said rotor temperature representative signal for providing a bias signal in excess of said rotor temperature signal by a predetermined amount; means responsive to the larger of said limit temperature signal and said bias signal for controlling the generation of steam by said steam generator to control the temperature of steam to iteratively raise the temperature of the rotor in accordance with said constant enthalpy characteristic and said bias signal during soaking.
Claim 3
Dependent Claim
50 words
The plant of claim 1, with ramping means operative after termination of soaking and when the plant breaker is closed for providing for said steam generation controlling means a predetermined maximum temperature and for establishing said temperature gradient thereto; said limit temperature signal and bias signal responsive means being disabled.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1989-05-19 | 1989-11-18 | 1990-05-20 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1993-05-19 | 1993-11-18 | 1994-05-20 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1997-05-19 | 1997-11-18 | 1998-05-20 | $7700.00 | Window Closed / Lapsed |