← Back to Patent Explorer
US3228469A Expired / Lapsed US ⏱️ 0.0 years remaining

Preventing and curing lost circulation

Assignee: Atlantic Richfield Co
•
Filing: 1962-12-17
•
Granted: 1966-01-11
•
Expires: 1982-12-17
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Loyd R Kern
  • 👤 Thomas K Perkins
  • 👤 Thomas F Moore
  • 👤 Jr William J Mcguire

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 12:14
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/50; C09K8/516

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 163 words
DURING EARTH WELL BORE DRILLING, A PROCESS FOR CURING A LOST CIRCULATION ZONE IN A SUBSURFACE EARTH FORMATION COMPRISING INJECTING INTO SAID WELL BORE A PREDETERMINED VOLUME OF A LOST CIRCULATION CONTROL MIXTURE OF A FLUID AND SOLID PARTICLES, SAID MIXTURE HAVING A FILTER CAKE TEST THICKNESS OF AT LEAST 4.0 INCHES IN A 30 MINUTE MODIFIED API TEST SO AS TO FORM A THICK FILTER CAKE IN SAID LOST CIRCULATION ZONE, SAID FILTER CAKE BEING SUFFICIENTLY PERMEABLE TO ALLOW ADDED AMOUNTS OF FILTER CAKE FROM SAID MIXTURE TO BE DEPOSITED ON AND DEHYDRATED THROUGH THE FILTER CAKE ALREADY DEPOSITED IN SAID LOST CIRCULATION ZONE, FORCING AT TIME SPACED INTERVALS DISCRETE VOLUMES OF SAID LOST CIRCULATION CONTROL MIXTURE INTO SAID LOST CIRCULATION ZONE, EACH OF SAID DISCRETE VOLUMES BEING SEPARATED BY AN INTERVAL OF AT LEAST 15 MINUTES DURATION, AND CONTINUATION SAID DISCRETE VOLUMES UNTIL THE PRESSURE EXERTED BY SAID LOST CIRCULATION CONTROL MIXTURE ON SAID LOST CIRCULATION ZONE EXCEEDS A PREDETERMINED PRESSURE.
Claim 2
Dependent Claim 163 words
DURING EARTH WELL BORE DRILLING, A PROCESS FOR CURING A LOST CIRCULATION ZONE IN A SUBSURFACE EARTH FORMATION COMPRISING INJECTING INTO SAID WELL BORE A PREDETERMINED VOLUME OF A LOST CIRCULATION CONTROL MIXTURE OF A FLUID AND SOLID PARTICLES, SAID MIXTURE HAVING A FILTER CAKE TEST THICKNESS OF AT LEAST 4.0 INCHES IN A 30 MINUTE MODIFIED API TEST SO AS TO FORM A THICK FILTER CAKE IN SAID LOST CIRCULATION ZONE, SAID FILTER CAKE BEING SUFFICIENTLY PERMEABLE TO ALLOW ADDED AMOUNTS OF FILTER CAKE FROM SAID MIXTURE TO BE DEPOSITED ON AND DEHYDRATED THROUGH THE FILTER CAKE ALREADY DEPOSITED IN SAID LOST CIRCULATION ZONE, FORCING AT TIME SPACED INTERVALS DISCRETE VOLUMES OF SAID LOST CIRCULATION CONTROL MIXTURE INTO SAID LOST CIRCULATION ZONE, EACH OF SAID DISCRETE VOLUMES BEING SEPARATED BY AN INTERVAL OF AT LEAST 15 MINUTES DURATION, AND CONTINUATION SAID DISCRETE VOLUMES UNTIL THE PRESSURE EXERTED BY SAID LOST CIRCULATION CONTROL MIXTURE ON SAID LOST CIRCULATION ZONE EXCEEDS A PREDETERMINED PRESSURE.

References Cited (Backward Citations)

US2135589A Cited
US2124495A Cited
US2308425A Cited
US2573690A Cited
US2800964A Cited
US3136360A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1969-01-10 1969-07-12 1970-01-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1973-01-10 1973-07-12 1974-01-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1977-01-10 1977-07-12 1978-01-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag