Patent US2129000A successfully refreshed from Google Patents.
Patent US4496191A successfully refreshed from Google Patents.
US4496191A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Selective mining from horizontal holes
Assignee: Consolidation Coal Co
•
Filing: 1982-09-01
•
Granted: 1985-01-29
•
Expires: 2002-09-01
Abstract
Abstract A method for mining high grade ore from an ore body uses a near horizontal hole. The horizontal hole is bored into the ore body through as many of the high grade portions as possible. A jet mining tool is inserted into the hole to the high grade portion farthest from the tool insertion location and that portion of the high grade ore is removed. The tool is then pulled out of the hole until the jets are in a high grade portion which is adjacent the high grade portion previously mined and this portion is then jet mined. The process is repeated until all of the high grade portions of the ore body have been mined. The mined material is removed through the horizontally bored hole.
Inventors
- 👤 Dai-Shik Choi
- 👤 David L. McCain
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-06 18:16
CPC Classifications
E; E21; E21C; E21C41/00; E21C41/16; E21C37/00; E21C37/06; E21C37/12
Claims Analysis
Total Claims: 5
Claim 1
Independent Claim
193 words
A method of selectively mining only the high grade portion of an ore body comprising: (a) locating said high grade portions in said ore body; (b) forming an access to said ore body of a depth and width to permit horizontally drilling into said ore body; (c) boring a horizontal hole into said ore body so that said hole penetrates as many of said high grade portions as possible; (d) providing casing in said horizontal hole except at the high grade portion farthest from the said trench; (e) inserting a jet mining tool into the horizontally bored hole to the high grade portion farthest from the said trench; (f) jet mining said high grade portion in a manner to slurry said mined material from said high grade portion of said ore out of said horizontally bored hole and casing; (g) collecting said slurry material for further processing; (h) moving said jet mining tool from said farthest location to the next adjacent high grade portion along said horizontally bored hole and removing the casing from that portion; and (i) repeating steps (f), (g) and (h) until all the located high grade portions are mined.
Claim 2
Independent Claim
193 words
A method of selectively mining only the high grade portion of an ore body comprising: (a) locating said high grade portions in said ore body; (b) forming an access to said ore body of a depth and width to permit horizontally drilling into said ore body; (c) boring a horizontal hole into said ore body so that said hole penetrates as many of said high grade portions as possible; (d) providing casing in said horizontal hole except at the high grade portion farthest from the said trench; (e) inserting a jet mining tool into the horizontally bored hole to the high grade portion farthest from the said trench; (f) jet mining said high grade portion in a manner to slurry said mined material from said high grade portion of said ore out of said horizontally bored hole and casing; (g) collecting said slurry material for further processing; (h) moving said jet mining tool from said farthest location to the next adjacent high grade portion along said horizontally bored hole and removing the casing from that portion; and (i) repeating steps (f), (g) and (h) until all the located high grade portions are mined.
Claim 3
Dependent Claim
27 words
A method as described in claim 1 wherein said method is performed in a plurality of parallelly drilled horizontal holes in said ore body from said access.
Claim 4
Dependent Claim
17 words
A method as described in claim 1 or 2 wherein access is acquired by forming a trench.
Claim 5
Dependent Claim
18 words
A method as described in claim 1 or 2 wherein said access is acquired by forming a tunnel.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1988-01-29 | 1988-07-30 | 1989-01-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1992-01-29 | 1992-07-30 | 1993-01-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1996-01-29 | 1996-07-30 | 1997-01-29 | $7700.00 | Window Closed / Lapsed |