Patent US4497778A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4497778A Expired / Lapsed US ⏱️ 0.0 years remaining

Microbial leaching of sulphide-containing ores

Assignee: University College Cardiff Consultants Ltd
•
Filing: 1984-02-07
•
Granted: 1985-02-05
•
Expires: 2004-02-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process of extracting metals from a material containing at least 10% by weight of pyrite and selected from the group consisting of ores containing sulphide, concentrates of such ores and mixtures of such ores and/or concentrates by microbial leaching which comprises roasting the material before the microbial leaching to convert part of the pyrite to pyrrhotite and thus remove part of the sulphur which is present as pyrite without the formation of any significant amount of metal oxide, the conversion corresponding to removal of at least 10% but not more than 50% of the sulphur present in the pyrite, and only thereafter leaching the thus roasted ore by treatment with bacteria, to extract the metals. The process is characterized by its improved efficiency in metal extraction.

Inventors

  • 👤 Frederick D. Pooley

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 19:47
CPC Classifications
C; C22; C22B; C22B3/00; C22B3/18; C22B1/00; C22B1/02; Y; Y02; Y02P; Y02P10/00; Y02P10/20; Y10; Y10S; Y10S423/00; Y10S423/09; Y10S423/17; Y10S435/00; Y10S435/8215; Y10S435/822; Y10S435/832

Claims Analysis

Total Claims: 21
Claim 1
Independent Claim 112 words
A process of extracting metals from a material containing at least 10% by weight of pyrite and selected from the group consisting of ores containing sulphide, concentrates of such ores and mixtures of such ores and/or concentrates by microbial leaching which comprises roasting the material before said microbial leaching to convert part of the pyrite to pyrrhotite and thus remove part of the sulphur which is present as pyrite with substantially no metal oxide formation, the conversion corresponding to removal of at least 10% but not more than 50% of the sulphur present in the pyrite, and only thereafter leaching the thus roasted ore by treatment with bacteria, to extract said metals.
Claim 2
Dependent Claim 112 words
A process of extracting metals from a material containing at least 10% by weight of pyrite and selected from the group consisting of ores containing sulphide, concentrates of such ores and mixtures of such ores and/or concentrates by microbial leaching which comprises roasting the material before said microbial leaching to convert part of the pyrite to pyrrhotite and thus remove part of the sulphur which is present as pyrite with substantially no metal oxide formation, the conversion corresponding to removal of at least 10% but not more than 50% of the sulphur present in the pyrite, and only thereafter leaching the thus roasted ore by treatment with bacteria, to extract said metals.
Claim 3
Dependent Claim 20 words
A process as claimed in claim 1 in which said material contains from 10 to 70% by weight of pyrite.
Claim 4
Dependent Claim 49 words
A process as claimed in claim 1 in which said material is a mixture containing a component selected from the group consisting of sulphide-rich ores and concentrates of sulphide ores which has been added to raise the pyrite content of said mixture to from 10 to 70% by weight.
Claim 5
Dependent Claim 25 words
A process as claimed in claim 1 in which the proportion of sulphur removed corresponds to from 10 to 25% by weight of said sulphide.
Claim 6
Dependent Claim 26 words
A process as claimed in claim 1, in which said material is mixed with a member of the group consisting of coal or charcoal before roasting.
Claim 7
Dependent Claim 20 words
A process as claimed in claim 1, in which said roasting is carried out under a blanket of non-oxidising gas.
Claim 8
Dependent Claim 17 words
A process as claimed in claim 1, in which copper and zinc are extracted in said leaching.
Claim 9
Dependent Claim 24 words
A process as claimed in claim 1, in which a tin-bearing ore is upgraded by said leaching and is recovered as a solid residue.
Claim 10
Dependent Claim 37 words
A process as claimed in claim 1, in which said material contains silver and after said leaching process, sludge and fines are separated from the leach liquor and treated by a cyanide process to extract silver therefrom.
Claim 11
Dependent Claim 109 words
In a process of extracting metals from a material containing at least 10% by weight of pyrite and selected from the group consisting of ores containing sulphide, concentrates of such ores and mixtures of such ores and concentrates in which said metals are leached from said material using an aqueous leaching liquid containing an effective concentration of multiplying bacteria Thiobacillus ferro oxidans, the improvement which comprises subjecting said material before said leaching to a roasting process in which at least 10% but not more than 50% of the sulphur present in said pyrite is removed to convert part of the pyrite to pyrrhotite with substantially no metal oxide formation.
Claim 12
Dependent Claim 109 words
In a process of extracting metals from a material containing at least 10% by weight of pyrite and selected from the group consisting of ores containing sulphide, concentrates of such ores and mixtures of such ores and concentrates in which said metals are leached from said material using an aqueous leaching liquid containing an effective concentration of multiplying bacteria Thiobacillus ferro oxidans, the improvement which comprises subjecting said material before said leaching to a roasting process in which at least 10% but not more than 50% of the sulphur present in said pyrite is removed to convert part of the pyrite to pyrrhotite with substantially no metal oxide formation.
Claim 13
Dependent Claim 33 words
In a process as claimed in claim 10 the further improvement in which the proportion of sulphur removed in said roasting process corresponds to from 10 to 25% by weight of said sulphide.
Claim 14
Dependent Claim 27 words
In a process as claimed in claim 10, the further improvement wherein said material subjected to said roasting contains from 10 to 70% by weight of pyrite.
Claim 15
Dependent Claim 48 words
In a process as claimed in claim 10, the further improvement in which said material is a mixture containing an ore and concentrate of high sulphide content admixed in such a proportion as to raise the pyrite content of said material to from 10 to 70% by weight.
Claim 16
Dependent Claim 30 words
In a process as claimed in claim 10, the further improvement in which said material is mixed with a member of the group consisting of coal or charcoal before roasting.
Claim 17
Dependent Claim 24 words
In a process as claimed in claim 10, the further improvement in which said roasting is carried out under a blanket of non-oxidising gas.
Claim 18
Dependent Claim 24 words
In a process as claimed in claim 10, the further improvement in which copper and zinc are extracted from said material in said leaching.
Claim 19
Dependent Claim 32 words
In a process as claimed in claim 10, the further improvement in which a tin-bearing ore contained in said material is upgraded by said leaching and is recovered as a solid residue.
Claim 20
Dependent Claim 45 words
In a process as claimed in claim 10, the further improvement in which said material contains silver and gold and after said leaching process, sludge and fines are separated from said leaching liquid and treated by a cyanide process to extract silver and gold therefrom.
Claim 21
Dependent Claim 25 words
A process according to claim 1 wherein the roasting is carried out at a temperature of between 450° C. and 900° C. under reducing conditions.

References Cited (Backward Citations)

US679330A Cited
US709482A Cited
US4177067A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1988-02-05 1988-08-06 1989-02-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1992-02-05 1992-08-06 1993-02-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1996-02-05 1996-08-06 1997-02-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag