← Back to Patent Explorer
US4483399A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of deep drilling

Assignee: Individual
•
Filing: 1981-02-12
•
Granted: 1984-11-20
•
Expires: 2001-02-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Deep drilling is facilitated by the following steps practiced separately or in any combination: (1) Periodically and sequentially fracturing zones adjacent the bottom of the bore hole with a thixotropic fastsetting fluid that is accepted into the fracture to overstress the zone, such fracturing and injection being periodic as a function of the progression of the drill. (2) Casing the bore hole with ductile, pre-annealed casing sections, each of which is run down through the previously set casing and swaged in situ to a diameter large enough to allow the next section to run down through it. (3) Drilling the bore hole using a drill string of a low density alloy and a high density drilling mud so that the drill string is partially floated.

Inventors

  • 👤 Stirling A. Colgate

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 12:54
CPC Classifications
E; E21; E21B; E21B21/00; E21B21/003; E21B17/00; E21B29/00; E21B29/10; E21B43/00; E21B43/02; E21B43/10; E21B43/103; E21B43/105; E21B7/00; E21B7/20

Claims Analysis

Total Claims: 19
Claim 1
Independent Claim 178 words
A method of preventing drilling fluid losses and blowouts during the drilling of a bore hole comprising the step of periodically and sequentially fracturing a zone at the bottom of the bore hole with a thixotropic fast-setting fluid and injecting such fluid into the zone to overstress the zone, the fracturing and injecting being periodic as a function of the progression of the drill, the volume of fluid injected in each injection being of the order of r 3 /300 where r is a selected value for the extent of the fracture into the zone from the bore hole, the number of injections being from about two to about ten per each meter of drill progression, such injections being made along the entire extent of the well bore and the fluid having a gel strength Gs approximately equal to (dτ) 2 /2B where dτ is a selected incremental stress to be added by each fracture and injection and B is the bulk modulus of the formation material, which the fluid fractures and into which the fluid is injected.
Claim 2
Independent Claim 178 words
A method of preventing drilling fluid losses and blowouts during the drilling of a bore hole comprising the step of periodically and sequentially fracturing a zone at the bottom of the bore hole with a thixotropic fast-setting fluid and injecting such fluid into the zone to overstress the zone, the fracturing and injecting being periodic as a function of the progression of the drill, the volume of fluid injected in each injection being of the order of r 3 /300 where r is a selected value for the extent of the fracture into the zone from the bore hole, the number of injections being from about two to about ten per each meter of drill progression, such injections being made along the entire extent of the well bore and the fluid having a gel strength Gs approximately equal to (dτ) 2 /2B where dτ is a selected incremental stress to be added by each fracture and injection and B is the bulk modulus of the formation material, which the fluid fractures and into which the fluid is injected.
Claim 3
Dependent Claim 38 words
A method according to claim 1 and further comprising the step of casing the bore hole down to a distance above the bottom that is selected to minimize break-out and loss of drilling mud to previously pre-stressed zones.
Claim 4
Dependent Claim 47 words
A method according to claim 2 wherein the bore hole is cased with ductile and pre-annealed casing sections, each section being run in through the previously set casing and swaged in situ to a diameter large enough to allow the next section to be run through it.
Claim 5
Dependent Claim 78 words
A method according to claim 3 wherein each casing section is explosive-swaged using a ribbon of slow explosive spirally pre-wound inside the section at a pitch angle of the order of 1:20 so that the progressive phase velocity along the length of the casing is slower than the normal detonation velocity by the pitch angle and, therefore, the mud between the casing and the bore hole wall can escape ahead of the expanding section rather than being trapped.
Claim 6
Dependent Claim 36 words
A method according to claim 1 wherein the bore hole is drilled using a drill string made of a low density alloy and a high density drilling mud such that the drill string is partially floated.
Claim 7
Dependent Claim 16 words
A method according to claim 5 wherein the drill string is made of a titanium alloy.
Claim 8
Dependent Claim 18 words
A method according to claim 6 wherein the titanium alloy is titanium 4-6 (4% vanadium and 6% aluminum).
Claim 9
Dependent Claim 20 words
A method according to claim 5 wherein the drilling mud has a specific gravity of not less than about 2.0.
Claim 10
Independent Claim 114 words
A method of setting casing in a bore hole comprising the step of lowering each casing length through previously set casing and swaging the section to expand it to a diameter large enough to allow the next casing section to pass down through it, each casing section being explosive-swaged using a ribbon of slow-explosive spirally pre-wound inside the section at a pitch angle of the order of 1:20 so that the progressive phase velocity along the length of the casing is slower than the normal detonation velocity by the pitch angle and, therefore, the mud between the casing and the bore hole wall can escape ahead of the expanding section rather than being trapped.
Claim 11
Independent Claim 114 words
A method of setting casing in a bore hole comprising the step of lowering each casing length through previously set casing and swaging the section to expand it to a diameter large enough to allow the next casing section to pass down through it, each casing section being explosive-swaged using a ribbon of slow-explosive spirally pre-wound inside the section at a pitch angle of the order of 1:20 so that the progressive phase velocity along the length of the casing is slower than the normal detonation velocity by the pitch angle and, therefore, the mud between the casing and the bore hole wall can escape ahead of the expanding section rather than being trapped.
Claim 12
Dependent Claim 11 words
A method according to claim 9 wherein the explosive is nitroguanidine.
Claim 13
Independent Claim 116 words
A method of swaging a casing in a bore hole comprising the steps of affixing to the inside wall of the casing a ribbon of slow explosive spirally wound at a pitch angle of about 1:20 so that the progressive phase velocity along the length of the casing is slower than the normal detonation velocity by the pitch angle and, therefore, mud between the casing and the bore hole wall can escape ahead of the expanding casing rather than being trapped, and igniting the upper end of the explosive to cause the explosion to detonate progressively downward and generates pressure that progressively expands the casing radially outwardly with respect to the axis of the bore hole.
Claim 14
Independent Claim 116 words
A method of swaging a casing in a bore hole comprising the steps of affixing to the inside wall of the casing a ribbon of slow explosive spirally wound at a pitch angle of about 1:20 so that the progressive phase velocity along the length of the casing is slower than the normal detonation velocity by the pitch angle and, therefore, mud between the casing and the bore hole wall can escape ahead of the expanding casing rather than being trapped, and igniting the upper end of the explosive to cause the explosion to detonate progressively downward and generates pressure that progressively expands the casing radially outwardly with respect to the axis of the bore hole.
Claim 15
Independent Claim 186 words
A method of drilling a bore hole comprising the step of sequentially overstressing zones adjacent the bottom of the hole preiodically fracturing the zone with a thixotropic fast-setting fluid and injecting such fluid into the zone at a rate of from about 2 to about 10 fractures and injections per meter of drill progression and periodically running casing down to within several casing lengths of the bottom of the hole to prevent fluid loss in the previously drilled and overstressed portion of the hole during the overstressing of the zone adjacent the bottom of the hole, the fluid having a gel strength Gs approximately equal to (dτ) 2 /2B where dτ is a selected incremental stress to be added by each fracture and injection and B is the bulk modulus of the formation material which the fluid fractures and into which the fluid is injected, and the hole being cased at a constant diameter by running each casing length down within the previously set casing and swaging said casing length to a diameter large enough to enable the next casing length to pass down through it.
Claim 16
Independent Claim 186 words
A method of drilling a bore hole comprising the step of sequentially overstressing zones adjacent the bottom of the hole preiodically fracturing the zone with a thixotropic fast-setting fluid and injecting such fluid into the zone at a rate of from about 2 to about 10 fractures and injections per meter of drill progression and periodically running casing down to within several casing lengths of the bottom of the hole to prevent fluid loss in the previously drilled and overstressed portion of the hole during the overstressing of the zone adjacent the bottom of the hole, the fluid having a gel strength Gs approximately equal to (dτ) 2 /2B where dτ is a selected incremental stress to be added by each fracture and injection and B is the bulk modulus of the formation material which the fluid fractures and into which the fluid is injected, and the hole being cased at a constant diameter by running each casing length down within the previously set casing and swaging said casing length to a diameter large enough to enable the next casing length to pass down through it.
Claim 17
Dependent Claim 48 words
A method according to claim 12 wherein the overstressed zone is stressed to a pressure roughly equal to the overburden pressure at the full depth of the bore hole, and wherein the overstress zone extends from about 5 to about 10 bore diameters out from the bore hole.
Claim 18
Dependent Claim 114 words
A method according to claim 12 wherein the swaging step includes the steps of prewinding a ribbon of slow explosive spirally inside the section at a pitch angle of the order of 1:20 so that the progressive phase velocity along the length of the casing is slower than the normal detonation velocity by the pitch angle and, therefore, the mud between the casing and the bore hole wall can escape ahead of the expanding section rather than being trapped, and igniting the upper end of the explosive to cause an explosion to detonate progressively downward and generate pressure that progressively expands the casing radially outwardly with respect to the axis of the bore hole.
Claim 19
Independent Claim 40 words
A method according to any of claims 12, 13 or 14 wherein the bore hole is drilled using a drill string made of a low density alloy and high density drilling mud such that the drill string is partially floated.

References Cited (Backward Citations)

US1233888A Cited
US1880218A Cited
US2214226A Cited
US2447629A Cited
US2583316A Cited
US3228469A Cited
US3188850A Cited
US3409093A Cited
US3616855A Cited
US3973628A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-11-20 1988-05-21 1988-11-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-11-20 1992-05-21 1992-11-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-11-20 1996-05-21 1996-11-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag