System for initializing a backup computer in a multiple computer electric power plant and turbine control system to provide turbine and plant operation with reduced time for backup computer availability

Assignee: Westinghouse Electric Corp
•
Filing: 1973-11-06
•
Granted: 1977-10-11
•
Expires: 1993-11-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An electric power plant including a steam generator and a steam turbine is operated by a control system including two redundant digital computers. Switching circuitry is provided for coupling one of the computers through interface equipment to the steam generator and the turbine and a generator according to programmed computer control. A data link is established between the computers to transfer manual/automatic status and other needed data from the control computer to the standby computer. A system is provided for detecting when certain hardware and software malfunctions have occurred and for responsively transferring control to the standby computer. The standby computer is tracked to the control computer so that control computer transfer can be made reliably without disturbing the electric power generation process. In order to provide for making a noncontrolling computer available for control in a reliable and fast manner after it has been stopped for any reason, the system is arranged to structure the noncontrolling computer with certain initializing data over the data link. The initialization data includes turbine rotor stress calculated variables and other variables including boiler and turbine logicals and calibration variables.

Inventors

  • 👤 Guy E. Davis

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 14:50
CPC Classifications
F; F01; F01K; F01K13/00; F01K13/02; F01K7/00; F01K7/16; F01K7/22; F01K7/24

Claims Analysis

Total Claims: 55
Claim 1
Independent Claim 277 words
A control system for an electric power plant having at least one steam turbine and a steam generator, said control system comprising at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam generator, means for generating input signals representing predetermined process variables associated with said steam turbine, means for coupling the input signals to both of said computers, each of said computers having means for controlling its sequential programmed operation and including substantially identical means for generating control outputs for operating controllable elements of said steam generator and throttle and governor valves of said steam turbine as a function of the input signals, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate the steam generator controllable elements and the turbine valves, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating predetermined control outputs in the other computer substantially equal to corresponding ones from said one computer, means for data linking said computers, each of said computers including means for initializing itself after a stoppage including means for transferring the status of predetermined initialization variables over said data link means from one of said computers in control to the other computer being initialized, and means for executing a transfer in the control of the steam generator and the turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction and after said other computer is initialized.
Claim 2
Dependent Claim 277 words
A control system for an electric power plant having at least one steam turbine and a steam generator, said control system comprising at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam generator, means for generating input signals representing predetermined process variables associated with said steam turbine, means for coupling the input signals to both of said computers, each of said computers having means for controlling its sequential programmed operation and including substantially identical means for generating control outputs for operating controllable elements of said steam generator and throttle and governor valves of said steam turbine as a function of the input signals, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate the steam generator controllable elements and the turbine valves, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating predetermined control outputs in the other computer substantially equal to corresponding ones from said one computer, means for data linking said computers, each of said computers including means for initializing itself after a stoppage including means for transferring the status of predetermined initialization variables over said data link means from one of said computers in control to the other computer being initialized, and means for executing a transfer in the control of the steam generator and the turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction and after said other computer is initialized.
Claim 3
Dependent Claim 51 words
A plant control system as set forth in claim 1 wherein an operator panel having means for generating control mode selection signals and means for generating parameter value signals, means are provided for coupling the panel signals to said computers, and said initialization variables include variables corresponding to the panel signals.
Claim 4
Dependent Claim 34 words
A plant control system as set forth in claim 2 wherein said initialization variables include predetermined control parameters associated with said control output generating means and being modifiable by signals from said operator panel.
Claim 5
Dependent Claim 32 words
A plant control system as set forth in claim 3 wherein said initialization variables include predetermined logical variables associated with said steam generator and being modifiable by signals from said operator panel.
Claim 6
Dependent Claim 57 words
A plant control system as set forth in claim 4 wherein at least some of said steam generator controls are automatic controls provided with manual backup controls, said operator panel includes means for generating signals to switch the controls between automatic and manual operation, and said initialization variables include logical variables representing the manual/automatic status of controls.
Claim 7
Dependent Claim 40 words
A plant control system as set forth in claim 3 wherein said control parameters include at least gains and time constants and limits associated with turbine and steam generator controls and wherein said initialization variables include control mode selector variables.
Claim 8
Dependent Claim 16 words
A method as set forth in claim 6 wherein the initializating data includes predetermined calculated variables.
Claim 9
Dependent Claim 44 words
A method as set forth in claim 6 wherein an operator panel is used to generate control mode selection signals and control parameter value signals for computer entry, and the initializing data includes data corresponding to the mode selection and control parameter value signals.
Claim 10
Dependent Claim 130 words
A plant control system as set forth in claim 1 wherein said control output generating means including means for generating a speed or load reference, means for generating a speed or load demand from the speed or load reference and the actual speed or load, means responsive to the speed or load demand for generating the control outputs for the valves and substantially satisfying the speed or load reference, the process input signals include at least one signal representing a turbine temperature used in rotor stress calculations, said speed or load reference generating means includes means for limiting the rate at which the reference changes as a function of rotor stress derived from the temperature signal, and said initialization variables include predetermined calculation variables associated with said rate limiting means.
Claim 11
Dependent Claim 76 words
A plant control system as set forth in claim 9 wherein an operator panel having means for generating turbine control mode selection signals and means for generating parameter value signals, means are provided for coupling the panel signals to said computers, and said initialization variables include variables corresponding to the panel signals wherein said initialization variables include predetermined control parameters associated with said control output generating means and being modifiable by signals from said operator panel.
Claim 12
Dependent Claim 335 words
A steam turbine system operative to receive motive steam and drive an electric generator and produce electric power, said turbine comprising a plurality of turbine sections, a plurality of throttle and governor valves for directing steam through said turbine sections, and a control system including at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam turbine including speed and load, means for coupling the input signals to both of said computers, each of said computers having means for controlling its sequential programmed operation and including substantially identical means for generating control outputs for operating said throttle and governor valves of said steam turbine as a function of the input signals, said control output generating means including means for generating a speed or load reference, means for generating a speed or load demand from the speed or load reference and the actual speed or load, means responsive to the speed or load demand for generating the control outputs for the valves and substantially satisfying the speed or load reference, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate said steam turbine valves, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating predetermined turbine control outputs in the other computer substantially equal to corresponding ones from said one computer, means for data linking said computers, each of said computers including means for initializing itself after a stoppage including means for transferring the status of predetermined initialization variables over said data link means from one of said computers in control to the other computer being initialized, and means for executing a transfer in the control of the steam turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction and after said other computer is initialized.
Claim 13
Dependent Claim 335 words
A steam turbine system operative to receive motive steam and drive an electric generator and produce electric power, said turbine comprising a plurality of turbine sections, a plurality of throttle and governor valves for directing steam through said turbine sections, and a control system including at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam turbine including speed and load, means for coupling the input signals to both of said computers, each of said computers having means for controlling its sequential programmed operation and including substantially identical means for generating control outputs for operating said throttle and governor valves of said steam turbine as a function of the input signals, said control output generating means including means for generating a speed or load reference, means for generating a speed or load demand from the speed or load reference and the actual speed or load, means responsive to the speed or load demand for generating the control outputs for the valves and substantially satisfying the speed or load reference, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate said steam turbine valves, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating predetermined turbine control outputs in the other computer substantially equal to corresponding ones from said one computer, means for data linking said computers, each of said computers including means for initializing itself after a stoppage including means for transferring the status of predetermined initialization variables over said data link means from one of said computers in control to the other computer being initialized, and means for executing a transfer in the control of the steam turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction and after said other computer is initialized.
Claim 14
Dependent Claim 55 words
A turbine system as set forth in claim 11, wherein said control system includes an operator panel having means for generating turbine control mode selection signals and means for generating parameter value signals, means are provided for coupling the panel signals to said computers, and said initialization variables include variables corresponding to the panel signals.
Claim 15
Dependent Claim 35 words
A turbine system as set forth in claim 12 wherein said initialization variables include predetermined calibration variables associated with said speed or load demand generating means and being modifiable by signals from said operator panel.
Claim 16
Dependent Claim 51 words
A turbine system as set forth in claim 13 wherein said load demand generating means includes an impulse pressure control, the process input signals include a signal representation of turbine impulse pressure for application to said impulse pressure control, and said initialization variables include at least one impulse pressure calibration variable.
Claim 17
Dependent Claim 51 words
A turbine system as set forth in claim 13 wherein said load demand generating means includes an electrical load control, the process input signals include a signal representative of generated electrical load for application to said electrical load control, and said initialization variables include at least one electrical load calibration variable.
Claim 18
Dependent Claim 30 words
A turbine system as set forth in claim 13 wherein said speed demand generating means includes a speed control and said initialization data includes at least one speed calibration variable.
Claim 19
Dependent Claim 71 words
A turbine system as set forth in claim 13 wherein the process input signals include at least one signal representing a turbine temperature used in rotor stress calculations, said speed or load reference generating means includes means for limiting the rate at which the reference changes as a function of rotor stress derived from the temperature signal, and said initialization variables include predetermined calculation variables associated with said rate limiting means.
Claim 20
Dependent Claim 35 words
A turbine system as set forth in claim 12 wherein said initialization variables includes predetermined control parameters associated with said speed or load demand generating means and being modifiable by signals from said operator panel.
Claim 21
Dependent Claim 17 words
A turbine system as set forth in claim 18 wherein the control parameters include predetermined controller gains.
Claim 22
Dependent Claim 18 words
A turbine system as set forth in claim 18 wherein the control parameters include predetermined controller time constants.
Claim 23
Dependent Claim 17 words
A turbine system as set forth in claim 18 wherein the control parameters include predetermined controller deadbands.
Claim 24
Dependent Claim 20 words
A turbine system as set forth in claim 18 wherein the control parameters include predetermined controller high and low limits.
Claim 25
Dependent Claim 71 words
A turbine system as set forth in claim 18 wherein the process input signals include at least one signal representing a turbine temperature used in rotor stress calculations, said speed or load reference generating means includes means for limiting the rate at which the reference changes as a function of rotor stress derived from the temperature signal, and said initialization variables include predetermined calculation variables associated with said rate limiting means.
Claim 26
Dependent Claim 20 words
A turbine system as set forth in claim 23 wherein the control parameters include predetermined controller gains and time constants.
Claim 27
Dependent Claim 71 words
A turbine system as set forth in claim 12 wherein the process input signals include at least one signal representing a turbine temperature used in rotor stress calculations, said speed or load reference generating means includes means for limiting the rate at which the reference changes as a function of rotor stress derived from the temperature signal, and said initialization variables include predetermined calculation variables associated with said rate limiting means.
Claim 28
Dependent Claim 71 words
A turbine system as set forth in claim 11 wherein the process input signals include at least one signal representing a turbine temperature used in rotor stress calculations, said speed or load reference generating means includes means for limiting the rate at which the reference changes as a function of rotor stress derived from the temperature signal, and said initialization variables include predetermined calculation variables associated with said rate limiting means.
Claim 29
Dependent Claim 24 words
A turbine system as set forth in claim 26 wherein said initialization variables further include predetermined calibration values associated with said rate limiting means.
Claim 30
Independent Claim 234 words
A method for operating an electric power plant having at least a steam generator and a steam turbine having throttle and governor valves and a control system which includes at least two digital computers, the steps of said method comprising generating input signals representing predetermined process variables associated with said steam generator, generating input signals representing predetermined process variables associated with said steam turbine, coupling the input signals to both of said computers, operating said computers with substantially identical programs to generate control outputs for operating controllable elements of said steam generator and the throttle and governor valves of said steam turbine, coupling the outputs of one of said computers to operate the steam generator controllable elements and turbine valves, sensing predetermined control system malfunctions, in the controlling system and registering the same in the one computer, substantially conforming the structure of the other computer to that of the one computer in real time including generating control outputs in the other computer substantially equal to those from said one computer, linking predetermined initializing data from one of the computer in control to the other computer when the other computer is being started, and executing a transfer in the control of the steam generator and the turbine from said one computer to said other computer substantially without disturbing the power generation when a control system malfunction is detected and after the other computer is initialized.
Claim 31
Independent Claim 234 words
A method for operating an electric power plant having at least a steam generator and a steam turbine having throttle and governor valves and a control system which includes at least two digital computers, the steps of said method comprising generating input signals representing predetermined process variables associated with said steam generator, generating input signals representing predetermined process variables associated with said steam turbine, coupling the input signals to both of said computers, operating said computers with substantially identical programs to generate control outputs for operating controllable elements of said steam generator and the throttle and governor valves of said steam turbine, coupling the outputs of one of said computers to operate the steam generator controllable elements and turbine valves, sensing predetermined control system malfunctions, in the controlling system and registering the same in the one computer, substantially conforming the structure of the other computer to that of the one computer in real time including generating control outputs in the other computer substantially equal to those from said one computer, linking predetermined initializing data from one of the computer in control to the other computer when the other computer is being started, and executing a transfer in the control of the steam generator and the turbine from said one computer to said other computer substantially without disturbing the power generation when a control system malfunction is detected and after the other computer is initialized.
Claim 32
Dependent Claim 322 words
A control system for a steam turbine having a plurality of turbine sections and a plurality of throttle and governor valves for directing steam through said turbine sections, said control system comprising at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam turbine including speed and load, means for coupling the input signals to both of said computers, each of said computers having means for controlling its sequential programmed operation and including substantially identical means for generating control outputs for operating said throttle and governor valves of said steam turbine as a function of the input signals, said control output generating means including means for generating a speed or load reference, means for generating a speed or load demand from the speed or load reference and the actual speed or load, means responsive to the speed or load demand for generating the control outputs for the valves and substantially satisfying the speed or load reference, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate said steam turbine valves, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating predetermined turbine control outputs in the other computer substantially equal to corresponding ones from said one computer, meams for data linking said computers, each of said computers including means for initializing itself after a stoppage including means for transferring the status of predetermined initialization variables over said data link means from one of said computers in control to the other computer being initialized, and means for executing a transfer in the control of the steam turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction and after said other computer is initialized.
Claim 33
Dependent Claim 322 words
A control system for a steam turbine having a plurality of turbine sections and a plurality of throttle and governor valves for directing steam through said turbine sections, said control system comprising at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam turbine including speed and load, means for coupling the input signals to both of said computers, each of said computers having means for controlling its sequential programmed operation and including substantially identical means for generating control outputs for operating said throttle and governor valves of said steam turbine as a function of the input signals, said control output generating means including means for generating a speed or load reference, means for generating a speed or load demand from the speed or load reference and the actual speed or load, means responsive to the speed or load demand for generating the control outputs for the valves and substantially satisfying the speed or load reference, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate said steam turbine valves, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating predetermined turbine control outputs in the other computer substantially equal to corresponding ones from said one computer, meams for data linking said computers, each of said computers including means for initializing itself after a stoppage including means for transferring the status of predetermined initialization variables over said data link means from one of said computers in control to the other computer being initialized, and means for executing a transfer in the control of the steam turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction and after said other computer is initialized.
Claim 34
Dependent Claim 54 words
A control system as set forth in claim 29 wherein there is provided an operator panel having means for generating turbine control mode selection signals and means for generating parameter value signals, means are provided for coupling the panel signals to said computers, and said initialization variables include variables corresponding to the panel signals.
Claim 35
Dependent Claim 71 words
A control system as set forth in claim 30 wherein the process input signals include at least one signal representing a turbine temperature used in rotor stress calculations, said speed or load reference generating means includes means for limiting the rate at which the reference changes as a function of rotor stress derived from the temperature signal, and said initialization variables include predetermined calculation variables associated with said rate limiting means.
Claim 36
Dependent Claim 24 words
A control system as set forth in claim 31 wherein said initialization variables further include predetermined calibration values associated with said rate limiting means.
Claim 37
Dependent Claim 71 words
A control system as set forth in claim 31 wherein the process input signals include at least one signal representing a turbine temperature used in rotor stress calculations, said speed or load reference generating means includes means for limiting the rate at which the reference changes as a function of rotor stress derived from the temperature signal, and said initialization variables include predetermined calculation variables associated with said rate limiting means.
Claim 38
Dependent Claim 35 words
A control system as set forth in claim 30 wherein said initialization variables include predetermined calibration variables associated with said speed or load demand generating means and being modifiable by signals from said operator panel.
Claim 39
Dependent Claim 35 words
A control system as set forth in claim 30 wherein said initialization variables include predetermined control parameters associated with said speed or load demand generating means and being modifidable by signals from said operator panel.
Claim 40
Dependent Claim 58 words
A control system as set forth in claim 35 wherein said load demand generating means includes an impluse pressure control, the process input signals include a signal representation of turbine impulse pressure for application to said impulse pressure control, and said initialization variables include at least gain and high and low limit variables for the impulse pressure control.
Claim 41
Dependent Claim 58 words
A control system as set forth in claim 35 wherein said load demand generating means includes an electrical load control, the process input signals include a signal representative of generated electrical load for application to said electrical load control, and said initialization variables include at least gain and high and low limit variables for the electrical load control.
Claim 42
Dependent Claim 37 words
A control system as set forth in claim 26 wherein said speed demand generating means includes a speed control and said initialization data include at least gain and high and low limit variables for the speed control.
Claim 43
Dependent Claim 70 words
A control system as set forth in claim 35 wherein the process input signals include at least one signal representing a temperature used in rotor stress calculations, said speed or load reference generating means includes means for limiting the rate at which the reference changes as a function of rotor stress derived from the temperature signal, and said initialization variables include predetermined calculation variables associated with said rate limiting means.
Claim 44
Dependent Claim 35 words
A control system as set forth in claim 39 wherein said initialization variables include predetermined calibration variables associated with said speed or load demand generating means and being modifiable by signals from said operator panel.
Claim 45
Dependent Claim 276 words
A control system for a steam generator in an electric power plant, said control system comprising at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam generator, means for coupling the input signals to both of said computers, each of said computers having means for controlling its sequential programmed operation and including substantially identical means for generating control outputs for operating controllable elements of said steam generator as a function of the input signals, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate the steam generator controllable elements, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating predetermined control outputs in the other computer, substantially equal to corresponding ones from said one computer, and said control output generating means including a plurality of controls for respective predetermined steam generator controlled variables which affect the production of steam for the plant by said steam generator, means for data linking said computer, each of said computers including means for initializing itself after a stoppage including means for transferring the status of predetermined initialization variables over said data link means from one of said computers in control to the other computer being initialized, and means for executing a transfer in the control of the steam generator from said one computer to said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction and after said other computer is initialized.
Claim 46
Dependent Claim 276 words
A control system for a steam generator in an electric power plant, said control system comprising at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam generator, means for coupling the input signals to both of said computers, each of said computers having means for controlling its sequential programmed operation and including substantially identical means for generating control outputs for operating controllable elements of said steam generator as a function of the input signals, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate the steam generator controllable elements, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating predetermined control outputs in the other computer, substantially equal to corresponding ones from said one computer, and said control output generating means including a plurality of controls for respective predetermined steam generator controlled variables which affect the production of steam for the plant by said steam generator, means for data linking said computer, each of said computers including means for initializing itself after a stoppage including means for transferring the status of predetermined initialization variables over said data link means from one of said computers in control to the other computer being initialized, and means for executing a transfer in the control of the steam generator from said one computer to said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction and after said other computer is initialized.
Claim 47
Dependent Claim 57 words
A steam generator control system as set forth in claim 41 wherein there is provided an operator panel having means for generating steam generator control mode selection signals and means for generating parameter value signals, means are provided for coupling the panel signals to said computers, and said initialization variables include variables corresponding to the panel signals.
Claim 48
Dependent Claim 32 words
A steam generator control system as set forth in claim 42 wherein said initialization variables include predetermind calibration variables associated with said controls and being modifiable by signals from said operator panel.
Claim 49
Dependent Claim 32 words
A steam generator control system as set forth in claim 42 wherein said initialization variables include predetermined control parameters associated with said controls and being modifiable by signals from said operator panel.
Claim 50
Dependent Claim 22 words
A steam generator control system as set forth in claim 49 wherein said control parameters include setpoints for the steam generator controls.
Claim 51
Dependent Claim 22 words
A steam generator control system as set forth in claim 44 wherein said control parameters include limits for the steam generator controls.
Claim 52
Dependent Claim 23 words
A steam generator control system as set forth in claim 44 wherein said control parameters include analog input values for the steam generator.
Claim 53
Dependent Claim 33 words
A steam generator control system as set forth in claim 42 wherein said initialization variables include predetermined logical variables associated with said steam generator and being modifiable by signals from said operator panel.
Claim 54
Dependent Claim 58 words
A steam generator control system as set forth in claim 48 wherein at least some of said steam generator controls are automatic controls provided with manual backup controls, said operator panel includes means for generating signals to switch the controls between automatic and manual operation, and said initialization variables include logical variables representing the manual/automatic status of controls.
Claim 55
Dependent Claim 31 words
A steam generator control system as set forth in claim 48 wherein said logical variables include predetermined calculated variables representing whether particular controls are rejected or retained in an automatic mode.

References Cited (Backward Citations)

US3564273A Cited
US3555251A Cited
US3588265A Cited
US3561216A Cited
US3552872A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1980-10-10 1981-04-11 1981-10-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1984-10-10 1985-04-11 1985-10-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1988-10-10 1989-04-11 1989-10-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag