Abstract A method of controlling the operation of a thermoelectric power generating plant, in which the operation of the steam generating equipment and the turbine is controlled in accordance with the plant operation parameters obtained from given patterns of start up and operation of the plant. The method comprises: temporarily setting, in accordance with the above-mentioned patterns, the plant operation parameters concerning the rates of change of state of the plant such as the rates of turbine acceleration and turbine load and rates of increase of the main steam temperature and pressure; estimating the change of the quantity of state of main steam at a designated future moment; estimating the thermal stresses in respective stress-evaluation portions of the boiler and turbine; comparing the estimated thermal stresses with respective allowable thermal stresses determined so as to correspond to the consumption of the life allowed for each start up and operation cycle of the plant; selecting one of the estimated thermal stresses which has smaller margin to the allowable thermal stress and obtaining the operation parameter which provided the maximum rate of change of the state of the plant; repeating these steps until the command state is attained; and controlling the boiler and the turbine in accordance with the thus obtained plant operation parameter.

Inventors

  • 👤 Sadao Yanada
  • 👤 Naganobu Honda
  • 👤 Hisanori Miyagaki
  • 👤 Seiitsu Nigawara

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 06:11
CPC Classifications
F; F22; F22B; F22B35/00; F22B35/18; F01; F01K; F01K13/00; F01K13/02

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 116 words
A method of controlling the operation of a thermoelectric power generating plant having a boiler for generating steam and a steam turbine driven by said steam, for operating the plant within minimum time taking into consideration the thermal stress occurring in the metals of various parts of the plant, the method comprising: estimating the thermal stresses at a future moment in stress-evaluation portions assumed on metal portions of said boiler and said turbine; selecting one of the estimated thermal stresses in accordance with the state of operation of said thermoelectric power generating plant; and controlling the boiler steam temperature or load and speed of the turbine are controlled in accordance with the selected estimated thermal stress.
Claim 2
Independent Claim 116 words
A method of controlling the operation of a thermoelectric power generating plant having a boiler for generating steam and a steam turbine driven by said steam, for operating the plant within minimum time taking into consideration the thermal stress occurring in the metals of various parts of the plant, the method comprising: estimating the thermal stresses at a future moment in stress-evaluation portions assumed on metal portions of said boiler and said turbine; selecting one of the estimated thermal stresses in accordance with the state of operation of said thermoelectric power generating plant; and controlling the boiler steam temperature or load and speed of the turbine are controlled in accordance with the selected estimated thermal stress.
Claim 3
Dependent Claim 42 words
A method of controlling the operation of a thermoelectric power generating plant according to claim 1, wherein said stress-evaluation portion of said boiler is the corner portion of the tube header of the outlet side of a secondary superheater of said boiler.
Claim 4
Dependent Claim 42 words
A method of controlling the operation of a thermoelectric power generating plant according to claim 1, wherein said stress-evaluation portion of said turbine is the portion of the turbine rotor adjacent to the labyrinth packing at the steam inlet to the turbine.
Claim 5
Dependent Claim 55 words
A method of controlling the operation of a thermoelectric power generating plant according to claim 1, characterized in that the boiler steam temperature is controlled in accordance with the estimated thermal stress in said stress-evaluation portion of said boiler, when the turbine is in the state after setting of fire till steaming to the turbine.
Claim 6
Dependent Claim 48 words
A method of controlling the operation of a thermoelectric power generating plant according to claim 1, wherein the turbine speed is controlled in accordance with the estimated thermal stress in the turbine, when the turbine is in the state after the steaming thereto to the application of load.
Claim 7
Dependent Claim 60 words
A method of controlling the operation of a thermoelectric power generating plant according to claim 1, characterized in that the boiler steam temperature is controlled in accordance with the estimated stress in the stress-estimation portion of the boiler, when the turbine is in the state after the application of load to the finish of change-over of the steam regulating valve.
Claim 8
Dependent Claim 81 words
A method of controlling the operation of a thermoelectric power generating plant according to claim 1, characterized in that the boiler steam temperature or the turbine load is controlled on the basis of one of the estimated thermal stresses in the stress-estimation portions of the boiler and turbine which has the smaller margin to the allowable stress value, when the turbine is in the state after the finish of change-over of the steam regulating valve and the application of full load.

References Cited (Backward Citations)

US4053747A Cited
US4181840A Cited
US4228359A Cited
US4425762A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-12-09 1989-06-10 1989-12-10 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-12-09 1993-06-10 1993-12-10 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-12-09 1997-06-10 1997-12-10 $7700.00 Window Closed / Lapsed