Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
428 words
Method for setting a cement plug in the wide-mouth shaft of an earth cavern, comprising the steps of: (a) filling the cavern with a fluid; (b) installing a fluid fill pipe inside an elongate, inflatable receptacle, the receptacle is in a deflated condition, and the fill pipe has an open end positioned within the deflated receptacle; (c) lowering the deflated receptacle into the cavern through a substantially vertical first casing, the top end of the casing is at the earth's surface, and the bottom end is at the mouth of the cavern; (d) extending the length of the fluid fill pipe as the deflated receptacle is being lowered, and simultaneously lowering a cement fill pipe through the first casing, the cement fill pipe is adjacent to the fluid fill pipe, and the lower end of said pipe is positioned above the receptacle; (e) holding the deflated receptacle at a first predetermined point in the first casing during the lowering step; (f) installing a packer tool on the fluid fill pipe and the cement fill pipe, at the earth's surface, as the deflated receptacle is being held at the first predetermined point; (g) continuing to lower the receptacle and packer tool until the receptacle reaches a second predetermined point below the lower end of the first casing, at which point the packer tool is positioned above the lower end of the first casing; (h) setting the packer tool against the first casing; (i) filling the receptacle, through the fluid fill pipe, with enough fluid to cause it to inflate and seat against the sides of the earth cavern; (j) passing a given amount of cement slurry down the cement fill pipe, such that the cement fills that part of the cavern defined between the top of the receptacle and the bottom end of the first casing; (k) pulling the cement fill pipe out of the first casing, while the cement slurry is wet; (l) allowing the cement slurry to harden, to define a cement plug in the cavern; (m) drilling into the cement plug and terminating the drilled hole above the inflated receptacle; (n) lowering a second casing into the first casing, such that the top end of the second casing is at the earth's surface and the bottom end is above the bottom end of the drilled hole; (o) cementing the second casing to the drilled hole and to the first casing; and (p) drilling through the cement plug below the bottom end of the second casing until the drill contacts the inflated receptacle and ruptures said receptacle.
Claim 2
Dependent Claim
428 words
Method for setting a cement plug in the wide-mouth shaft of an earth cavern, comprising the steps of: (a) filling the cavern with a fluid; (b) installing a fluid fill pipe inside an elongate, inflatable receptacle, the receptacle is in a deflated condition, and the fill pipe has an open end positioned within the deflated receptacle; (c) lowering the deflated receptacle into the cavern through a substantially vertical first casing, the top end of the casing is at the earth's surface, and the bottom end is at the mouth of the cavern; (d) extending the length of the fluid fill pipe as the deflated receptacle is being lowered, and simultaneously lowering a cement fill pipe through the first casing, the cement fill pipe is adjacent to the fluid fill pipe, and the lower end of said pipe is positioned above the receptacle; (e) holding the deflated receptacle at a first predetermined point in the first casing during the lowering step; (f) installing a packer tool on the fluid fill pipe and the cement fill pipe, at the earth's surface, as the deflated receptacle is being held at the first predetermined point; (g) continuing to lower the receptacle and packer tool until the receptacle reaches a second predetermined point below the lower end of the first casing, at which point the packer tool is positioned above the lower end of the first casing; (h) setting the packer tool against the first casing; (i) filling the receptacle, through the fluid fill pipe, with enough fluid to cause it to inflate and seat against the sides of the earth cavern; (j) passing a given amount of cement slurry down the cement fill pipe, such that the cement fills that part of the cavern defined between the top of the receptacle and the bottom end of the first casing; (k) pulling the cement fill pipe out of the first casing, while the cement slurry is wet; (l) allowing the cement slurry to harden, to define a cement plug in the cavern; (m) drilling into the cement plug and terminating the drilled hole above the inflated receptacle; (n) lowering a second casing into the first casing, such that the top end of the second casing is at the earth's surface and the bottom end is above the bottom end of the drilled hole; (o) cementing the second casing to the drilled hole and to the first casing; and (p) drilling through the cement plug below the bottom end of the second casing until the drill contacts the inflated receptacle and ruptures said receptacle.
Claim 3
Dependent Claim
587 words
Method for setting a cement plug in the wide-mouth shaft of an earth cavern, comprising the steps of: (a) filling the cavern with a liquid; (b) installing a liquid fill pipe inside an elongate, inflatable receptacle, the receptacle is in a deflated condition, and the fill pipe has an open end positioned within the deflated receptacle; (c) encasing the deflated receptacle in a girdle member, which includes a girdle body and a detachable cap fastened to the body; (d) securing a release means to the detachable cap; (e) lowering the girdle member and deflated receptacle into the cavern through a substantially vertical first casing, the top end of the casing is at the earth's surface, and the bottom end is at the mouth of the cavern; (f) extending the length of the liquid fill pipe as the girdle member and deflated receptacle are being lowered, and simultaneously lowering a cement fill pipe through the first casing, the cement fill pipe is adjacent to the liquid fill pipe, and the lower end of said pipe is positioned above the girdle cap; (g) holding the girdle member and deflated receptacle at a first predetermined point in the first casing during the lowering step; (h) installing a packer tool on the liquid fill pipe and the cement fill pipe, at the earth's surface, as the girdle member and deflated receptacle are being held at the first predetermined point; (i) operating the release means, from the earth's surface, to sever the detachable cap from the girdle body; (j) allowing the girdle body to drop away from the deflated receptacle and drift downwardly toward the cavern floor; (k) continuing to lower the deflated receptacle, and the packer tool, until the deflated receptacle reaches a second predetermined point below the lower end of the first casing, at which point the packer tool is positioned above the lower end of the first casing; (l) setting the packer tool against the first casing; (m) filling the receptacle through the liquid fill pipe, with enough liquid to cause it to inflate and seat against the sides of the earth cavern, the fill liquid has a density less than the liquid in the earth cavern; (n) passing a given amount of cement slurry down the cement fill pipe, such that the cement fills a section of the cavern above the inflated receptacle and the receptacle supports the cement; (o) pulling the cement fill pipe upwardly, while the cement slurry is wet, to a point above the cemented section; (p) allowing the cement slurry to harden, to define the first stage of a cement plug in the cavern; (q) repeating steps (n), (o), and (p), to provide additional stages of the cement plug above the first stage, until said plug completely fills that part of the cavern defined between the top of the receptacle and the bottom end of the first casing; (r) pulling the liquid fill pipe and the cement fill pipe out of the first casing; (s) drilling into the cement plug and terminating the drilled hole above the inflated receptacle; (t) lowering a second casing into the first casing, such that the top end of said casing is at the earth's surface and the bottom end is above the bottom end of the drilled hole; (u) cementing the second casing to the drilled hole and to the first casing; and (v) drilling through the cement plug below the bottom end of the second casing until the drill contacts the inflated receptacle and ruptures said receptacle.
Claim 4
Dependent Claim
587 words
Method for setting a cement plug in the wide-mouth shaft of an earth cavern, comprising the steps of: (a) filling the cavern with a liquid; (b) installing a liquid fill pipe inside an elongate, inflatable receptacle, the receptacle is in a deflated condition, and the fill pipe has an open end positioned within the deflated receptacle; (c) encasing the deflated receptacle in a girdle member, which includes a girdle body and a detachable cap fastened to the body; (d) securing a release means to the detachable cap; (e) lowering the girdle member and deflated receptacle into the cavern through a substantially vertical first casing, the top end of the casing is at the earth's surface, and the bottom end is at the mouth of the cavern; (f) extending the length of the liquid fill pipe as the girdle member and deflated receptacle are being lowered, and simultaneously lowering a cement fill pipe through the first casing, the cement fill pipe is adjacent to the liquid fill pipe, and the lower end of said pipe is positioned above the girdle cap; (g) holding the girdle member and deflated receptacle at a first predetermined point in the first casing during the lowering step; (h) installing a packer tool on the liquid fill pipe and the cement fill pipe, at the earth's surface, as the girdle member and deflated receptacle are being held at the first predetermined point; (i) operating the release means, from the earth's surface, to sever the detachable cap from the girdle body; (j) allowing the girdle body to drop away from the deflated receptacle and drift downwardly toward the cavern floor; (k) continuing to lower the deflated receptacle, and the packer tool, until the deflated receptacle reaches a second predetermined point below the lower end of the first casing, at which point the packer tool is positioned above the lower end of the first casing; (l) setting the packer tool against the first casing; (m) filling the receptacle through the liquid fill pipe, with enough liquid to cause it to inflate and seat against the sides of the earth cavern, the fill liquid has a density less than the liquid in the earth cavern; (n) passing a given amount of cement slurry down the cement fill pipe, such that the cement fills a section of the cavern above the inflated receptacle and the receptacle supports the cement; (o) pulling the cement fill pipe upwardly, while the cement slurry is wet, to a point above the cemented section; (p) allowing the cement slurry to harden, to define the first stage of a cement plug in the cavern; (q) repeating steps (n), (o), and (p), to provide additional stages of the cement plug above the first stage, until said plug completely fills that part of the cavern defined between the top of the receptacle and the bottom end of the first casing; (r) pulling the liquid fill pipe and the cement fill pipe out of the first casing; (s) drilling into the cement plug and terminating the drilled hole above the inflated receptacle; (t) lowering a second casing into the first casing, such that the top end of said casing is at the earth's surface and the bottom end is above the bottom end of the drilled hole; (u) cementing the second casing to the drilled hole and to the first casing; and (v) drilling through the cement plug below the bottom end of the second casing until the drill contacts the inflated receptacle and ruptures said receptacle.
Claim 5
Dependent Claim
27 words
The method of claim 2 in which the earth cavern is a salt cavern filled with brine having a density of at least 10.2 pounds pe gallon.
Claim 6
Dependent Claim
30 words
The method of claim 3 in which the receptacle is a balloon structure, and the balloon structure is filled with brine having a density of about 10.0 pounds per gallon.
Claim 7
Dependent Claim
17 words
The method of claim 4 in which the balloon structure is fabricated of a synthetic resin material.
Claim 8
Dependent Claim
35 words
The method of claim 2 which includes the steps of: (a) attaching a weight to the bottom end of the deflated receptacle; and (b) attaching a weight to the bottom end of the girdle body.
Claim 9
Dependent Claim
209 words
Apparatus for setting a cement plug in the shaft of a wide-mouth earth cavern filled with a fluid, which comprises: (a) an elongate, deflated receptacle, the receptacle is capable of being inflated by filling it with a fluid; (b) a fluid fill pipe, the fluid fill pipe extends into the deflated receptacle and it has an open end positioned inside the deflated receptacle, to enable the receptacle to be filled with said fluid; (c) a girdle member which includes a girdle body and a detachable cap fastened to the body, the girdle member, in operating position, encases the deflated receptacle; (d) means for releasing the girdle member from the deflated receptacle; (e) a cement fill pipe, the cement fill pipe, in operating position, is positioned adjacent to the fluid fill pipe, and the cement fill pipe has an open end positioned above the receptacle, such that a cement slurry can be delivered into the earth cavern at a point above the deflated receptacle; (f) a packer tool installed on the fluid fill pipe and cement fill pipe above the girdle member and deflated receptacle, the packer tool is capable of being set against a casing through which the deflated receptacle and girdle member are lowered into the earth cavern.
Claim 10
Dependent Claim
209 words
Apparatus for setting a cement plug in the shaft of a wide-mouth earth cavern filled with a fluid, which comprises: (a) an elongate, deflated receptacle, the receptacle is capable of being inflated by filling it with a fluid; (b) a fluid fill pipe, the fluid fill pipe extends into the deflated receptacle and it has an open end positioned inside the deflated receptacle, to enable the receptacle to be filled with said fluid; (c) a girdle member which includes a girdle body and a detachable cap fastened to the body, the girdle member, in operating position, encases the deflated receptacle; (d) means for releasing the girdle member from the deflated receptacle; (e) a cement fill pipe, the cement fill pipe, in operating position, is positioned adjacent to the fluid fill pipe, and the cement fill pipe has an open end positioned above the receptacle, such that a cement slurry can be delivered into the earth cavern at a point above the deflated receptacle; (f) a packer tool installed on the fluid fill pipe and cement fill pipe above the girdle member and deflated receptacle, the packer tool is capable of being set against a casing through which the deflated receptacle and girdle member are lowered into the earth cavern.
Claim 11
Dependent Claim
17 words
The apparatus of claim 7 in which the deflated receptacle is fabricated of a synthetic resin material.
Claim 12
Dependent Claim
20 words
The apparatus of claim 7 in which the girdle release means is a line secured to the detachable girdle cap.
Claim 13
Dependent Claim
34 words
The apparatus of claim 7 in which a first weight is attached to the bottom end of the deflated receptacle, and a second weight is attached to the bottom end of the girdle body.