Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
120 words
A method for placing a perforated liner in a well penetrating a reservior containing a high pressure fluid comprising: (a) inserting, into openings in the sidewall of the liner, solid hollow plugs capable of withstanding a pressure differential wherein the pressure on the outside of the liner is greater than the pressure on the inside of the liner, said plugs each having a head end protruding into the interior of the liner and a flange portion in contact with the exterior of the liner; (b) running the plug-containing liner into the well; and (c) running a cutting or scraping tool down the inside of the liner to remove the heads of the plugs and open the openings in the liner.
Claim 2
Independent Claim
120 words
A method for placing a perforated liner in a well penetrating a reservior containing a high pressure fluid comprising: (a) inserting, into openings in the sidewall of the liner, solid hollow plugs capable of withstanding a pressure differential wherein the pressure on the outside of the liner is greater than the pressure on the inside of the liner, said plugs each having a head end protruding into the interior of the liner and a flange portion in contact with the exterior of the liner; (b) running the plug-containing liner into the well; and (c) running a cutting or scraping tool down the inside of the liner to remove the heads of the plugs and open the openings in the liner.
Claim 3
Dependent Claim
31 words
The method defined in claim 1 wherein fluid is produced from the reservior via the well around the outside of the liner while the liner is being run into the well.
Claim 4
Dependent Claim
15 words
The method defined in claim 1 wherein the well is a geothermal fluid producing well.
Claim 5
Dependent Claim
13 words
The method defined in claim 3 wherein the geothermal fluid is dry steam.
Claim 6
Dependent Claim
26 words
The method defined in claim 1 wherein the cutting or scraping tool is removed from the liner after the heads of the plugs have been removed.
Claim 7
Dependent Claim
22 words
The method defined in claim 1 wherein the plug-containing liner is run into the well through a pressure seal at the surface.
Claim 8
Independent Claim
121 words
A method for converting a dry steam-producing geothermal well into an injection well for liquid comprising: (a) inserting into the openings in the sidewall of a preperforated liner solid hollow plugs having a hollow shank portion extending through the opening, a flange end adapted to fit in fluid tight engagement against the exterior of the liner around the opening and a hollow head portion protruding into the interior of the liner, (b) running the resulting plug-containing liner into the well, (c) running a cutting or scraping tool down the inside of the liner to remove the heads of the plugs and open the openings in the liner, and (d) injecting liquid down the well, through the liner and into the reservoir.
Claim 9
Independent Claim
121 words
A method for converting a dry steam-producing geothermal well into an injection well for liquid comprising: (a) inserting into the openings in the sidewall of a preperforated liner solid hollow plugs having a hollow shank portion extending through the opening, a flange end adapted to fit in fluid tight engagement against the exterior of the liner around the opening and a hollow head portion protruding into the interior of the liner, (b) running the resulting plug-containing liner into the well, (c) running a cutting or scraping tool down the inside of the liner to remove the heads of the plugs and open the openings in the liner, and (d) injecting liquid down the well, through the liner and into the reservoir.
Claim 10
Dependent Claim
23 words
The method defined in claim 7 wherein dry steam is produced from the well around the outside of the liner during step (b).
Claim 11
Dependent Claim
26 words
The method defined in claim 7 wherein the cutting or scraping tool is removed from the liner after the heads of the plugs have been removed.
Claim 12
Dependent Claim
22 words
The method defined in claim 7 wherein the plug-containing liner is run into the well through a pressure seal at the surface.
Claim 13
Dependent Claim
17 words
The method defined in claim 7 wherein the liquid injected in step (d) is a geothermal brine.
Claim 14
Independent Claim
75 words
A method for placing a perforated liner in a well penetrating a reservior which contains a high pressure fluid, comprising: (a) inserting, into perforations in the sidewall of the liner, closed hollow plugs, said plugs each having a head end protruding into the interior of the liner and a flange portion in contact with the exterior of the liner; (b) running the plug-containing liner into the well; and (c) opening the perforations in the liner.
Claim 15
Independent Claim
75 words
A method for placing a perforated liner in a well penetrating a reservior which contains a high pressure fluid, comprising: (a) inserting, into perforations in the sidewall of the liner, closed hollow plugs, said plugs each having a head end protruding into the interior of the liner and a flange portion in contact with the exterior of the liner; (b) running the plug-containing liner into the well; and (c) opening the perforations in the liner.